Operational Test of the System Pressure Switch , Pressure Transducer and the associated Indicating System of the Green Hydraulic System
TASK 29-32-00-710-001-A
Operational Test of the System Pressure Switch , Pressure Transducer and the associated Indicating System of the Green Hydraulic System
Self explanatory
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 29-32-00-865-050-A
Subtask 29-32-00-710-050-A
Subtask 29-32-00-860-051-A
[Rev.10 from 2021]
2026.04.01 08:13:41 UTC
Operational Test of the System Pressure Switch , Pressure Transducer and the associated Indicating System of the Green Hydraulic System
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-12-29-611-001-A | Fill the Hydraulic Fluid Reservoir with a Hand Pump |
| TASK 12-12-29-611-002-A | Fill the Hydraulic Fluid Reservoir with a Hydraulic Service Cart |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-10-00-863-001-A | Pressurize the Green Hydraulic System with a Hydraulic Ground Power-Cart |
| TASK 29-10-00-864-001-A | Depressurize the Green Hydraulic System |
| TASK 29-14-00-614-002-A | Pressurization of the Hydraulic Reservoirs through the Ground Connector |
| TASK 29-14-00-614-002-A-01 | Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU) |
| TASK 29-23-00-860-001-A | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 29-23-00-860-002-A | Connection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 29-23-00-863-001-A | Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump |
| TASK 29-23-00-864-001-A | Depressurize the Green and Yellow Hydraulic Systems after Operation of the PTU |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 29-32-00-865-050-A
A. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 29-32-00-860-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | HYD/HYD/PRESS/XMTR | 1841GN | C11 |
| 121VU | HYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST | 1881GP | N35 |
B. Aircraft Maintenance Configuration
(3) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(4) On the overhead panel 50VU, make sure that the HYD /LEAK MEASUREMENT VALVES/G pushbutton switch (P/BSW) is set to on (OFF light is not on).
(5) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(6) On the ECAM control panel on the center pedestal, press the HYD pushbutton. Make sure that the ECAM lower display unit (DU) shows the HYD page.
(7) Make sure that the ECAM shows none of these conditions:
(10) If necessary, add fluid to the reservoir(s) (Ref. AMM TASK 12-12-29-611-001) or (Ref. AMM TASK 12-12-29-611-002).
4. ProcedureWARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002). NOTE: This procedure pressurizes the Yellow hydraulic system together with the Green hydraulic system. If you do not want to pressurize the Yellow hydraulic system, you must disconnect the PTU isolation coupling.
(2) If required, disconnect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-001). (3) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(4) On the overhead panel 50VU, make sure that the HYD /LEAK MEASUREMENT VALVES/G pushbutton switch (P/BSW) is set to on (OFF light is not on).
(5) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(6) On the ECAM control panel on the center pedestal, press the HYD pushbutton. Make sure that the ECAM lower display unit (DU) shows the HYD page.
(7) Make sure that the ECAM shows none of these conditions:
- Green reservoir low air pressure,
- Green reservoir low fluid contents.
- low air pressure in the reservoir of the Yellow hydraulic system,
- low fluid contents in the reservoir of the Yellow hydraulic system.
(10) If necessary, add fluid to the reservoir(s) (Ref. AMM TASK 12-12-29-611-001) or (Ref. AMM TASK 12-12-29-611-002).
Subtask 29-32-00-710-050-A
A. Do this test:
5. Close-up| ACTION | RESULT |
|---|---|
| 1.Pressurize the Green hydraulic system from a ground supply or through the PTU (Ref. AMM TASK 29-10-00-863-001) or (Ref. AMM TASK 29-23-00-863-001). | On the ECAM lower DU:
|
2.On the overhead panel 50VU:
| On the overhead panel 50VU:
|
| 3.Depressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-864-001) or (Ref. AMM TASK 29-23-00-864-001). | On the ECAM lower DU:
|
Subtask 29-32-00-860-051-A
A. Put the aircraft back to the serviceable condition.
(1) On the overhead panel 50VU, lift the guard and set the HYD /LEAK MEASUREMENT VALVES/G P/BSW to on. Make sure that the OFF light goes out.
(3) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
(1) On the overhead panel 50VU, lift the guard and set the HYD /LEAK MEASUREMENT VALVES/G P/BSW to on. Make sure that the OFF light goes out.
NOTE: When you set the P/BSW to on, the ECAM lower DU can change to the ELEC page. Also the single chime audio warning and the MASTER CAUT light operate. You can ignore these indications. Cancel the MASTER CAUT light and set the HYD page on the ECAM lower DU to find the hydraulic indications.
(2) If the PTU is isolated, connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002). (3) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).