W DOC AIRBUS | AMM A320F

Check of the Internal Leakage of the Green Hydraulic System


TASK 29-00-00-280-001-A
Check of the Internal Leakage of the Green Hydraulic System


WARNING: MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
1. Reason for the Job
To make sure that the internal leakage of the system and parts of the system are in limits.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
FLOWMETER 20.00 L.MN (5.2833 US GAL.MN)
No specific
1
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
610007AB
1
TOOL-MEASURE,HYDRAULIC FLOW
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
197CB
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 29-10-00-863-001-A
Pressurize the Green Hydraulic System with a Hydraulic Ground Power-Cart
TASK 29-10-00-863-001-A
Pressurize the Green Hydraulic System with a Hydraulic Ground Power-Cart
TASK 29-10-00-864-001-A
Depressurize the Green Hydraulic System
TASK 29-23-00-860-001-A
Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 29-23-00-860-002-A
Connection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 29-23-00-863-001-A
Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump
TASK 29-23-00-864-001-A
Depressurize the Green and Yellow Hydraulic Systems after Operation of the PTU
TASK 31-60-00-860-001-A
EIS Start Procedure
TASK 31-60-00-860-002-A
EIS Stop Procedure
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
TASK 32-12-00-410-001-A
Close the Main Gear Doors after Access
TASK 32-31-00-710-005-A
Operational Check to Ensure Safety Valve Closes at 260 Knots
TASK 32-31-00-710-005-A-01
Operational Check to Ensure Safety Valve Closes at 260 Knots
TASK 32-31-00-710-005-A-02
Operational Check to Ensure Safety Valve Closes at 260 Knots
3. Job Set-up
Subtask 29-00-00-010-051-A ** ON A/C NOT FOR ALL
A. Get Access
   (1) Open the access door 197CB.
   (2) Open the right main door of the main gear (Ref. AMM TASK 32-12-00-010-001).
Subtask 29-00-00-010-051-B ** ON A/C NOT FOR ALL
A. Get Access
   (1) Open the right hand door of the main gear (Ref. AMM TASK 32-12-00-010-001).
   (2) If an ultrasonic flowmeter is not used in procedure that follows, open access door 197CB.
Subtask 29-00-00-865-050-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B11
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B08
49VUAUTO FLT/FAC1/28VDC5CC1B04
49VUAUTO FLT/FAC1/26VAC14CC1B03
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B06
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B03
49VUAUTO FLT/FAC1/28VDC5CC1H10
49VUAUTO FLT/FAC1/26VAC14CC1H09
** ON A/C ALL
105VUFLIGHT CONTROLS/ELAC2/STBY SPLY16CE2A02
105VUFLT CTL/ELAC1/STBY SPLY16CE1A01
105VUFLT CTL/SEC1/STBY SPLY22CEB01
121VUHYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST1881GPN35
121VUHYDRAULIC/SOL VALVES/G/Y/PTU1801GLN34
121VUFLIGHT CONTROLS/SEC3/SPLY21CE3Q19
121VUFLIGHT CONTROLS/SEC2/SPLY21CE2Q18
121VUFLIGHT CONTROLS/ELAC2/NORM/SPLY15CE2R20
Subtask 29-00-00-865-079-A
C. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUL/G/LGCIU/SYS1/NORM1GAC09
** ON A/C NOT FOR ALL
49VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKH12
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKR35
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR34
** ON A/C ALL
121VUHYDRAULIC/LGCIU/SYS22GAQ35
121VUHYDRAULIC/LGCIU/SYS1/GRND SPLY52GAQ34
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR33
Subtask 29-00-00-860-052-A ** ON A/C NOT FOR ALL
D. Aircraft Maintenance Configuration
   (1) Disconnect the connector 49GA-A from the safety valve 49GA to de-energize the safety valve 49GA (valve closed).
   (2) Install a PLUG - BLANKING on the disconnected electrical connector.
   (3) Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
1GA, 2GA, 52GA, 1701GK, 1702GK.
   (4) Connect a ground service cart with a FLOWMETER 20.00 L.MN (5.2833 US GAL.MN), calibrated to +/- 1.5% over full range to the ground test connections of the Green hydraulic system.
   (5) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
   (6) Set the ECAM system to ON (Ref. AMM TASK 31-60-00-860-001).
   (7) On the ECAM control panel on the center pedestal, push the F/CTL pushbutton (P/B). Make sure that the lower display unit (DU) shows the F/CTL page.
   (8) In the main gear compartment, disconnect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-001).
   (9) Pressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-863-001).
   (10) On the overhead panel 23VU, make sure that the ELAC 1, SEC 1 and FAC 1 pushbutton switches (P/BSW) are set to on (the OFF and FAULT lights not on).
   (11) On the overhead panel 24VU, make sure that the ELAC 2, SEC 2 and SEC 3 P/BSW are set to on (the OFF and FAULT lights not on).
   (12) On the overhead panel 40VU, set the PTU P/BSW to OFF (the OFF light comes on).
   (13) Operate the flight control surfaces:
WARNING: MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
     (a) Operate the sidestick and the rudder pedals to put the control surfaces associated with the Green hydraulic system to the 0 deg. position (spoilers retracted).
     (b) Keep all of the control surfaces stopped in the 0 deg. (retracted) position during the measurement of the internal leakage.
NOTE: Do the checks of the internal leakage with the hydraulic fluid at its usual working temperature of between 20 deg.C (68.00 deg.F) and 60 deg.C (140.00 deg.F).
Subtask 29-00-00-860-052-C ** ON A/C NOT FOR ALL
D. Aircraft Maintenance Configuration
   (1) Disconnect the connector 49GA-A from the safety valve 49GA to de-energize the safety valve 49GA (valve closed).
   (2) Install a PLUG - BLANKING on the disconnected electrical connector.
   (3) Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
1GA, 2GA, 52GA, 1701GK, 1702GK.
   (4) If an ultrasonic flowmeter is used in the procedure that follows:
     (a) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
     (b) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
     (c) On the ECAM control panel on the center pedestal, push the F/CTL Pushbutton (P/B). Make sure that the lower Display Unit (DU) shows the F/CTL page.
     (d) Pressurize the Green hydraulic system from the Yellow hydraulic system through the PTU with the Yellow electric pump (Ref. AMM TASK 29-23-00-863-001).
   (5) If an ultrasonic flowmeter is not used in the procedure that follows:
     (a) Connect a ground service cart with a FLOWMETER 20.00 L.MN (5.2833 US GAL.MN), calibrated to +/- 1.5% over full range to the ground test connections of the Green hydraulic system.
     (b) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
     (c) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
     (d) On the ECAM control panel on the center pedestal, push the F/CTL Pushbutton (P/B). Make sure that the lower Display Unit (DU) shows the F/CTL page.
     (e) In the main gear compartment, disconnect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-001).
     (f) Pressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-863-001).
   (6) On the overhead panel 23VU, make sure that the ELAC 1, SEC 1 and FAC 1 pushbutton switches (P/BSW) are set to on (the OFF and FAULT lights are off).
   (7) On the overhead panel 24VU, make sure that the ELAC 2, SEC 2 and SEC3 (P/BSW) are set to on (the OFF and FAULT lights are off).
   (8) On the overhead panel 40VU, set the PTU P/BSW to AUTO (the OFF and FAULT lights are off).
   (9) Operate the flight control surfaces.
WARNING: MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
     (a) Operate the sidestick and the rudder pedals to put the control surfaces in the 0 deg. position (spoilers retracted).
     (b) Keep all of the control surfaces stopped in the 0 deg. (retracted) position when you measure the internal leakage.
     (c) Do the checks of the internal leakage with the hydraulic fluid at its usual working temperature of between 20 deg.C (68.00 deg.F) and 60 deg.C (140.00 deg.F).
4. Procedure
Subtask 29-00-00-280-050-A ** ON A/C NOT FOR ALL
A. Check of the Internal Leakage of the Green Hydraulic System
   (1) Measurement of the Green system (complete) internal leakage:
     (a) On the overhead maintenance panel 50VU, make sure that the HYD/LEAK MEASUREMENT VALVES/G P/BSW is set to on (OFF light not on).
     (b) On the overhead panel 40VU, make sure that the PTU P/BSW is set to OFF (the OFF light is on).
     (c) Monitor the flow shown on the ground supply flowmeter. It must not be more than 9 l.min (2.3775 USgal.mn).
     (d) If the internal leakage is too much, do the checks of sections of the system to find the cause.
   (2) Measurement of the Green system (central section) internal leakage:
     (a) On the ECAM control panel on the center pedestal, push the HYD P/B. Make sure that the lower DU shows the HYD page.
     (b) On the overhead maintenance panel 50VU, lift the guard and set the HYD/LEAK MEASUREMENT VALVES/G P/BSW to off (OFF light comes on).
     (c) On the overhead panel 40VU, make sure that the PTU P/BSW is set to OFF (the OFF light is on).
     (d) Refer to the lower DU to make sure that the solenoid valve operation is correct (the color of the flow arrow and system name of the Green system is amber).
     (e) In the main gear compartment, make sure that the three valves on the leakage measurement selector-valve are set to OFF.
     (f) Monitor the flow shown on the ground supply flowmeter. It must not be more than 0.4 l.min (0.1057 USgal.mn).
   (3) Measurement of the Green system (rear section) internal leakage
     (a) On the overhead maintenance panel 50VU, make sure that the HYD/LEAK MEASUREMENT VALVES/G P/BSW is set to off (OFF light is on).
     (b) On the overhead panel 40VU, make sure that the PTU P/BSW is set to OFF (the OFF light is on).
     (c) In the main gear compartment turn the REAR manual selector valve to the ON position.
     (d) Monitor the flow shown on the ground supply flowmeter. It must not be more than 6.0 l.min (1.5850 USgal.mn).
     (e) In the main gear compartment, turn the REAR manual selector valve to the OFF position.
   (4) Measurement of the Green system (left wing section) internal leakage:
     (a) On the overhead maintenance panel 50VU, make sure that the HYD/LEAK MEASUREMENT VALVES/G P/BSW is set to off (OFF light is on).
     (b) On the overhead panel 40VU, make sure that the PTU P/BSW is set to OFF (the OFF light is on).
     (c) In the main gear compartment, turn the LH WING manual selector valve to the ON position.
     (d) Monitor the flow shown on the ground supply flowmeter. It must not be more than 3.7 l.min (0.9774 USgal.mn).
     (e) In the main gear compartment, turn the LH WING manual selector valve to the OFF position.
   (5) Measurement of the Green system (right wing section) internal leakage:
     (a) On the overhead maintenance panel 50VU, make sure that the HYD/LEAK MEASUREMENT VALVES/G P/BSW is set to off (OFF light on).
     (b) On the overhead panel 40VU, make sure that the PTU P/BSW is set to OFF (the OFF light is on).
     (c) In the main gear compartment, turn the RH WING manual selector valve to the ON position.
     (d) Monitor the flow shown on the ground supply flowmeter. It must not be more than 3.7 l.min (0.9774 USgal.mn).
     (e) In the main gear compartment, turn the RH WING manual selector valve to the OFF position.
   (6) Permitted leakage rates of the components:
     (a) The maximum permitted internal leakage for components related to the Green hydraulic system is:
Aileron servocontrol: 1.5 l.min (0.3963 USgal.mn)
Spoiler 5: 1.5 l.min (0.3963 USgal.mn)
THS actuator servovalve: 0.75 l.min (0.1981 USgal.mn)
Elevator servocontrol: 1.5 l.min (0.3963 USgal.mn)
Rudder servocontrol: 2.1 l.min (0.5548 USgal.mn)
Yaw damper actuator: 1.3 l.min (0.3434 USgal.mn)
Flap PCU valve block: 0.2 l.min (0.0528 USgal.mn)
Slat PCU valve block: 0.2 l.min (0.0528 USgal.mn)

NOTE: The maximum leakage rates for components are given only to assist in trouble shooting. The total leakage of components in a section (left wing, right wing etc) of the system must be less than the permitted maximum for that section. Also, the total leakages of the sections must not together be more than the leakage permitted for the complete system.
     (b) If the internal leakage rate is too high you can find the defective component if you:
       1 Listen to the pipes and components which may be the cause.
       2 Feel the pipes and components, a high leakage rate will cause an increase in their temperature.
CAUTION: DO NOT DISCONNECT AND CAP THE RETURN LINE FROM A SERVOCONTROL TO DO A LEAKAGE CHECK. IF A SUPPLY OF SYSTEM PRESSURE GETS TO THE SERVOCONTROL IT CAN CAUSE DAMAGE IF THERE IS NO RETURN FLOW.
     (c) If you think that a servocontrol is the cause, disconnect and cap the supply to the servocontrol. Do the test again and if the leakage rate is now in limits, the servocontrol is the defective component.
   (7) If the check is satisfactory, do the steps that follow:
     (a) Open, safety and tag this(these) circuit breaker(s):
1GA, 2GA, 52GA, 1701GK, 1702GK.
     (b) Remove the blanking plug from the electrical connector 49GA-A.
     (c) Connect the electrical connector 49GA-A to the safety valve 49GA.
Subtask 29-00-00-280-050-B ** ON A/C NOT FOR ALL
A. Check of the Internal Leakage of the Green Hydraulic System
NOTE: You can do this test with or without an ultrasonic flow meter. If the internal leakage is out of limits then the ultrasonic flow meter must be used to prevent an aircraft-on-ground (AOG) condition.
   (1) Measure the internal leakage of the Green hydraulic system (complete) without an ultrasonic flow meter:
     (a) On the overhead maintenance panel 50VU, make sure that the HYD/LEAK MEASUREMENT VALVES/G P/BSW is set to on (OFF light is not on).
     (b) On the overhead panel 40VU, make sure that the PTU P/BSW is set to OFF (the OFF light is on).
     (c) Monitor the flow shown on the ground supply flow meter. It must not be more than 9 l.min (2.3775 USgal.mn).
     (d) If the internal leakage is too much:
       1 Depressurize the Green hydraulic system
(Ref. AMM TASK 29-10-00-864-001).
       2 Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
       3 Disconnect the ground supply from the aircraft ground test connections.
       4 Install the blanking caps on the ground test connections.
       5 Pressurize the Green hydraulic system from Yellow hydraulic system through the PTU with the Yellow electric pump (Ref. AMM TASK 29-23-00-863-001).
       6 Do the leakage check of all sections of the Green hydraulic system to find the cause of high leakage.
   (2) Measure the internal leakage of the Green hydraulic system (central section) with an ultrasonic flow meter:

     (a) On the ECAM control panel on the center pedestal, push the HYD P/B. Make sure that the lower DU shows the HYD page.
     (b) On the overhead maintenance panel 50VU, lift the guard and set the HYD/LEAK MEASUREMENT VALVES/G P/BSW to OFF (the OFF light is on).
     (c) Refer to the lower DU of the ECAM (HYD page) to make sure that the solenoid valve operation is correct (the color of the flow arrow and system name of the Green hydraulic system is amber).
     (d) On the overhead panel 40VU, make sure that the PTU P/BSW is set to AUTO (the OFF and FAULT lights are off).
     (e) Refer to the ground instruction manual of the ultrasonic flow meter to make sure that the correct software is installed.
     (f) Clean the tube (1) between the identification tapes (2) with a Textile-Lint free Cotton - (Material No.14SBA1) .
     (g) Remove the remaining acoustic coupling compound from the leakage transducer (5) with a Textile-Lint free Cotton - (Material No.14SBA1) . Do not use a detergent to clean the leakage transducer (5).
     (h) Apply a thin layer of the acoustic coupling compound (part of USF FLUXUS GST 6108, 610007AB TOOL-MEASURE,HYDRAULIC FLOW) to the contact surfaces of the leakage transducer (5).
     (i) Install the leakage transducer (5) between the identification tapes (2) on the pipe (1):
       1 Hold the leakage transducer (5) and turn the knurled screw (6) counterclockwise to the stop.
       2 Put the leakage transducer (5) in position on the pipe (1) between the identification tapes (2). Then push it tightly on the pipe (1).
       3 Push the knurled screw (6) in. Then attach the fastening strap (4) around the pipe (1) with the thread element (3).
       4 Put the fastening strap (4) through the upper slot of the strap clamp (7) and then through the lower one.
       5 Make sure that the fastening strap (4) has the correct tension. And make sure that the knurled screw (6) is pushed in up to the stop.
       6 Tighten the knurled screw (6) to attach the leakage transducer (5) to the pipe (1).
     (j) Connect the leakage transducer cable (8) to the transmitter (9).
     (k) Refer to the ground instruction manual of the ultrasonic flow meter to set:
  • The serial number of the airplane
  • The input location code on the ultrasonic flow meter to numeric code: 64050536 (Green central section).
     (l) Obey the instructions of the ground instruction manual of the ultrasonic flow meter when you do these work steps.
     (m) Monitor the flow on the ultrasonic flow meter display. It must be not more than 2.0 l.min (0.50 USgal.mn)
     (n) If the internal leakage is more than 2.0 l.min (0.50 USgal.mn) do the steps that follow:
       1 Depressurize the Green and the Yellow hydraulic systems after operation of the PTU (Ref. AMM TASK 29-23-00-864-001).
       2 In the main gear compartment, disconnect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-001).
       3 Remove the blanking caps from the ground test connections.
       4 Connect a ground hydraulic power supply to the ground test connections of the Green hydraulic system.
       5 Pressurize the Green hydraulic system from the ground supply (Ref. AMM TASK 29-10-00-863-001).
       6 On the overhead panel 23VU, make sure that the ELAC1, SEC1 and FAC1 P/BSW are set to on (the OFF and FAULT lights are not on).
       7 On the overhead panel 24VU, make sure that the ELAC2, SEC2 and FAC2 P/BSW are set to on (the OFF and FAULT lights are not on).
       8 On the overhead panel 40VU set the PTU P/BSW to OFF (the OFF light comes on).
       9 Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
       10 Monitor the flow on the ultrasonic flow meter display.
       11 If the internal leakage is more than 2.0 l.min (0.50 USgal.mn) do the steps in Para A.(7) to find the cause of the high internal leakage.
       12 If the internal leakage is less than 2.0 l.min (0.50 USgal.mn) do the steps that follow:
         a Depressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-864-001).
         b Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
         c Disconnect the ground hydraulic supply from the aircraft ground test connections.
         d Install the blanking caps on the ground test connections.
         e On the overhead panel 40VU, set the PTU P/BSW to AUTO (the OFF and the Fault light are not on).
         f Pressurize the Green hydraulic system from the Yellow hydraulic system through the PTU with the Yellow electric pump (Ref. AMM TASK 29-23-00-863-001).
     (o) Remove the leakage transducer (5):
       1 Hold the leakage transducer (5) and turn the knurled screw (6) counterclockwise to disconnect the leakage transducer (5) from the pipe (1).
       2 Push the knurled screw (6) in and disconnect the fastening strap (4) from the strap clamp (7).
       3 Remove the leakage transducer (5) from the pipe (1).
     (p) Disconnect the leakage transducer cable (8) from the transmitter (9).
   (3) Measure the internal leakage of the Green hydraulic system with an ultrasonic flow meter (complete section):

     (a) On the overhead maintenance panel 50VU, make sure that the HYD/LEAK MEASUREMENT VALVES/G P/BSW is set to on (the OFF light is off).
     (b) Refer to the lower DU of the ECAM (HYD page) to make sure that the solenoid valve operation is correct (the flow arrow of the Green hydraulic system is green and the system name is white).
     (c) On the overhead panel 40VU, make sure that the PTU P/BSW is set to AUTO (the OFF and FAULT lights are off).
     (d) Refer to the ground instruction manual of the ultrasonic flow meter to make sure that the correct software is installed.
     (e) Clean the tube (1) between the identification tapes (2) with a Textile-Lint free Cotton - (Material No.14SBA1) .
     (f) Remove the remaining acoustic coupling compound from the leakage transducer (5) with a Textile-Lint free Cotton - (Material No.14SBA1) . Do not use a detergent to clean the leakage transducer (5).
     (g) Apply a thin layer of the acoustic coupling compound (part of USF FLUXUS GST 6108, 610007AB TOOL-MEASURE,HYDRAULIC FLOW) to the contact surfaces of the leakage transducer (5).
     (h) Install the leakage transducer (5) between the identification tapes (2) on the pipe (1):
       1 Hold the leakage transducer (5) and turn the knurled screw (6) counterclockwise to the stop.
       2 Put the leakage transducer (5) in position on the pipe (1) between the identification tapes (2). Then push it tightly on the pipe (1).
       3 Push the knurled screw (6) in. Then attach the fastening strap (4) around the pipe (1) with the thread element (3).
       4 Put the fastening strap (4) through the upper slot of the strap clamp (7) and then through the lower one.
       5 Make sure that the fastening strap (4) has the correct tension. And make sure that the knurled screw (6) is pushed in up to the stop.
       6 Tighten the knurled screw (6) to attach the leakage transducer (5) to the pipe (1).
     (i) Connect the leakage transducer cable (8) to the transmitter (9).
     (j) Refer to the ground instruction manual of the ultrasonic flow meter to set:
  • The serial number of the airplane
  • The input location code on the ultrasonic flow meter to numeric code: 26780443 (Green complete section).
     (k) Obey the instructions of the ground instruction manual of the ultrasonic flow meter when you do these work steps.
     (l) Monitor the flow on the ultrasonic flow meter display. It must not be more than 9.0 l.min (2.37 USgal.mn).
     (m) If the internal leakage is more than 9.0 l.min (2.37 USgal.mn) do the measurements that follow to find the cause of the high internal leakage:
  • Measure the internal leakage of the rear section of the Green hydraulic system Para A.(4)
  • Measure the internal leakage of the left wing section of the Green hydraulic system Para A.(5)
  • Measure the internal leakage of the right wing section of the Green hydraulic system Para A.(6).
     (n) Remove the leakage transducer (5):
       1 Hold the leakage transducer (5). Turn the knurled screw (6) counterclockwise to disconnect the leakage transducer (5) from the pipe (1).
       2 Push the knurled screw (6) in and disconnect the fastening strap (4) from the strap clamp (7).
       3 Remove the leakage transducer (5) from the pipe (1).
     (o) Disconnect the leakage transducer cable (8) from the transmitter (9).
   (4) Measure the internal leakage of the Green hydraulic system with an ultrasonic flow meter (rear section):

     (a) On the overhead maintenance panel 50VU, make sure that the HYD/LEAK MEASUREMENT VALVES/G P/BSW is set to on (the OFF light is off).
     (b) Refer to the lower DU of the ECAM (HYD page) to make sure that the solenoid valve operation is correct (the flow arrow of the Green hydraulic system is green and the system name is white).
     (c) On the overhead panel 40VU, make sure that the PTU P/BSW is set to AUTO (the OFF and FAULT lights are off).
     (d) Refer to the ground instruction manual of the ultrasonic flow meter to make sure that the correct software is installed.
     (e) Clean the tube (1) between the identification tapes (2) with a Textile-Lint free Cotton - (Material No.14SBA1) .
     (f) Remove the remaining acoustic coupling compound from the leakage transducer (5) with a Textile-Lint free Cotton - (Material No.14SBA1) . Do not use a detergent to clean the leakage transducer (5).
     (g) Apply a thin layer of the acoustic coupling compound (part of USF FLUXUS GST 6108, 610007AB TOOL-MEASURE,HYDRAULIC FLOW) to the contact surfaces of the leakage transducer (5).
     (h) Install the leakage transducer (5) between the identification tapes (2) on the pipe (1):
       1 Hold the leakage transducer (5) and turn the knurled screw (6) counterclockwise to the stop.
       2 Put the leakage transducer (5) in position on the pipe (1) between the identification tapes (2) and push it tightly on the pipe (1).
       3 Push the knurled screw (6) in and attach the fastening strap (4) around the pipe (1) with the thread element (3).
       4 Put the fastening strap (4) through the upper slot of the strap clamp (7) and then through the lower one.
       5 Make sure that the fastening strap (4) is tensioned correctly and that the knurled screw (6) is pressed in up to the stop.
       6 Tighten the knurled screw (6) to attach the leakage transducer (5) to the pipe (1).
     (i) Connect the leakage transducer cable (8) to the transmitter (9).
     (j) Refer to the ground instruction manual of the ultrasonic flow meter to set:
  • The serial number of the airplane
  • The input location code on the ultrasonic flow meter to numeric code: 58506925 (Green rear section).
     (k) Obey the instructions of the ground instruction manual of ultrasonic flow meter when you do these work steps.
     (l) Monitor the flow on the ultrasonic flow meter display. It must not be more than 6.0 l.min (1.58 USgal.mn).
     (m) If the internal leakage is more than 6.0 l.min (1.58 USgal.mn) do the steps in Para A.(7) to find the cause of the high internal leakage.
     (n) Remove the leakage transducer (5):
       1 Hold the leakage transducer (5) and turn the knurled screw (6) counterclockwise to disconnect the leakage transducer (5) from the pipe (1).
       2 Push the knurled screw (6) in and disconnect the fastening strap (4) from the strap clamp (7).
       3 Remove the leakage transducer (5) from the pipe (1).
     (o) Disconnect the leakage transducer cable (8) from the transmitter (9).
   (5) Measure the internal leakage of the Green hydraulic system (left wing section) with an ultrasonic flow meter:

     (a) On the overhead maintenance panel 50VU, make sure that the HYD/LEAK MEASUREMENT VALVES/G P/BSW is set to on (the OFF light is off).
     (b) Refer to the lower DU of the ECAM (HYD page) to make sure that the solenoid valve operation is correct (the flow arrow of the Green hydraulic system is green and the system name is white).
     (c) On the overhead panel 40VU, make sure that the PTU P/BSW is set to AUTO (the OFF and FAULT lights are off).
     (d) Refer to the ground instruction manual of the ultrasonic flow meter to make sure that the correct software is installed.
     (e) Clean the tube (1) between the identification tapes (2) with a Textile-Lint free Cotton - (Material No.14SBA1) .
     (f) Remove the remaining acoustic coupling compound from the leakage transducer (5) with a Textile-Lint free Cotton - (Material No.14SBA1) . Do not use a detergent to clean the leakage transducer (5).
     (g) Apply a thin layer of the acoustic coupling compound (part of USF FLUXUS GST 6108, 610007AB TOOL-MEASURE,HYDRAULIC FLOW) to the contact surfaces of the leakage transducer (5).
     (h) Install the leakage transducer (5) between the identification tapes (2) on the pipe (1):
       1 Hold the leakage transducer (5) and turn the knurled screw (6) counterclockwise to the stop.
       2 Put the leakage transducer (5) in position on the pipe (1) between the identification tapes (2) and push it tightly on the pipe (1).
       3 Push the knurled screw (6) in and attach the fastening strap (4) around the pipe (1) with the thread element (3).
       4 Put the fastening strap (4) through the upper slot of the strap clamp (7) and then through the lower one.
       5 Make sure that the fastening strap (4) has the correct tension. And make sure that the knurled screw (6) is pushed in up to the stop.
       6 Tighten the knurled screw (6) to attach the leakage transducer (5) to the pipe (1).
     (i) Connect the leakage transducer cable (8) to the transmitter (9).
     (j) Refer to the ground instruction manual of the ultrasonic flow meter to set:
  • The serial number of the airplane
  • The input location code on the ultrasonic flow meter to numeric code: 79477326 (Green left wing section).
     (k) Obey the instructions of the ground instruction manual of the ultrasonic flow meter when you do these work steps.
     (l) Monitor the flow on the ultrasonic flow meter display. It must not be more than 3.7 l.min (0.97 USgal.mn).
     (m) If the internal leakage is more than 3.7 l.min (0.97 USgal.mn) do the steps in Para A.(7) to find the cause of the high internal leakage.
     (n) Remove the leakage transducer (5):
       1 Hold the leakage transducer (5) and turn the knurled screw (6) counterclockwise to disconnect the leakage transducer (5) from the pipe (1).
       2 Push the knurled screw (6) in and disconnect the fastening strap (4) from the strap clamp (7).
       3 Remove the leakage transducer (5) from the pipe (1).
     (o) Disconnect the leakage transducer cable (8) from the transmitter (9).
   (6) Measure the internal leakage of the Green hydraulic system (right wing section) with an ultrasonic flow meter:

     (a) On the overhead maintenance panel 50VU, make sure that the HYD/LEAK MEASUREMENT VALVES/G P/BSW is set to on (the OFF light is off).
     (b) Refer to the lower DU of the ECAM (HYD page) to make sure that the solenoid valve operation is correct (the flow arrow of the Green hydraulic system is green and the system name is white).
     (c) On the overhead panel 40VU, make sure that the PTU P/BSW is set to AUTO (the OFF and FAULT lights are off).
     (d) Refer to the ground instruction manual of the ultrasonic flow meter to make sure that the correct software is installed.
     (e) Clean the tube (1) between the identification tapes (2) with a Textile-Lint free Cotton - (Material No.14SBA1) .
     (f) Remove the remaining acoustic coupling compound from the leakage transducer (5) with a Textile-Lint free Cotton - (Material No.14SBA1) . Do not use a detergent to clean the leakage transducer (5).
     (g) Apply a thin layer of the acoustic coupling compound (part of USF FLUXUS GST 6108, 610007AB TOOL-MEASURE,HYDRAULIC FLOW) to the contact surfaces of the leakage transducer (5).
     (h) Install the leakage transducer (5) between the identification tapes (2) on the pipe (1):
       1 Hold the leakage transducer (5) and turn the knurled screw (6) counterclockwise to the stop.
       2 Put the leakage transducer (5) in position on the pipe (1) between the identification tapes (2) and press it tightly on the pipe (1).
       3 Push the knurled screw (6) in and attach the fastening strap (4) around the pipe (1) with the thread element (3).
       4 Put the fastening strap (4) through the upper slot of the strap clamp (7) and then through the lower one.
       5 Make sure that the fastening strap (4) has the correct tension. And make sure that the knurled screw (6) is pushed in up to the stop.
       6 Tighten the knurled screw (6) to attach the leakage transducer (5) to the pipe (1).
     (i) Connect the leakage transducer cable (8) to the transmitter (9).
     (j) Refer to the ground instruction manual of the ultrasonic flow meter to set:
  • The serial number of the airplane
  • The input location code on the ultrasonic flow meter to numeric code: 28073802 (Green right wing section).
     (k) Obey the instructions of the ground instruction manual of the ultrasonic flow meter when you do these work steps.
     (l) Monitor the flow on the ultrasonic flow meter display. It must not be more than 3.7 l.min (0.97 USgal.mn).
     (m) If the internal leakage is more than 3.7 l.min (0.97 USgal.mn) do the steps in Para A.(7) to find the cause of the high internal leakage.
     (n) Remove the leakage transducer (5):
       1 Hold the leakage transducer (5) and turn the knurled screw (6) counterclockwise to disconnect the leakage transducer (5) from the pipe (1).
       2 Push the knurled screw (6) in and disconnect the fastening strap (4) from the strap clamp (7).
       3 Remove the leakage transducer (5) from the pipe (1).
     (o) Disconnect the leakage transducer cable (8) from the transmitter (9).
   (7) Permitted leakage rates of the components and how to find the defective component:
     (a) The maximum permitted internal leakage for components related to the Green hydraulic system is:
Aileron servocontrol: 1.5 l.min (0.39 USgal.mn)
Spoiler 5: 1.5 l.min (0.39 USgal.mn)
THS actuator servovalve: 0.75 l.min (0.19 USgal.mn)
Elevator servocontrol: 1.5 l.min (0.39 USgal.mn)
Rudder servocontrol: 2.1 l.min (0.55 USgal.mn)
Yaw damper actuator: 1.3 l.min (0.34 USgal.mn)
Flap PCU valve block: 0.2 l.min (0.05 USgal.mn)
Slat PCU valve block: 0.2 l.min (0.05 USgal.mn)

NOTE: The maximum leakage rates for components are given to help in trouble shooting. The total leakage of components in a section (left wing, right wing etc) of the system must be less than the leakage permitted for that section. Also, the sum of all leakages of all the sections must not be more than the leakage permitted for the full system.
     (b) If the internal leakage rate is too high you can find the defective component if you:
       1 Listen to the pipes and components which can be the cause.
       2 Touch the pipes and components, a high leakage rate will cause an increase in their temperature.
CAUTION: DO NOT DISCONNECT AND CAP THE RETURN LINE FROM A SERVOCONTROL TO DO A LEAKAGE CHECK. IF A SUPPLY OF SYSTEM PRESSURE GETS TO THE SERVOCONTROL IT CAN CAUSE DAMAGE IF THERE IS NO RETURN FLOW.
     (c) If you think that a servocontrol is the cause, disconnect and cap the supply to the servocontrol. Do the test again and if the leakage rate is in limits, the servocontrol is the defective component.
   (8) If the check result is satisfactory, do the steps that follow:
     (a) Open, safety and tag this(these) circuit breaker(s):
1GA, 2GA, 52GA, 1701GK, 1702GK.
     (b) Remove the blanking plug from the electrical connector 49GA-A.
     (c) Connect the electrical connector 49GA-A to the safety valve 49GA.
Subtask 29-00-00-280-050-C ** ON A/C NOT FOR ALL
A. Check of the Internal Leakage of the Green Hydraulic System
NOTE: You can do this test with or without an ultrasonic flow meter. If the internal leakage is out of limits then the ultrasonic flow meter must be used to prevent an aircraft-on-ground (AOG) condition.
   (1) Measure the internal leakage of the Green hydraulic system (complete) without an ultrasonic flow meter:
     (a) On the overhead maintenance panel 50VU, make sure that the HYD/LEAK MEASUREMENT VALVES/G P/BSW is set to on (OFF light is not on).
     (b) On the overhead panel 40VU, make sure that the PTU P/BSW is set to OFF (the OFF light is on).
     (c) Monitor the flow shown on the ground supply flow meter. It must not be more than 7.2 l.min (1.90 USgal.mn).
     (d) If the internal leakage is too much:
       1 Depressurize the Green hydraulic system
(Ref. AMM TASK 29-10-00-864-001).
       2 Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
       3 Disconnect the ground supply from the aircraft ground test connections.
       4 Install the blanking caps on the ground test connections.
       5 Pressurize the Green hydraulic system from Yellow hydraulic system through the PTU with the Yellow electric pump (Ref. AMM TASK 29-23-00-863-001).
       6 Do the leakage check of all sections of the Green hydraulic system to find the cause of high leakage.
   (2) Measure the internal leakage of the Green hydraulic system (central section) with an ultrasonic flow meter:

     (a) On the ECAM control panel on the center pedestal, push the HYD P/B. Make sure that the lower DU shows the HYD page.
     (b) On the overhead maintenance panel 50VU, lift the guard and set the HYD/LEAK MEASUREMENT VALVES/G P/BSW to OFF (the OFF light is on).
     (c) Refer to the lower DU of the ECAM (HYD page) to make sure that the solenoid valve operation is correct (the color of the flow arrow and system name of the Green hydraulic system is amber).
     (d) On the overhead panel 40VU, make sure that the PTU P/BSW is set to AUTO (the OFF and FAULT lights are off).
     (e) Refer to the ground instruction manual of the ultrasonic flow meter to make sure that the correct software is installed.
     (f) Clean the tube (1) between the identification tapes (2) with a Textile-Lint free Cotton - (Material No.14SBA1) .
     (g) Remove the remaining acoustic coupling compound from the leakage transducer (5) with a Textile-Lint free Cotton - (Material No.14SBA1) . Do not use a detergent to clean the leakage transducer (5).
     (h) Apply a thin layer of the acoustic coupling compound (part of USF FLUXUS GST 6108, 610007AB TOOL-MEASURE,HYDRAULIC FLOW) to the contact surfaces of the leakage transducer (5).
     (i) Install the leakage transducer (5) between the identification tapes (2) on the pipe (1):
       1 Hold the leakage transducer (5) and turn the knurled screw (6) counterclockwise to the stop.
       2 Put the leakage transducer (5) in position on the pipe (1) between the identification tapes (2). Then push it tightly on the pipe (1).
       3 Push the knurled screw (6) in. Then attach the fastening strap (4) around the pipe (1) with the thread element (3).
       4 Put the fastening strap (4) through the upper slot of the strap clamp (7) and then through the lower one.
       5 Make sure that the fastening strap (4) has the correct tension. And make sure that the knurled screw (6) is pushed in up to the stop.
       6 Tighten the knurled screw (6) to attach the leakage transducer (5) to the pipe (1).
     (j) Connect the leakage transducer cable (8) to the transmitter (9).
     (k) Refer to the ground instruction manual of the ultrasonic flow meter to set:
  • The serial number of the airplane
  • The input location code on the ultrasonic flow meter to numeric code: 64050536 (Green central section).
     (l) Obey the instructions of the ground instruction manual of the ultrasonic flow meter when you do these work steps.
     (m) Monitor the flow on the ultrasonic flow meter display. It must be not more than 1.6 l.min (0.42 USgal.mn).
     (n) If the internal leakage is more than 1.6 l.min (0.42 USgal.mn) do the steps that follow:
       1 Depressurize the Green and the Yellow hydraulic systems after operation of the PTU (Ref. AMM TASK 29-23-00-864-001).
       2 In the main gear compartment, disconnect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-001).
       3 Remove the blanking caps from the ground test connections.
       4 Connect a ground hydraulic power supply to the ground test connections of the Green hydraulic system.
       5 Pressurize the Green hydraulic system from the ground supply (Ref. AMM TASK 29-10-00-863-001).
       6 On the overhead panel 23VU, make sure that the ELAC1, SEC1 and FAC1 P/BSW are set to on (the OFF and FAULT lights are not on).
       7 On the overhead panel 24VU, make sure that the ELAC2, SEC2 and FAC2 P/BSW are set to on (the OFF and FAULT lights are not on).
       8 On the overhead panel 40VU set the PTU P/BSW to OFF (the OFF light comes on).
       9 Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
       10 Monitor the flow on the ultrasonic flow meter display.
       11 If the internal leakage is more than 1.6 l.min (0.42 USgal.mn) do the steps in Para A.(7) to find the cause of the high internal leakage.
       12 If the internal leakage is less than 1.6 l.min (0.42 USgal.mn) do the steps that follow:
         a Depressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-864-001).
         b Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
         c Disconnect the ground hydraulic supply from the aircraft ground test connections.
         d Install the blanking caps on the ground test connections.
         e On the overhead panel 40VU, set the PTU P/BSW to AUTO (the OFF and the Fault light are not on).
         f Pressurize the Green hydraulic system from the Yellow hydraulic system through the PTU with the Yellow electric pump (Ref. AMM TASK 29-23-00-863-001).
     (o) Remove the leakage transducer (5):
       1 Hold the leakage transducer (5) and turn the knurled screw (6) counterclockwise to disconnect the leakage transducer (5) from the pipe (1).
       2 Push the knurled screw (6) in and disconnect the fastening strap (4) from the strap clamp (7).
       3 Remove the leakage transducer (5) from the pipe (1).
     (p) Disconnect the leakage transducer cable (8) from the transmitter (9).
   (3) Measure the internal leakage of the Green hydraulic system with an ultrasonic flow meter (complete section):

     (a) On the overhead maintenance panel 50VU, make sure that the HYD/LEAK MEASUREMENT VALVES/G P/BSW is set to on (the OFF light is off).
     (b) Refer to the lower DU of the ECAM (HYD page) to make sure that the solenoid valve operation is correct (the flow arrow of the Green hydraulic system is green and the system name is white).
     (c) On the overhead panel 40VU, make sure that the PTU P/BSW is set to AUTO (the OFF and FAULT lights are off).
     (d) Refer to the ground instruction manual of the ultrasonic flow meter to make sure that the correct software is installed.
     (e) Clean the tube (1) between the identification tapes (2) with a Textile-Lint free Cotton - (Material No.14SBA1) .
     (f) Remove the remaining acoustic coupling compound from the leakage transducer (5) with a Textile-Lint free Cotton - (Material No.14SBA1) . Do not use a detergent to clean the leakage transducer (5).
     (g) Apply a thin layer of the acoustic coupling compound (part of USF FLUXUS GST 6108, 610007AB TOOL-MEASURE,HYDRAULIC FLOW) to the contact surfaces of the leakage transducer (5).
     (h) Install the leakage transducer (5) between the identification tapes (2) on the pipe (1):
       1 Hold the leakage transducer (5) and turn the knurled screw (6) counterclockwise to the stop.
       2 Put the leakage transducer (5) in position on the pipe (1) between the identification tapes (2). Then push it tightly on the pipe (1).
       3 Push the knurled screw (6) in. Then attach the fastening strap (4) around the pipe (1) with the thread element (3).
       4 Put the fastening strap (4) through the upper slot of the strap clamp (7) and then through the lower one.
       5 Make sure that the fastening strap (4) has the correct tension. And make sure that the knurled screw (6) is pushed in up to the stop.
       6 Tighten the knurled screw (6) to attach the leakage transducer (5) to the pipe (1).
     (i) Connect the leakage transducer cable (8) to the transmitter (9).
     (j) Refer to the ground instruction manual of the ultrasonic flow meter to set:
  • The serial number of the airplane
  • The input location code on the ultrasonic flow meter to numeric code: 26780443 (Green complete section).
     (k) Obey the instructions of the ground instruction manual of the ultrasonic flow meter when you do these work steps.
     (l) Monitor the flow on the ultrasonic flow meter display. It must not be more than 7.2 l.min (1.90 USgal.mn).
     (m) If the internal leakage is more than 7.2 l.min (1.90 USgal.mn) do the measurements that follow to find the cause of the high internal leakage:
  • Measure the internal leakage of the rear section of the Green hydraulic system Para A.(4)
  • Measure the internal leakage of the left wing section of the Green hydraulic system Para A.(5)
  • Measure the internal leakage of the right wing section of the Green hydraulic system Para A.(6).
     (n) Remove the leakage transducer (5):
       1 Hold the leakage transducer (5). Turn the knurled screw (6) counterclockwise to disconnect the leakage transducer (5) from the pipe (1).
       2 Push the knurled screw (6) in and disconnect the fastening strap (4) from the strap clamp (7).
       3 Remove the leakage transducer (5) from the pipe (1).
     (o) Disconnect the leakage transducer cable (8) from the transmitter (9).
   (4) Measure the internal leakage of the Green hydraulic system with an ultrasonic flow meter (rear section):

     (a) On the overhead maintenance panel 50VU, make sure that the HYD/LEAK MEASUREMENT VALVES/G P/BSW is set to on (the OFF light is off).
     (b) Refer to the lower DU of the ECAM (HYD page) to make sure that the solenoid valve operation is correct (the flow arrow of the Green hydraulic system is green and the system name is white).
     (c) On the overhead panel 40VU, make sure that the PTU P/BSW is set to AUTO (the OFF and FAULT lights are off).
     (d) Refer to the ground instruction manual of the ultrasonic flow meter to make sure that the correct software is installed.
     (e) Clean the tube (1) between the identification tapes (2) with a Textile-Lint free Cotton - (Material No.14SBA1) .
     (f) Remove the remaining acoustic coupling compound from the leakage transducer (5) with a Textile-Lint free Cotton - (Material No.14SBA1) . Do not use a detergent to clean the leakage transducer (5).
     (g) Apply a thin layer of the acoustic coupling compound (part of USF FLUXUS GST 6108, 610007AB TOOL-MEASURE,HYDRAULIC FLOW) to the contact surfaces of the leakage transducer (5).
     (h) Install the leakage transducer (5) between the identification tapes (2) on the pipe (1):
       1 Hold the leakage transducer (5) and turn the knurled screw (6) counterclockwise to the stop.
       2 Put the leakage transducer (5) in position on the pipe (1) between the identification tapes (2) and push it tightly on the pipe (1).
       3 Push the knurled screw (6) in and attach the fastening strap (4) around the pipe (1) with the thread element (3).
       4 Put the fastening strap (4) through the upper slot of the strap clamp (7) and then through the lower one.
       5 Make sure that the fastening strap (4) is tensioned correctly and that the knurled screw (6) is pressed in up to the stop.
       6 Tighten the knurled screw (6) to attach the leakage transducer (5) to the pipe (1).
     (i) Connect the leakage transducer cable (8) to the transmitter (9).
     (j) Refer to the ground instruction manual of the ultrasonic flow meter to set:
  • The serial number of the airplane
  • The input location code on the ultrasonic flow meter to numeric code: 58506925 (Green rear section).
     (k) Obey the instructions of the ground instruction manual of ultrasonic flow meter when you do these work steps.
     (l) Monitor the flow on the ultrasonic flow meter display. It must not be more than 4.8 l.min (1.27 USgal.mn).
     (m) If the internal leakage is more than 4.8 l.min (1.27 USgal.mn) do the steps in Para A.(7) to find the cause of the high internal leakage.
     (n) Remove the leakage transducer (5):
       1 Hold the leakage transducer (5) and turn the knurled screw (6) counterclockwise to disconnect the leakage transducer (5) from the pipe (1).
       2 Push the knurled screw (6) in and disconnect the fastening strap (4) from the strap clamp (7).
       3 Remove the leakage transducer (5) from the pipe (1).
     (o) Disconnect the leakage transducer cable (8) from the transmitter (9).
   (5) Measure the internal leakage of the Green hydraulic system (left wing section) with an ultrasonic flow meter:

     (a) On the overhead maintenance panel 50VU, make sure that the HYD/LEAK MEASUREMENT VALVES/G P/BSW is set to on (the OFF light is off).
     (b) Refer to the lower DU of the ECAM (HYD page) to make sure that the solenoid valve operation is correct (the flow arrow of the Green hydraulic system is green and the system name is white).
     (c) On the overhead panel 40VU, make sure that the PTU P/BSW is set to AUTO (the OFF and FAULT lights are off).
     (d) Refer to the ground instruction manual of the ultrasonic flow meter to make sure that the correct software is installed.
     (e) Clean the tube (1) between the identification tapes (2) with a Textile-Lint free Cotton - (Material No.14SBA1) .
     (f) Remove the remaining acoustic coupling compound from the leakage transducer (5) with a Textile-Lint free Cotton - (Material No.14SBA1) . Do not use a detergent to clean the leakage transducer (5).
     (g) Apply a thin layer of the acoustic coupling compound (part of USF FLUXUS GST 6108, 610007AB TOOL-MEASURE,HYDRAULIC FLOW) to the contact surfaces of the leakage transducer (5).
     (h) Install the leakage transducer (5) between the identification tapes (2) on the pipe (1):
       1 Hold the leakage transducer (5) and turn the knurled screw (6) counterclockwise to the stop.
       2 Put the leakage transducer (5) in position on the pipe (1) between the identification tapes (2) and push it tightly on the pipe (1).
       3 Push the knurled screw (6) in and attach the fastening strap (4) around the pipe (1) with the thread element (3).
       4 Put the fastening strap (4) through the upper slot of the strap clamp (7) and then through the lower one.
       5 Make sure that the fastening strap (4) has the correct tension. And make sure that the knurled screw (6) is pushed in up to the stop.
       6 Tighten the knurled screw (6) to attach the leakage transducer (5) to the pipe (1).
     (i) Connect the leakage transducer cable (8) to the transmitter (9).
     (j) Refer to the ground instruction manual of the ultrasonic flow meter to set:
  • The serial number of the airplane
  • The input location code on the ultrasonic flow meter to numeric code: 79477326 (Green left wing section).
     (k) Obey the instructions of the ground instruction manual of the ultrasonic flow meter when you do these work steps.
     (l) Monitor the flow on the ultrasonic flow meter display. It must not be more than 3.0 l.min (0.79 USgal.mn)
     (m) If the internal leakage is more than 3.0 l.min (0.79 USgal.mn) do the steps in Para A.(7) to find the cause of the high internal leakage.
     (n) Remove the leakage transducer (5):
       1 Hold the leakage transducer (5) and turn the knurled screw (6) counterclockwise to disconnect the leakage transducer (5) from the pipe (1).
       2 Push the knurled screw (6) in and disconnect the fastening strap (4) from the strap clamp (7).
       3 Remove the leakage transducer (5) from the pipe (1).
     (o) Disconnect the leakage transducer cable (8) from the transmitter (9).
   (6) Measure the internal leakage of the Green hydraulic system (right wing section) with an ultrasonic flow meter:

     (a) On the overhead maintenance panel 50VU, make sure that the HYD/LEAK MEASUREMENT VALVES/G P/BSW is set to on (the OFF light is off).
     (b) Refer to the lower DU of the ECAM (HYD page) to make sure that the solenoid valve operation is correct (the flow arrow of the Green hydraulic system is green and the system name is white).
     (c) On the overhead panel 40VU, make sure that the PTU P/BSW is set to AUTO (the OFF and FAULT lights are off).
     (d) Refer to the ground instruction manual of the ultrasonic flow meter to make sure that the correct software is installed.
     (e) Clean the tube (1) between the identification tapes (2) with a Textile-Lint free Cotton - (Material No.14SBA1) .
     (f) Remove the remaining acoustic coupling compound from the leakage transducer (5) with a Textile-Lint free Cotton - (Material No.14SBA1) . Do not use a detergent to clean the leakage transducer (5).
     (g) Apply a thin layer of the acoustic coupling compound (part of USF FLUXUS GST 6108, 610007AB TOOL-MEASURE,HYDRAULIC FLOW) to the contact surfaces of the leakage transducer (5).
     (h) Install the leakage transducer (5) between the identification tapes (2) on the pipe (1):
       1 Hold the leakage transducer (5) and turn the knurled screw (6) counterclockwise to the stop.
       2 Put the leakage transducer (5) in position on the pipe (1) between the identification tapes (2) and press it tightly on the pipe (1).
       3 Push the knurled screw (6) in and attach the fastening strap (4) around the pipe (1) with the thread element (3).
       4 Put the fastening strap (4) through the upper slot of the strap clamp (7) and then through the lower one.
       5 Make sure that the fastening strap (4) has the correct tension. And make sure that the knurled screw (6) is pushed in up to the stop.
       6 Tighten the knurled screw (6) to attach the leakage transducer (5) to the pipe (1).
     (i) Connect the leakage transducer cable (8) to the transmitter (9).
     (j) Refer to the ground instruction manual of the ultrasonic flow meter to set:
  • The serial number of the airplane
  • The input location code on the ultrasonic flow meter to numeric code: 28073802 (Green right wing section).
     (k) Obey the instructions of the ground instruction manual of the ultrasonic flow meter when you do these work steps.
     (l) Monitor the flow on the ultrasonic flow meter display. It must not be more than 3.0 l.min (0.79 USgal.mn).
     (m) If the internal leakage is more than 3.0 l.min (0.79 USgal.mn) do the steps in Para A.(7) to find the cause of the high internal leakage.
     (n) Remove the leakage transducer (5):
       1 Hold the leakage transducer (5) and turn the knurled screw (6) counterclockwise to disconnect the leakage transducer (5) from the pipe (1).
       2 Push the knurled screw (6) in and disconnect the fastening strap (4) from the strap clamp (7).
       3 Remove the leakage transducer (5) from the pipe (1).
     (o) Disconnect the leakage transducer cable (8) from the transmitter (9).
   (7) Permitted leakage rates of the components and how to find the defective component:
     (a) The maximum permitted internal leakage for components related to the Green hydraulic system is:
Aileron servocontrol: 1.5 l.min (0.40 USgal.mn)
Spoiler 5: 1.5 l.min (0.40 USgal.mn)
THS actuator servovalve: 0.75 l.min (0.20 USgal.mn)
Elevator servocontrol: 1.5 l.min (0.40 USgal.mn)
Rudder servocontrol: 2.1 l.min (0.55 USgal.mn)
Yaw damper actuator: 1.3 l.min (0.34 USgal.mn)
Flap PCU valve block: 0.2 l.min (0.05 USgal.mn)
Slat PCU valve block: 0.2 l.min (0.05 USgal.mn)

NOTE: The maximum leakage rates for components are given to help in trouble shooting. The total leakage of components in a section (left wing, right wing etc) of the system must be less than the leakage permitted for that section. Also, the sum of all leakages of all the sections must not be more than the leakage permitted for the full system.
     (b) If the internal leakage rate is too high you can find the defective component if you:
       1 Listen to the pipes and components which can be the cause.
       2 Touch the pipes and components, a high leakage rate will cause an increase in their temperature.
CAUTION: DO NOT DISCONNECT AND CAP THE RETURN LINE FROM A SERVOCONTROL TO DO A LEAKAGE CHECK. IF A SUPPLY OF SYSTEM PRESSURE GETS TO THE SERVOCONTROL IT CAN CAUSE DAMAGE IF THERE IS NO RETURN FLOW.
     (c) If you think that a servocontrol is the cause, disconnect and cap the supply to the servocontrol. Do the test again and if the leakage rate is in limits, the servocontrol is the defective component.
   (8) If the check result is satisfactory, do the steps that follow:
     (a) Open, safety and tag this(these) circuit breaker(s):
1GA, 2GA, 52GA, 1701GK, 1702GK.
     (b) Remove the blanking plug from the electrical connector 49GA-A.
     (c) Connect the electrical connector 49GA-A to the safety valve 49GA.
Subtask 29-00-00-865-080-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUL/G/LGCIU/SYS1/NORM1GAC09
** ON A/C NOT FOR ALL
49VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKH12
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKR35
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR34
** ON A/C ALL
121VUHYDRAULIC/LGCIU/SYS22GAQ35
121VUHYDRAULIC/LGCIU/SYS1/GRND SPLY52GAQ34
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR33
Subtask 29-00-00-710-058-A
C. Test
   (1) Do an Operational Check to make sure that the safety valve closes at 260 kts (Ref. AMM TASK 32-31-00-710-005).
5. Close-up
Subtask 29-00-00-860-053-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to the serviceable condition.
   (1) On the overhead panel 50VU, lift the guard and set the HYD/LEAK MEASUREMENT VALVES/G P/BSW to on. Make sure that the OFF light goes off.
   (2) Refer to the lower DU of the ECAM (HYD page) and make sure that the solenoid valve has operated correctly (the flow arrow of the Green hydraulic system is colored green and the system name is colored white).
   (3) Depressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-864-001).
   (4) Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
   (5) Make sure that the work area is clean and clear of tools and other items.
   (6) Close the right main door of the main gear (Ref. AMM TASK 32-12-00-410-001).
   (7) Disconnect the ground hydraulic supply from the aircraft ground test connections.
   (8) Install the blanking caps on the ground test connections.
   (9) On the overhead panel 40VU, set the PTU P/BSW to AUTO (the OFF and FAULT lights are not on).
   (10) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
   (11) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
Subtask 29-00-00-410-052-A ** ON A/C NOT FOR ALL
B. Close Access
   (1) Close the access door 197CB.
   (2) Make sure that the work area is clean and clear of tools and other items.
Subtask 29-00-00-860-053-C ** ON A/C NOT FOR ALL
C. Put the aircraft back to the serviceable condition.
   (1) On the overhead panel 50VU, lift the guard and set the HYD/LEAK MEASUREMENT VALVES/G P/BSW to on. Make sure that the OFF light goes off.
   (2) Refer to the lower DU of the ECAM (HYD page) and make sure that the solenoid valve operates correctly (the flow arrow of the Green hydraulic system is green and the system name is white).
   (3) If an ultrasonic flow meter was used:
     (a) Depressurize the Green and Yellow hydraulic systems after operation of the PTU (Ref. AMM TASK 29-23-00-864-001).
   (4) If an ultrasonic flow meter was not used:
     (a) Depressurize the Green hydraulic system
(Ref. AMM TASK 29-10-00-864-001).
     (b) Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
     (c) Disconnect the ground hydraulic supply from the aircraft ground test connections.
     (d) Install the blanking caps on the ground test connections.
   (5) Make sure that the work area is clean and clear of tools and other items.
   (6) Close the right hand door of the main gear (Ref. AMM TASK 32-12-00-410-001).
   (7) On the overhead panel 40VU, set the PTU P/BSW to AUTO (the OFF and FAULT lights are off).
   (8) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
   (9) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
Subtask 29-00-00-410-052-B ** ON A/C NOT FOR ALL
D. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) If necessary, close the access door 197CB.