Operational Test of the THS Actuator with Electrical Motor N°3
TASK 27-96-00-710-006-A
Operational Test of the THS Actuator with Electrical Motor N°3
Refer to the MPD TASK: 274000-04
OPERATIONAL CHECK OF THS ACTUATOR WITH ELECTRICAL MOTOR NO 3
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 27-96-00-860-065-A
Subtask 27-96-00-710-053-A
Subtask 27-96-00-860-066-A
[Rev.10 from 2021]
2026.03.31 23:59:56 UTC
Operational Test of the THS Actuator with Electrical Motor N°3
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
ZONE: 210
1. Reason for the JobRefer to the MPD TASK: 274000-04
OPERATIONAL CHECK OF THS ACTUATOR WITH ELECTRICAL MOTOR NO 3
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| 822 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 29-23-00-863-001-A | Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump |
| TASK 29-23-00-864-001-A | Depressurize the Green and Yellow Hydraulic Systems after Operation of the PTU |
| TASK 29-24-00-863-001-A | Pressurize the Yellow Hydraulic System with the Electric Pump |
| TASK 29-24-00-864-001-A | Depressurize the Yellow Hydraulic System |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 34-10-00-860-004-A | Inertial Reference (IR) Alignment-Procedure |
| TASK 34-10-00-860-004-A-01 | Automatic Inertial Reference (IR) Alignment-Procedure |
| TASK 34-10-00-860-004-A-02 | Inertial Reference (IR) Alignment-Procedure to do a Check of the Links between each Flight Management and Guidance Computer (FMGC) and the three Air Data/Inertial Reference Units (ADIRUs) |
Subtask 27-96-00-860-065-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Pressurize the Green and Yellow hydraulic systems of the aircraft (Ref. AMM TASK 29-23-00-863-001) (Ref. AMM TASK 29-24-00-863-001).
(3) Make sure that the ADIRS are aligned (Ref. AMM TASK 34-10-00-860-004).
(4) On the overhead panel 23VU:
(7) On the center pedestal, on the ECAM control panel, push the F/CTL pushbutton switch (on the lower ECAM display unit, the F/CTL page comes into view).
Subtask 27-96-00-010-055-A (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Pressurize the Green and Yellow hydraulic systems of the aircraft (Ref. AMM TASK 29-23-00-863-001) (Ref. AMM TASK 29-24-00-863-001).
(3) Make sure that the ADIRS are aligned (Ref. AMM TASK 34-10-00-860-004).
(4) On the overhead panel 23VU:
- release the FLT CTL/ELAC 1 and FLT CTL/SEC 1 pushbutton switches (on these pushbutton switches, the OFF legends come on).
- release the FLT CTL/ELAC 2, FLT CTL/SEC 2 and FLT CTL/SEC 3 pushbutton switches (on these pushbutton switches, the OFF legends come on).
(7) On the center pedestal, on the ECAM control panel, push the F/CTL pushbutton switch (on the lower ECAM display unit, the F/CTL page comes into view).
B. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 822.
(2) Open the access door 822.
(3) On the battery power center 105VU:
Subtask 27-96-00-865-053-A (1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 822.
(2) Open the access door 822.
(3) On the battery power center 105VU:
- loosen the two screws and remove the protective cover.
C. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 105VU | FLT CTL/SEC1/STBY SPLY | 22CE | B01 |
| 121VU | FLIGHT CONTROLS/SEC2/SPLY | 21CE2 | Q18 |
| 121VU | FLIGHT CONTROLS/THS ACTR/MOT3 | 19CE3 | Q17 |
Subtask 27-96-00-710-053-A
A. Do this test:
5. Close-up| ACTION | RESULT |
|---|---|
1.On the center pedestal:
| |
2.On the overhead panel 24VU:
| On the overhead panel 24VU:
|
| | On the center pedestal:
|
| | On the lower ECAM display unit, on the F/CTL page :
|
Subtask 27-96-00-860-066-A
A. Put the aircraft back to its initial configuration.
(1) On the overhead panel 23VU:
(4) Depressurize the Green and Yellow hydraulic systems of the aircraft (Ref. AMM TASK 29-23-00-864-001) (Ref. AMM TASK 29-24-00-864-001).
(5) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
Subtask 27-96-00-410-057-A (1) On the overhead panel 23VU:
- push the FLT CTL/ELAC 1 and FLT CTL/SEC 1 pushbutton switches (on these pushbutton switches, the OFF legends go off).
- push the FLT CTL/ELAC 2 and FLT CTL/SEC 3 pushbutton switches (on these pushbutton switches, the OFF legends go off).
(4) Depressurize the Green and Yellow hydraulic systems of the aircraft (Ref. AMM TASK 29-23-00-864-001) (Ref. AMM TASK 29-24-00-864-001).
(5) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
B. Close Access
(1) Install the protective cover on the battery power center 105VU.
(2) Tighten the two screws.
(3) Close the access door 822.
(4) Remove the access platform(s).
(1) Install the protective cover on the battery power center 105VU.
(2) Tighten the two screws.
(3) Close the access door 822.
(4) Remove the access platform(s).