Hydraulic Maintenance Procedure after an Engine Installation (with Engine Pump Installed) or after an Engine Pump Installation
TASK 29-11-51-860-040-A
Hydraulic Maintenance Procedure after an Engine Installation (with Engine Pump Installed) or after an Engine Pump Installation
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 29-11-51-869-053-A
Subtask 29-11-51-870-054-A ** ON A/C NOT FOR ALL
Subtask 29-11-51-860-059-A
[Rev.10 from 2021]
2026.04.01 04:45:06 UTC
Hydraulic Maintenance Procedure after an Engine Installation (with Engine Pump Installed) or after an Engine Pump Installation
WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
WARNING:
DO NOT TOUCH THE HYDRAULIC SYSTEM COMPONENTS FOR A SHORT TIME AFTER THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS STAY HOT FOR SOME TIME AND CAN CAUSE INJURY.
CAUTION:
DO NOT LET HYDRAULIC FLUID FALL ON THE ENGINE. UNWANTED HYDRAULIC FLUID MUST BE REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH. THE FLUID CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME PARTS.
ZONE: 435
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 435 | FAN AND ACCESSORY GEARBOX |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-12-29-611-001-A | Fill the Hydraulic Fluid Reservoir with a Hand Pump |
| TASK 29-00-00-210-001-A | Check for Air in the Green/Blue/Yellow Hydraulic System |
| TASK 29-11-00-710-001-A | Operational Test of the Green Hydraulic System |
| TASK 29-11-43-200-802-A | Visual Check of the Engine-Pump Case-Drain Filter Contamination (Pop-Out) Indicator |
| TASK 29-14-00-614-002-A | Pressurization of the Hydraulic Reservoirs through the Ground Connector |
| TASK 29-14-00-614-002-A-01 | Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU) |
| TASK 29-30-00-200-002-A | Check of the Reservoir Quantity Indication on the ECAM Display Unit |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 78-31-00-710-040-A | Operational Test of the Thrust Reverser System |
| TASK 78-31-00-710-040-A-01 | Operational Test of the Thrust Reverser without CFDS - Engine not Running |
| TASK 78-31-00-710-040-A-02 | Operational Test of the Thrust Reverser without CFDS - Engine Running |
| TASK 78-31-00-710-041-A | Operational Test of the Thrust Reverser System with the CFDS |
| TASK 78-31-00-710-041-A-02 | Operational test of the Thrust Reverser without the CFDS and Engine Running |
| TASK 78-31-00-710-042-A | Operational Test of the Thrust Reverser System |
| TASK 78-31-00-710-805-A | Operational Test of Thrust Reverser with MCDU |
| TASK 78-31-00-710-805-A-01 | Thrust Reverser Cycling Test (Engine Running) |
Subtask 29-11-51-869-053-A
A. You must do this procedure:
4. Procedure- To bleed the hydraulic system and to make sure that it operates correctly after an engine installation (engine pump installed).
- To bleed the hydraulic system and to make sure that it operates correctly after an engine pump installation.
Subtask 29-11-51-870-054-A ** ON A/C NOT FOR ALL
A. Bleeding
(1) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(2) On the ECAM control panel, push the HYD key:
(6) Pressurize the related hydraulic reservoir (Ref. AMM TASK 29-14-00-614-002).
(7) Lift the guard and push the ENG1/FIRE and ENG2/FIRE pushbutton switches (the fire shut-off valves open).
(8) Let the hydraulic fluid flow out from the hose into the CONTAINER 10 L(2 1/2 USGAL) until there is no air in it.
(9) When the bleeding is completed, push and release the ENG1/FIRE and ENG2/FIRE pushbutton switches (the fire shut-off valves close).
(10) If necessary, do steps 4.A.(3), 4.A.(4) and 4.A.(6) again or continuously pressurize the related reservoir.
(11) Connect the hose to the filter and tighten it.
(12) TORQUE the hose of the filter to between 280 and 215 lbf.in (3.16 and 2.43 m.daN )
.
(13) Push the ENG1/FIRE and ENG2/FIRE pushbutton switches (the fire shut-off valves open).
Subtask 29-11-51-870-054-B ** ON A/C NOT FOR ALL (1) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(2) On the ECAM control panel, push the HYD key:
- On the SD, the HYD page comes into view.
- Lift the guard and release the ENG1/FIRE and ENG2/FIRE pushbutton switches.
- Make sure that the fire shut-off valves are closed.
(6) Pressurize the related hydraulic reservoir (Ref. AMM TASK 29-14-00-614-002).
(7) Lift the guard and push the ENG1/FIRE and ENG2/FIRE pushbutton switches (the fire shut-off valves open).
(8) Let the hydraulic fluid flow out from the hose into the CONTAINER 10 L(2 1/2 USGAL) until there is no air in it.
(9) When the bleeding is completed, push and release the ENG1/FIRE and ENG2/FIRE pushbutton switches (the fire shut-off valves close).
(10) If necessary, do steps 4.A.(3), 4.A.(4) and 4.A.(6) again or continuously pressurize the related reservoir.
(11) Connect the hose to the filter and tighten it.
(12) TORQUE the hose of the filter to between 280 and 215 lbf.in (3.16 and 2.43 m.daN )
. (13) Push the ENG1/FIRE and ENG2/FIRE pushbutton switches (the fire shut-off valves open).
A. Bleeding
(1) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(2) On the ECAM control panel, push the HYD key:
(6) Pressurize the related hydraulic reservoir (Ref. AMM TASK 29-14-00-614-002).
(7) Lift the guard and push the ENG1/FIRE and ENG2/FIRE pushbutton switches (the fire shut-off valves open).
(8) Let the hydraulic fluid flow out from the hose into the CONTAINER 10 L(2 1/2 USGAL) until there is no air in it.
(9) When the bleeding is completed, push and release the ENG1/FIRE and ENG2/FIRE pushbutton switches (the fire shut-off valves close).
(10) If necessary, do steps 4.A.(3), 4.A.(4) and 4.A.(6) again or continuously pressurize the related reservoir.
(11) Connect the hose to the filter and tighten it.
(12) TORQUE the hose of the filter to between 20.35 and 17.84 lbf.ft (2.76 and 2.42 m.daN )
.
(13) Push the ENG1/FIRE and ENG2/FIRE pushbutton switches (the fire shut-off valves open).
Subtask 29-11-51-870-054-D ** ON A/C NOT FOR ALL (1) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(2) On the ECAM control panel, push the HYD key:
- On the SD, the HYD page comes into view.
- Lift the guard and release the ENG1/FIRE and ENG2/FIRE pushbutton switches.
- Make sure that the fire shut-off valves are closed.
(6) Pressurize the related hydraulic reservoir (Ref. AMM TASK 29-14-00-614-002).
(7) Lift the guard and push the ENG1/FIRE and ENG2/FIRE pushbutton switches (the fire shut-off valves open).
(8) Let the hydraulic fluid flow out from the hose into the CONTAINER 10 L(2 1/2 USGAL) until there is no air in it.
(9) When the bleeding is completed, push and release the ENG1/FIRE and ENG2/FIRE pushbutton switches (the fire shut-off valves close).
(10) If necessary, do steps 4.A.(3), 4.A.(4) and 4.A.(6) again or continuously pressurize the related reservoir.
(11) Connect the hose to the filter and tighten it.
(12) TORQUE the hose of the filter to between 20.35 and 17.84 lbf.ft (2.76 and 2.42 m.daN )
. (13) Push the ENG1/FIRE and ENG2/FIRE pushbutton switches (the fire shut-off valves open).
A. Bleeding
(1) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(2) On the ECAM control panel, push the HYD key:
(6) Disconnect the tube (4) from the case drain filter (1) and put the open end in a clean CONTAINER 10 L(2 1/2 USGAL).
(7) Pressurize the related hydraulic reservoir (Ref. AMM TASK 29-14-00-614-002).
(8) Lift the guard and push the ENG1/FIRE and ENG2/FIRE pushbutton switches (the fire shut-off valves open).
(9) Let the hydraulic fluid flow out from the tube (4) into the CONTAINER 10 L(2 1/2 USGAL) until there is no air in it.
(10) When the bleeding is completed, push and release the ENG1/FIRE and ENG2/FIRE pushbutton switches (the fire shut-off valves close).
(11) If necessary, do steps 4.A.(3), 4.A.(4) and 4.A.(7) again or continuously pressurize the related reservoir.
(12) Install the clamp (2) and the screw (3).
(13) TORQUE the screw (3) to between 0.39 and 0.34 m.daN (34.51 and 30.09 lbf.in )
.
(14) Connect the tube (4) to the case drain filter (1).
(15) While you hold the adapter with a wrench, TORQUE the coupling nut of the tube (4) to between 1.86 and 1.75 m.daN (13.72 and 12.91 lbf.ft )
.
(16) Push the ENG1/FIRE and ENG2/FIRE pushbutton switches (the fire shut-off valves open).
Subtask 29-11-51-710-060-A ** ON A/C NOT FOR ALL (1) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(2) On the ECAM control panel, push the HYD key:
- On the lower ECAM DU, the HYD page comes into view.
- Lift the guard and release the ENG1/FIRE and ENG2/FIRE pushbutton switches.
- Make sure that the fire shut-off valves are closed.
(6) Disconnect the tube (4) from the case drain filter (1) and put the open end in a clean CONTAINER 10 L(2 1/2 USGAL).
(7) Pressurize the related hydraulic reservoir (Ref. AMM TASK 29-14-00-614-002).
(8) Lift the guard and push the ENG1/FIRE and ENG2/FIRE pushbutton switches (the fire shut-off valves open).
(9) Let the hydraulic fluid flow out from the tube (4) into the CONTAINER 10 L(2 1/2 USGAL) until there is no air in it.
(10) When the bleeding is completed, push and release the ENG1/FIRE and ENG2/FIRE pushbutton switches (the fire shut-off valves close).
(11) If necessary, do steps 4.A.(3), 4.A.(4) and 4.A.(7) again or continuously pressurize the related reservoir.
(12) Install the clamp (2) and the screw (3).
(13) TORQUE the screw (3) to between 0.39 and 0.34 m.daN (34.51 and 30.09 lbf.in )
. (14) Connect the tube (4) to the case drain filter (1).
(15) While you hold the adapter with a wrench, TORQUE the coupling nut of the tube (4) to between 1.86 and 1.75 m.daN (13.72 and 12.91 lbf.ft )
. (16) Push the ENG1/FIRE and ENG2/FIRE pushbutton switches (the fire shut-off valves open).
B. Tests
(1) Examine the hydraulic connections of the fire shut-off valve for leaks.
(a) Do an operational test of the thrust reverser system (Ref. AMM TASK 78-31-00-710-040).
(3) Operational Test
(a) Do an operational test of the Green hydraulic system (Ref. AMM TASK 29-11-00-710-001).
(d) Make sure that the clogging indicator of the Green HP filter is not extended.
(e) Make sure that the level of hydraulic fluid in the Green reservoir is correct. If necessary, fill the reservoir (Ref. AMM TASK 12-12-29-611-001).
(f) Do a check of the quantity of air in the Green hydraulic system (Ref. AMM TASK 29-00-00-210-001).
Subtask 29-11-51-710-060-B ** ON A/C NOT FOR ALL (1) Examine the hydraulic connections of the fire shut-off valve for leaks.
NOTE: Leaks are not permitted.
(2) Operational Test of the Thrust Reverser (a) Do an operational test of the thrust reverser system (Ref. AMM TASK 78-31-00-710-040).
(3) Operational Test
(a) Do an operational test of the Green hydraulic system (Ref. AMM TASK 29-11-00-710-001).
NOTE: Only make sure that the Green hydraulic pressure increases. It is not necessary to monitor the alarm thresholds of the low pressure switch of the Green engine pump.
(b) During the dry motoring, make sure that there are no leaks from: - The hydraulic connections of the pump
- The Green engine-pump case-drain filter
- The interface between the pump and the accessory gearbox.
(d) Make sure that the clogging indicator of the Green HP filter is not extended.
(e) Make sure that the level of hydraulic fluid in the Green reservoir is correct. If necessary, fill the reservoir (Ref. AMM TASK 12-12-29-611-001).
(f) Do a check of the quantity of air in the Green hydraulic system (Ref. AMM TASK 29-00-00-210-001).
B. Tests
(1) Examine the hydraulic connections of the fire shut-off valve for leaks.
(a) Do an operational test of the thrust reverser system (Ref. AMM TASK 78-31-00-710-041).
(3) Operational Test
(a) Do a check of the hydraulic fluid level in the reservoir (Ref. AMM TASK 29-30-00-200-002).
(b) Do an operational test of the Green hydraulic system (Ref. AMM TASK 29-11-00-710-001).
(e) Make sure that the clogging indicator of the Green HP filter is not extended.
(f) Make sure that the level of hydraulic fluid in the Green reservoir is correct. If necessary, fill the reservoir (Ref. AMM TASK 12-12-29-611-001).
(g) Do a check of the quantity of air in the Green hydraulic system (Ref. AMM TASK 29-00-00-210-001).
Subtask 29-11-51-710-060-C ** ON A/C NOT FOR ALL (1) Examine the hydraulic connections of the fire shut-off valve for leaks.
NOTE: Leaks are not permitted.
(2) Operational Test of the Thrust Reverser (a) Do an operational test of the thrust reverser system (Ref. AMM TASK 78-31-00-710-041).
(3) Operational Test
(a) Do a check of the hydraulic fluid level in the reservoir (Ref. AMM TASK 29-30-00-200-002).
(b) Do an operational test of the Green hydraulic system (Ref. AMM TASK 29-11-00-710-001).
NOTE: Only make sure that the Green hydraulic pressure increases. It is not necessary to monitor the alarm thresholds of the low pressure switch of the Green engine pump.
(c) During the dry motoring, make sure that there are no leaks from: - The hydraulic connection of the pump
- The Green engine pump case drain filter
- The interface between the pump and the accessory gearbox.
(e) Make sure that the clogging indicator of the Green HP filter is not extended.
(f) Make sure that the level of hydraulic fluid in the Green reservoir is correct. If necessary, fill the reservoir (Ref. AMM TASK 12-12-29-611-001).
(g) Do a check of the quantity of air in the Green hydraulic system (Ref. AMM TASK 29-00-00-210-001).
B. Tests
(1) Examine the hydraulic connections of the fire shut-off valve for leaks.
(3) Operational Test
(a) Do an operational test of the Green hydraulic system (Ref. AMM TASK 29-11-00-710-001).
(d) Make sure that the clogging indicator of the Green HP filter is not extended.
(e) Make sure that the level of hydraulic fluid in the Green reservoir is correct. If necessary, fill the reservoir (Ref. AMM TASK 12-12-29-611-001).
(f) Do a check of the quantity of the air in the Green hydraulic system (Ref. AMM TASK 29-00-00-210-001).
Subtask 29-11-51-710-060-F ** ON A/C NOT FOR ALL (1) Examine the hydraulic connections of the fire shut-off valve for leaks.
NOTE: Leaks are not permitted.
(2) Do an operational test of the thrust reverser system (Ref. AMM TASK 78-31-00-710-042). (3) Operational Test
(a) Do an operational test of the Green hydraulic system (Ref. AMM TASK 29-11-00-710-001).
NOTE: Only make sure that the Green hydraulic pressure increases. It is not necessary to monitor the alarm thresholds of the low pressure switch of the Green engine pump.
(b) During the dry motoring, make sure that there are no leaks from: - The hydraulic connection of the pump
- The Green engine pump case drain filter
- The interface between the pump and the accessory gearbox.
(d) Make sure that the clogging indicator of the Green HP filter is not extended.
(e) Make sure that the level of hydraulic fluid in the Green reservoir is correct. If necessary, fill the reservoir (Ref. AMM TASK 12-12-29-611-001).
(f) Do a check of the quantity of the air in the Green hydraulic system (Ref. AMM TASK 29-00-00-210-001).
B. Test
(1) Examine the hydraulic connections of the fire shut-off valve for leaks.
(a) If there are leaks, repair as applicable.
(2) Do an operational test of the thrust reverser system (Ref. AMM TASK 78-31-00-710-805).
(3) Operational test
(a) Do an operational test of the Green hydraulic system (Ref. AMM TASK 29-11-00-710-001).
(d) Make sure that the clogging indicator of the Green HP filter is not extended.
(e) Make sure that the level of the hydraulic fluid in the Green reservoir is correct. If necessary, fill the reservoir (Ref. AMM TASK 12-12-29-611-001).
(f) Do a check of the quantity of air in the Green hydraulic system (Ref. AMM TASK 29-00-00-210-001).
5. Close-up(1) Examine the hydraulic connections of the fire shut-off valve for leaks.
(a) If there are leaks, repair as applicable.
(2) Do an operational test of the thrust reverser system (Ref. AMM TASK 78-31-00-710-805).
(3) Operational test
(a) Do an operational test of the Green hydraulic system (Ref. AMM TASK 29-11-00-710-001).
NOTE: Only make sure that the Green hydraulic pressure increases. It is not necessary to monitor the alarm thresholds of the low pressure switch of the Green engine pump.
(b) After the dry-motoring, make sure that there were no leaks from: - The hydraulic connection of the pump
- The Green engine-pump case-drain-filter (1084GM)
- The interface between the pump and the accessory gearbox.
(d) Make sure that the clogging indicator of the Green HP filter is not extended.
(e) Make sure that the level of the hydraulic fluid in the Green reservoir is correct. If necessary, fill the reservoir (Ref. AMM TASK 12-12-29-611-001).
(f) Do a check of the quantity of air in the Green hydraulic system (Ref. AMM TASK 29-00-00-210-001).
Subtask 29-11-51-860-059-A
Case-Drain Filter of Engine Pump