W DOC AIRBUS | AMM A320F

Installation of the Self Sealing Half-Coupling of the Green Pump Suction (1700GM)


TASK 29-11-39-400-802-A
Installation of the Self Sealing Half-Coupling of the Green Pump Suction (1700GM)


WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
WARNING: DO NOT TOUCH THE HYDRAULIC SYSTEM COMPONENTS FOR A SHORT TIME AFTER THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS STAY HOT FOR SOME TIME AND CAN CAUSE INJURY.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION: DO NOT LET HYDRAULIC FLUID FALL ON THE ENGINE. UNWANTED HYDRAULIC FLUID MUST BE REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH. THE FLUID CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME PARTS.
ZONE: 210
ZONE: 400
FIN: 1700GM ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
1
CONTAINER 10 L(2 1/2 USGAL)
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 14.3 and 14.1 m.daN (105.46 and 103.98 lbf.ft ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.02ABA1)
Phosphate Ester Hydraulic Fluid-General Power - -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
400
POWER PLANT, NACELLES AND PYLONS
195BB, 197CB, 437AL
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
2
TEFLON RETAINER RING
AIPC 29-11-06-01-011
3
O-RING
AIPC 29-11-06-01-012
5
O-RING
AIPC 29-11-06-01-020
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 12-12-29-611-001-A
Fill the Hydraulic Fluid Reservoir with a Hand Pump
TASK 20-23-22-910-001-A
Marking of the Unions after Application of Standard or Specific Tightening Torque
TASK 20-29-00-911-002-A
Removal/Installation of an O-ring (Hydraulic Systems)
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 29-10-00-864-001-A
Depressurize the Green Hydraulic System
TASK 29-11-00-710-001-A
Operational Test of the Green Hydraulic System
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 31-60-00-860-001-A
EIS Start Procedure
TASK 31-60-00-860-002-A
EIS Stop Procedure
TASK 71-13-00-010-010-A
Opening of the Fan Cowls 437AL(447AL),438AR(448AR)
TASK 71-13-00-410-010-A
Closing of the Fan Cowls 437AL(447AL),438AR(448AR)
3. Job Set-up
Subtask 29-11-39-860-055-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
   (2) Make sure that the Green hydraulic system is depressurized (Ref. AMM TASK 29-10-00-864-001).
   (3) Make sure that the Green hydraulic reservoir is depressurized (Ref. AMM TASK 29-14-00-614-001).
   (4) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to pressurize the Green hydraulic system:
  • On the ground service panel of the Green hydraulic-system access-door 197CB.
   (5) Make sure that the WARNING NOTICE(S) is (are) in position on the hydraulic-reservoir pressurization access-door 195BB to tell persons not to pressurize the Green hydraulic reservoir.
   (6) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the engine 1.
   (7) Make sure that the left fan-cowl door 437AL is open (Ref. AMM TASK 71-13-00-010-010).
Subtask 29-11-39-941-053-A ** ON A/C NOT FOR ALL
B. Safety Precautions
   (1) On the center pedestal, on the ENG panel 115VU:
  • Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to start the engine.
   (2) Make sure that the engine 1(2) shutdown occurred not less than five minutes before you do this procedure.
   (3) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to pressurize the Green hydraulic system:
  • In the cockpit, on the HYD section of the HYD/FUEL panel 40VU.
   (4) On the maintenance panel 50VU:
  • Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
  • Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to energize the FADEC 1(2).
   (5) Make sure that a CONTAINER 10 L(2 1/2 USGAL) is below the connection of the pressure hose (1) and the fluid disconnect panel (6) to collect the fluid.
4. Procedure
Subtask 29-11-39-420-052-A ** ON A/C NOT FOR ALL
A. Installation of the Self Sealing Half-Coupling of the Green Pump Suction
CAUTION: USE TWO WRENCHES TO REMOVE OR INSTALL THE TUBE COUPLING NUTS:
  • ONE WRENCH TO HOLD THE UNION, AND
  • ONE TO LOOSEN OR TIGHTEN THE COUPLING NUT.
THIS PREVENTS DAMAGE TO THE PARTS.
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Make sure that the hydraulic line end-fittings are serviceable.
   (4) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the new AIPC 29-11-06-01-012 O-RING (3) and AIPC 29-11-06-01-020 O-RING (5).
   (5) Install the O-ring (5) on the self sealing half-coupling (4) (
Ref. AMM TASK 20-29-00-911-002).
   (6) Remove the PLUG - BLANKING from the fluid disconnect panel (6).
   (7) Install the self sealing half-coupling (4) on the fluid disconnect panel (6).
   (8) TORQUE the self sealing half-coupling (4) to between 14.3 and 14.1 m.daN (105.46 and 103.98 lbf.ft ) T.
   (9) Install the O-ring (3) and the new
AIPC 29-11-06-01-011 TEFLON RETAINER RING (2) on the self sealing half-coupling (4).
   (10) Remove the PLUG - BLANKING from the disconnected hose half-coupling (1).
   (11) Connect the hose half-coupling (1) to the self sealing half-coupling (4).
   (12) Turn the sleeve of the hose half-coupling (1) until the teeth fully engage and you cannot turn the sleeve more.
   (13) Identify the tightened union nuts with a red line
(
Ref. AMM TASK 20-23-22-910-001).
Subtask 29-11-39-710-052-A ** ON A/C NOT FOR ALL
B. Test
   (1) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only) (Ref. AMM TASK 31-60-00-860-001).
   (2) On the ECAM control panel, push the HYD key (on the lower ECAM DU, the HYD page comes into view).
   (3) On the HYD page, make sure that the Green hydraulic pressure is 3000 -200 psi or +200 psi (206.84 -13.79 bar or +13.79 bar).
   (4) Do an operational test of the Green hydraulic system (Ref. AMM TASK 29-11-00-710-001).
   (5) During the dry motoring, make sure that there are no leaks from the self sealing half-coupling (4).
   (6) Make sure that the level of the hydraulic fluid in the Green reservoir is correct. If necessary, fill the reservoir (Ref. AMM TASK 12-12-29-611-001).
5. Close-up
Subtask 29-11-39-942-052-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Remove the access platform(s).
   (2) Remove the CONTAINER 10 L(2 1/2 USGAL).
   (3) Make sure that the work area is clean and clear of tools and other items.
   (4) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
   (5) De-energize the aircraft electrical circuits
Subtask 29-11-39-410-052-A ** ON A/C NOT FOR ALL
B. Close Access
   (1) Close the left fan-cowl door 437AL (Ref. AMM TASK 71-13-00-410-010).
[Rev.10 from 2021] 2026.04.01 00:15:37 UTC