Installation of the Pylon Bleed-Air Ducts
TASK 36-11-49-400-013-A
Installation of the Pylon Bleed-Air Ducts
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Expendable Parts
D. Referenced Information
3. Job Set-up
Subtask 36-11-49-860-058-A ** ON A/C NOT FOR ALL
Subtask 36-11-49-420-057-B ** ON A/C NOT FOR ALL
Subtask 36-11-49-865-073-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:11:05 UTC
Installation of the Pylon Bleed-Air Ducts
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
1. Reason for the Job- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 413DT, 423DT, 471AL, 471AR, 481AL, 481AR |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 4 | SEALS | AIPC 36-11-06-01-140 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-26-00-910-002-A | Installation of Expansion Joints |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 36-11-42-000-001-A | Removal of the Bleed-Air Precooler Exchanger |
| TASK 36-11-42-400-001-A | Installation of the Bleed-Air Precooler Exchanger |
| TASK 36-11-43-000-001-A | Removal of the Fan-Air Valve Control-Thermostat |
| TASK 36-11-43-400-001-A | Installation of the Fan-Air Valve Control-Thermostat |
| TASK 36-11-55-000-001-A | Removal of the Bleed-Pressure-Regulator Valve Control-Solenoid |
| TASK 36-11-55-400-001-A | Installation of the Bleed-Pressure-Regulator Valve Control-Solenoid |
| TASK 36-12-00-860-001-A | Pressurization of the Bleed System with the APU |
| TASK 36-12-00-860-002-A | Pressurization of the Bleed System through the HP Ground Connector |
| TASK 49-00-00-860-009-A | APU Shutdown by External Power (131-9(A)) |
| TASK 49-00-00-860-009-A-01 | APU Shutdown by Batteries (131-9(A)) |
Subtask 36-11-49-860-058-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that engine 1(2) shutdown occurred for a minimum of 5 minutes before you do this procedure.
(3) On AIR COND panel 30VU:
Subtask 36-11-49-010-200-B ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that engine 1(2) shutdown occurred for a minimum of 5 minutes before you do this procedure.
(3) On AIR COND panel 30VU:
- Make sure that the ENG 1(2) BLEED pushbutton switch is released (the OFF legend is on),
- Make sure that the APU BLEED pushbutton switch is released (the ON legend is off),
- Make sure that the WARNING NOTICE(S) to tell persons not to operate the pneumatic system is in position.
- Make sure that the WARNING NOTICE(S) to tell persons not to start engine 1(2) is in position.
- Make sure that the WARNING NOTICE(S) to tell persons not to pressurize the pneumatic system is in position.
- Make sure that the ON legend of the ENG/FADEC GND PWR 1(2) pushbutton switch is off,
- Make sure that the WARNING NOTICE(S) to tell persons not to energize FADEC 1(2) is in position.
B. Get Access
(1) Make sure that the fan-air valve-control thermostat (Ref. AMM TASK 36-11-43-000-001) is removed.
(2) Make sure that the bleed pressure-regulator valve control-solenoid (Ref. AMM TASK 36-11-55-000-001) is removed.
(3) Make sure that the bleed-air precooler exchanger (Ref. AMM TASK 36-11-42-000-001) is removed.
(4) Make sure that these access panels are removed:
(a) For the left pylon:
(b) For the right pylon:
Subtask 36-11-49-865-072-A ** ON A/C NOT FOR ALL (1) Make sure that the fan-air valve-control thermostat (Ref. AMM TASK 36-11-43-000-001) is removed.
(2) Make sure that the bleed pressure-regulator valve control-solenoid (Ref. AMM TASK 36-11-55-000-001) is removed.
(3) Make sure that the bleed-air precooler exchanger (Ref. AMM TASK 36-11-42-000-001) is removed.
(4) Make sure that these access panels are removed:
(a) For the left pylon:
(b) For the right pylon:
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 1/CTL | 3HA1 | D12 |
| 49VU | AIR BLEED/ENG 1/MONG | 2HA1 | D11 |
| 122VU | AIR BLEED/ENG 2/CTL | 3HA2 | Z23 |
| 122VU | AIR BLEED/ENG 2/MONG | 2HA2 | Z22 |
Subtask 36-11-49-420-057-B ** ON A/C NOT FOR ALL
A. Installation of the Wing Connection Sleeve
(1) If you use the APU to energize the electrical circuits, stop the APU:
(a) Make sure that the pressure and the temperature of the bleed-air duct system are in ambient conditions.
(4) Install a new AIPC 36-11-06-01-140 SEALS (4) in the first expansion joint (6) (Ref. AMM TASK 20-26-00-910-002).
(5) Install a new AIPC 36-11-06-01-140 SEALS (4) in the other expansion joint (6) (Ref. AMM TASK 20-26-00-910-002).
(6) Install the wing connection sleeve (3).
Subtask 36-11-49-420-071-C ** ON A/C NOT FOR ALL (1) If you use the APU to energize the electrical circuits, stop the APU:
- For GTCP 36-300 APU (Ref. AMM D/O 49-00-00-86)
- For APS 3200 APU (Ref. AMM D/O 49-00-00-86)
- For 131-9(A) APU (Ref. AMM TASK 49-00-00-860-009).
(a) Make sure that the pressure and the temperature of the bleed-air duct system are in ambient conditions.
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE UNIT UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
(3) Remove the blanking plugs from the disconnected line ends. (4) Install a new AIPC 36-11-06-01-140 SEALS (4) in the first expansion joint (6) (Ref. AMM TASK 20-26-00-910-002).
(5) Install a new AIPC 36-11-06-01-140 SEALS (4) in the other expansion joint (6) (Ref. AMM TASK 20-26-00-910-002).
(6) Install the wing connection sleeve (3).
B. Installation of the Pylon Bleed-Air Ducts (Ref. AMM TASK 20-26-00-910-002)
(1) Install the clamp (2) but do not tighten it at this time.
(2) Install the expansion joint (6) on the wing connection sleeve (3).
(3) Install the clamp (7) on the expansion joint (6).
(4) Install the other expansion joint (6). Do not tighten the clamp (7).
(5) Install the aft pipe of the exchanger (11).
(6) Install the bolts (8), the washers (9) and the nuts (10) and tighten the nuts.
(7) Install the tab (13) and the nut (12) on the clamp (7) and tighten the nut.
(8) Tighten the clamps (7) and (2).
Subtask 36-11-49-820-050-A ** ON A/C NOT FOR ALL (1) Install the clamp (2) but do not tighten it at this time.
(2) Install the expansion joint (6) on the wing connection sleeve (3).
(3) Install the clamp (7) on the expansion joint (6).
(4) Install the other expansion joint (6). Do not tighten the clamp (7).
(5) Install the aft pipe of the exchanger (11).
(6) Install the bolts (8), the washers (9) and the nuts (10) and tighten the nuts.
(7) Install the tab (13) and the nut (12) on the clamp (7) and tighten the nut.
(8) Tighten the clamps (7) and (2).
C. Make sure that the expansion joints (6) are in the correct position in relation to the wing connection sleeve (3) and the pipe (11).
Subtask 36-11-49-720-062-A ** ON A/C NOT FOR ALL D. Do this test:
(1) Pressurize the bleed system through the HP ground connector (Ref. AMM TASK 36-12-00-860-002) or with the APU (Ref. AMM TASK 36-12-00-860-001).
(2) 0n the panel 30VU, put the X-BLEED selector switch in the OPEN position.
(3) If you pressurize the bleed system through the HP ground connector, the supplied pressure 30 psi (2.07 bar) must be stable.
(4) Make sure that there are no leaks at the junctions of the installed duct.
5. Close-up(1) Pressurize the bleed system through the HP ground connector (Ref. AMM TASK 36-12-00-860-002) or with the APU (Ref. AMM TASK 36-12-00-860-001).
(2) 0n the panel 30VU, put the X-BLEED selector switch in the OPEN position.
(3) If you pressurize the bleed system through the HP ground connector, the supplied pressure 30 psi (2.07 bar) must be stable.
(4) Make sure that there are no leaks at the junctions of the installed duct.
Subtask 36-11-49-865-073-A ** ON A/C NOT FOR ALL
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 36-11-49-410-062-B ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 1/CTL | 3HA1 | D12 |
| 49VU | AIR BLEED/ENG 1/MONG | 2HA1 | D11 |
| 122VU | AIR BLEED/ENG 2/CTL | 3HA2 | Z23 |
| 122VU | AIR BLEED/ENG 2/MONG | 2HA2 | Z22 |
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the fan-air valve-control thermostat (Ref. AMM TASK 36-11-43-400-001).
(3) Install the bleed-pressure-regulated valve-control solenoid (Ref. AMM TASK 36-11-55-400-001).
(4) Install the bleed-air precooler exchanger (Ref. AMM TASK 36-11-42-400-001).
(5) Install these access panels:
(a) For the left pylon:
(b) For the right pylon:
Subtask 36-11-49-942-060-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the fan-air valve-control thermostat (Ref. AMM TASK 36-11-43-400-001).
(3) Install the bleed-pressure-regulated valve-control solenoid (Ref. AMM TASK 36-11-55-400-001).
(4) Install the bleed-air precooler exchanger (Ref. AMM TASK 36-11-42-400-001).
(5) Install these access panels:
(a) For the left pylon:
(b) For the right pylon:
C. Close Access
(1) Remove the access platform(s).
(2) Remove the WARNING NOTICE(S).
Subtask 36-11-49-862-070-A ** ON A/C NOT FOR ALL (1) Remove the access platform(s).
(2) Remove the WARNING NOTICE(S).
D. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002) or (Ref. AMM TASK 24-41-00-862-002).
(Ref. AMM TASK 24-41-00-862-002) or (Ref. AMM TASK 24-41-00-862-002).
Pylon Bleed Air Ducts