Air Leak Test with closed APU Doors
TASK 49-00-00-790-005-A
Air Leak Test with closed APU Doors
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 49-00-00-860-103-A ** ON A/C NOT FOR ALL
Subtask 49-00-00-480-055-A ** ON A/C NOT FOR ALL
Subtask 49-00-00-410-074-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:25:53 UTC
Air Leak Test with closed APU Doors
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.CP3010) | dry developer |
| (Material No.08CKB9) | Cleaner-Hydraulic Spillage Absorbent powder - |
| (Material No.14QFB1) | Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 315 | TAIL CONE APU AND ACCESSORY COMPARTMENT |
| 316 | TAIL CONE APU AND ACCESSORY COMPARTMENT |
| 315AL, 316AR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-14-00-614-002-A | Pressurization of the Hydraulic Reservoirs through the Ground Connector |
| TASK 29-14-00-614-002-A-01 | Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU) |
| TASK 49-00-00-860-005-A | APU Start by External Power |
| TASK 49-00-00-860-005-A-01 | APU Start by Batteries |
| TASK 49-00-00-860-006-A | APU Shutdown by External Power |
| TASK 49-00-00-860-006-A-01 | APU Shutdown by Batteries |
| TASK 52-41-00-010-001-A | Open the APU Doors for Access |
| TASK 52-41-00-410-001-A | Close the APU Doors after Access |
Subtask 49-00-00-860-103-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) On the panel 25VU, make sure that the APU MASTER SW pushbutton switch is off.
(3) Put a warning notice in the cockpit to tell persons not to start the APU.
(4) Make sure that the hydraulic systems are depressurized
(Ref. AMM TASK 29-14-00-614-001).
Subtask 49-00-00-865-111-A ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) On the panel 25VU, make sure that the APU MASTER SW pushbutton switch is off.
(3) Put a warning notice in the cockpit to tell persons not to start the APU.
(4) Make sure that the hydraulic systems are depressurized
(Ref. AMM TASK 29-14-00-614-001).
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 49-00-00-010-069-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | APU/APU/CTL | 2KD | L42 |
| 121VU | APU/ECB/SPLY | 1KD | L41 |
C. Get Access
(1) Put the access platform in position below the APU access doors 315AL and 316AR.
(2) Open the APU access doors 315AL and 316AR (Ref. AMM TASK 52-41-00-010-001).
(3) Set the LIGHT control switch 11LJ to the on position.
4. Procedure(1) Put the access platform in position below the APU access doors 315AL and 316AR.
(2) Open the APU access doors 315AL and 316AR (Ref. AMM TASK 52-41-00-010-001).
(3) Set the LIGHT control switch 11LJ to the on position.
Subtask 49-00-00-480-055-A ** ON A/C NOT FOR ALL
A. Preparation for the Leak Test
(1) There are two possible procedures to find the location of a pneumatic joint air leak. You can apply dry developer (Material No.CP3010) or Cleaner-Hydraulic Spillage Absorbent powder - (Material No.08CKB9) around the pneumatic joints or you can install foil, aluminium around the pneumatic joint location. Use the steps that follow to apply foil, aluminium to the pneumatic joint locations:
(a) Wind the foil wrap around the joint one time.
(b) Twist the seam of the foil wrap tight as shown.
(c) Make the foil wrap as tight as possible on the tube but do not rip the wrap.
(d) Attach the foil wrap with14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - at both sides of the pneumatic joint.
Subtask 49-00-00-410-073-A ** ON A/C NOT FOR ALL (1) There are two possible procedures to find the location of a pneumatic joint air leak. You can apply dry developer (Material No.CP3010) or Cleaner-Hydraulic Spillage Absorbent powder - (Material No.08CKB9) around the pneumatic joints or you can install foil, aluminium around the pneumatic joint location. Use the steps that follow to apply foil, aluminium to the pneumatic joint locations:
(a) Wind the foil wrap around the joint one time.
(b) Twist the seam of the foil wrap tight as shown.
(c) Make the foil wrap as tight as possible on the tube but do not rip the wrap.
(d) Attach the foil wrap with
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Set the LIGHT control switch 11LJ to the off position.
(3) Close the APU access doors 316AR 315AL (Ref. AMM TASK 52-41-00-410-001).
(4) Remove the access platform(s).
(5) Remove the WARNING NOTICE(S).
Subtask 49-00-00-865-112-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Set the LIGHT control switch 11LJ to the off position.
(3) Close the APU access doors 316AR 315AL (Ref. AMM TASK 52-41-00-410-001).
(4) Remove the access platform(s).
(5) Remove the WARNING NOTICE(S).
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 49-00-00-790-054-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | APU/APU/CTL | 2KD | L42 |
| 121VU | APU/ECB/SPLY | 1KD | L41 |
D. Air leak test
(1) Start the APU (Ref. AMM TASK 49-00-00-860-005).
(2) During APU operation:
(4) Put a warning notice in the cockpit to tell persons not to start the APU.
Subtask 49-00-00-865-113-A ** ON A/C NOT FOR ALL (1) Start the APU (Ref. AMM TASK 49-00-00-860-005).
(2) During APU operation:
- supply bleed air.
(4) Put a warning notice in the cockpit to tell persons not to start the APU.
E. Open, safety and tag this(these) circuit breaker(s):
Subtask 49-00-00-010-070-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | APU/APU/CTL | 2KD | L42 |
| 121VU | APU/ECB/SPLY | 1KD | L41 |
F. Get Access
(1) Put the access platform in position below the APU access doors 315AL and 316AR.
(2) Open the APU access doors 315AL and 316AR (Ref. AMM TASK 52-41-00-010-001).
(3) Set the LIGHT control switch 11LJ to the on position.
Subtask 49-00-00-080-055-A ** ON A/C NOT FOR ALL (1) Put the access platform in position below the APU access doors 315AL and 316AR.
(2) Open the APU access doors 315AL and 316AR (Ref. AMM TASK 52-41-00-010-001).
(3) Set the LIGHT control switch 11LJ to the on position.
G. Make sure that there no leaks at the joint location, and remove the materials used to check leaks.
5. Close-upSubtask 49-00-00-410-074-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Set the LIGHT control switch 11LJ to the off position.
(3) Close the APU access doors 316AR 315AL (Ref. AMM TASK 52-41-00-410-001).
(4) Remove the access platform(s).
(5) Remove the WARNING NOTICE(S).
Subtask 49-00-00-865-114-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Set the LIGHT control switch 11LJ to the off position.
(3) Close the APU access doors 316AR 315AL (Ref. AMM TASK 52-41-00-410-001).
(4) Remove the access platform(s).
(5) Remove the WARNING NOTICE(S).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 49-00-00-860-104-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | APU/APU/CTL | 2KD | L42 |
| 121VU | APU/ECB/SPLY | 1KD | L41 |
C. Aircraft Maintenance Configuration
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Pressurize the aircraft hydraulic systems
(Ref. AMM TASK 29-14-00-614-002).
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Pressurize the aircraft hydraulic systems
(Ref. AMM TASK 29-14-00-614-002).
Foil Wrap Installation at Pneumatic System Joints