Installation of the High Pressure Turbine Active Clearance Control (HPTACC) Valve [CFMB]
TASK 75-21-10-400-002-A
Installation of the High Pressure Turbine Active Clearance Control (HPTACC) Valve
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 75-21-10-860-051-A ** ON A/C NOT FOR ALL
Subtask 75-21-10-420-051-A ** ON A/C NOT FOR ALL
Subtask 75-21-10-869-053-A ** ON A/C NOT FOR ALL Subtask 75-21-10-410-057-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 03:10:04 UTC
Installation of the High Pressure Turbine Active Clearance Control (HPTACC) Valve
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.CP2101) | graphite grease |
| (Material No.CP8001) | lockwire 0.032 in. (0.8 mm) dia. |
| (Material No.CP8002) | lockwire 0.032 in. (0.8 mm) dia |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 400 | POWER PLANT, NACELLES AND PYLONS |
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR, 461AL, 462AR | |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 30 | GASKET | AIPC 75-21-10-01-020 |
| 100 | GASKET | AIPC 75-21-10-01-060 |
| 90 | GASKET | AIPC 75-21-10-01-060 |
| 155 | GASKETS | AIPC 75-21-10-01-090 |
| 150 | ORIFICE PLATE | AIPC 75-21-10-01-100 |
| 170 | SEAL RING | AIPC 75-21-10-01-120 |
| 280 | GASKET | AIPC 75-21-10-01-150 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 71-00-00-710-006-B | Minimum Idle Check |
| TASK 71-13-00-010-040-B | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-B | Closing of the Fan Cowl Doors |
| TASK 73-29-00-710-040-B | Operational Test of the FADEC on the Ground (with Engine Motoring) |
| TASK 73-29-00-710-040-B-02 | Operational Test of the FADEC on the Ground (with Engine Non motoring) |
| TASK 78-30-00-081-041-B | Make the Thrust Reverser Serviceable after Maintenance |
| TASK 78-30-00-481-041-B | Make the Thrust Reverser Unserviceable for Maintenance |
| TASK 78-36-00-010-040-B | Opening of the Thrust Reverser Doors |
| TASK 78-36-00-410-040-B | Closing of the Thrust Reverser Doors |
Subtask 75-21-10-860-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
Subtask 75-21-10-865-057-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 75-21-10-010-059-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 1000EM1 (ENGINE1) | |||
| 49VU | FUEL/LP VALVE/MOT1/ENG1 | 1QG | A08 |
| 121VU | FUEL/LP VALVE/MOT2/ENG1 | 3QG | M25 |
| FOR FIN: 1000EM2 (ENGINE2) | |||
| 49VU | FUEL/LP VALVE/MOT1/ENG2 | 2QG | A09 |
| 121VU | FUEL/LP VALVE/MOT2/ENG2 | 4QG | M26 |
C. Get Access
(1) Make sure that the fan cowl doors are open: (Ref. AMM TASK 71-13-00-010-040)
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Make sure that the thrust reverser doors are open: (Ref. AMM TASK 78-36-00-010-040)
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 75-21-10-040-055-A ** ON A/C NOT FOR ALL 4. Procedure(1) Make sure that the fan cowl doors are open: (Ref. AMM TASK 71-13-00-010-040)
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Make sure that the thrust reverser doors are open: (Ref. AMM TASK 78-36-00-010-040)
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 75-21-10-420-051-A ** ON A/C NOT FOR ALL
A. Installation of the HPTACC
(1) Install the HPTACC valve on the HPC front case boss as follows:
(a) Clean the component interface and/or the adjacent area.
(b) Do a visual inspection of the component interface and/or the adjacent area.
PRE SB 72-0846
(c) Remove the blanking plugs from:
(e) Install the bolts (110) to assemble the 9th-stage outlet port of the HPTACC valve (10) and the 9th-stage air outlet elbow (120).
(f) TORQUE the bolts (110) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
.
END OF PRE SB 72-0846
POST SB 72-0846
(g) Remove the PLUG - BLANKING from:
(i) Install the bolts (110) to assemble the HPTCC manifold outlet-port of the HPTACC valve (10) and the HPTCC manifold outlet (2480M87G01).
(j) TORQUE the bolts (110) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
.
END OF POST SB 72-0846
(k) Remove the blanking plug from the HPC front case boss (20) and the 4th-stage inlet of the HPTACC (10).
(l) Put the new AIPC 75-21-10-01-020 GASKET (30) in position on the HPC front case boss (20).
(m) Put the HPTACC valve (10) in position on the HPC front case boss (20) and the bracket.
(n) Apply graphite grease (Material No.CP2101) on the bolts (40), the threads and the friction surfaces.
(o) Install the bolts (40) on the 4th-stage inlet of the HPTACC valve (10) and the HPC front case boss (20).
(p) Install the bolts (50) and (60) that attach the HPTACC valve (10) to the bracket.
(q) Lubricate the threads of the bolts (40) with graphite grease (Material No.CP2101) :
.
(2) Install the 9th-stage air-inlet tube on the HPTACC valve as follows:
(a) Remove the blanking plugs from the inlet of the 9th-stage port of the HPTACC valve (10) and the outlet of the 9th-stage air-tube (70).
(b) Put the new AIPC 75-21-10-01-060 GASKET (90) in position on the inlet of the 9th-stage port of the HPTACC valve (10) and the 9th-stage air tube (70).
(c) Install the bolts (80) manually to safety the inlet of the 9th-stage port of the HPTACC valve (10) and the 9th-stage air tube (70).
(3) Install the fuel manifold to the HPTACC valve as follows:
(a) Remove the blanking plugs from the inlet port of the HPTACC valve (10) and the fuel manifold (290).
(b) Put the new AIPC 75-21-10-01-150 GASKET (280) in position on the inlet port of the HPTACC valve (10) and the fuel manifold (290).
(c) Tighten the bolts (300) and (310) manually to assemble the fuel manifold (290) and the HPTACC valve (10).
(4) Install the 4th/9th stage air-outlet tube on the HPTACC valve as follows:
PRE SB 72-0846
(a) Remove the blanking plugs from the 4th-stage outlet ports of the HPTACC valve (10) and the outlet port of the 9th-stage elbow (120).
(b) Remove the blanking plugs from the 4th-stage outlet ports of the HPTACC valve (10) and the outlet port of the 9th-stage elbow (140).
(c) Put the new AIPC 75-21-10-01-100 ORIFICE PLATE (150) between two AIPC 75-21-10-01-090 GASKETS (155). Then, put this assembly between the outlet side of the 9th stage of the air outlet elbow (120) and the 4th/9th-stage air-outlet tube (140).
(d) Install the bolts (160) and the nuts (130) manually.
(e) Install the new AIPC 75-21-10-01-120 SEAL RING (170) to the 4th-stage outlet of the HPTACC (10) and the 4th/9th stage air-outlet tube (140).
(f) Safety the 4th-stage outlet of the HPTACC (10) and the 4th/9th stage air-outlet tube (140) with the V-band clamp (190).
(g) Tighten the nut (180) of the V-band clamp (190) manually.
END OF PRE SB 72-0846
POST SB 72-0846
(5) Install the HPTCC manifold outlet-tube on the HPTACC valve as follows:
(a) Install the new AIPC 75-21-10-01-120 SEAL RING (170) to the 4th-stage outlet of the HPTACC (10) and the HPTCC manifold outlet-tube (2480M87G01).
(b) Attach the 4th-stage outlet of the HPTACC (10) and the HPTCC Manifold outlet-tube (2480M87G01) with the V-band clamp (190).
(c) Tighten the nut (180) of the V-band clamp (190) manually.
END OF POST SB 72-0846
(6) Tighten the bolts as follows:
(a) TORQUE the bolts (300) and (310) of the fuel manifold (290) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
.
(b) TORQUE the nut (180) of the V-band clamp (190) to between 85 and 70 lbf.in (0.96 and 0.79 m.daN )
.
PRE SB 72-0846
(c) TORQUE the bolts (160) on the outlet side of the 9th-stage air-outlet elbow (120) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
END OF PRE SB 72-0846
(d) TORQUE the bolts (80) of the 9th-stage air tube (70) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
PRE SB 72-0846
(e) TORQUE the bolts (210) of the retaining strap (200) of the 9th-stage air-outlet tube (140) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
END OF PRE SB 72-0846
POST SB 72-0846
(f) TORQUE the bolts (210) of the retaining strap (200) of the HPTCC manifold outlet tube (2480M87G01) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
.
END OF POST SB 72-0846
(g) TORQUE the bolts (220) of the loop clamp (230) of the 9th-stage air tube (70) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
(7) Connect the electrical connectors as follows:
(a) Remove the blanking caps from the electrical connectors, Channel A (260) and Channel B (250).
(b) Remove the blanking caps from the electrical connectors, Channel A (270) and Channel B (240) of the HPTACC valve (10).
(c) Connect the electrical connectors:
Subtask 75-21-10-410-056-A ** ON A/C NOT FOR ALL (1) Install the HPTACC valve on the HPC front case boss as follows:
(a) Clean the component interface and/or the adjacent area.
(b) Do a visual inspection of the component interface and/or the adjacent area.
PRE SB 72-0846
(c) Remove the blanking plugs from:
- The 9th-stage outlet port of the HPTACC valve (10)
- The 9th-stage air outlet elbow (120)
(e) Install the bolts (110) to assemble the 9th-stage outlet port of the HPTACC valve (10) and the 9th-stage air outlet elbow (120).
(f) TORQUE the bolts (110) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
. END OF PRE SB 72-0846
POST SB 72-0846
(g) Remove the PLUG - BLANKING from:
- The High-Pressure Turbine Clearance Control (HPTCC) manifold outlet-port of the HPTACC valve (10)
- The HPTCC manifold outlet (2480M87G01)
(i) Install the bolts (110) to assemble the HPTCC manifold outlet-port of the HPTACC valve (10) and the HPTCC manifold outlet (2480M87G01).
(j) TORQUE the bolts (110) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
. END OF POST SB 72-0846
(k) Remove the blanking plug from the HPC front case boss (20) and the 4th-stage inlet of the HPTACC (10).
(l) Put the new AIPC 75-21-10-01-020 GASKET (30) in position on the HPC front case boss (20).
(m) Put the HPTACC valve (10) in position on the HPC front case boss (20) and the bracket.
(n) Apply graphite grease (Material No.CP2101) on the bolts (40), the threads and the friction surfaces.
(o) Install the bolts (40) on the 4th-stage inlet of the HPTACC valve (10) and the HPC front case boss (20).
(p) Install the bolts (50) and (60) that attach the HPTACC valve (10) to the bracket.
(q) Lubricate the threads of the bolts (40) with graphite grease (Material No.CP2101) :
- TORQUE the bolts (40) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
. Install orCP8001 lockwire 0.032 in. (0.8 mm) dia. .CP8002 lockwire 0.032 in. (0.8 mm) dia
. (2) Install the 9th-stage air-inlet tube on the HPTACC valve as follows:
(a) Remove the blanking plugs from the inlet of the 9th-stage port of the HPTACC valve (10) and the outlet of the 9th-stage air-tube (70).
(b) Put the new AIPC 75-21-10-01-060 GASKET (90) in position on the inlet of the 9th-stage port of the HPTACC valve (10) and the 9th-stage air tube (70).
(c) Install the bolts (80) manually to safety the inlet of the 9th-stage port of the HPTACC valve (10) and the 9th-stage air tube (70).
(3) Install the fuel manifold to the HPTACC valve as follows:
(a) Remove the blanking plugs from the inlet port of the HPTACC valve (10) and the fuel manifold (290).
(b) Put the new AIPC 75-21-10-01-150 GASKET (280) in position on the inlet port of the HPTACC valve (10) and the fuel manifold (290).
(c) Tighten the bolts (300) and (310) manually to assemble the fuel manifold (290) and the HPTACC valve (10).
(4) Install the 4th/9th stage air-outlet tube on the HPTACC valve as follows:
PRE SB 72-0846
(a) Remove the blanking plugs from the 4th-stage outlet ports of the HPTACC valve (10) and the outlet port of the 9th-stage elbow (120).
(b) Remove the blanking plugs from the 4th-stage outlet ports of the HPTACC valve (10) and the outlet port of the 9th-stage elbow (140).
(c) Put the new AIPC 75-21-10-01-100 ORIFICE PLATE (150) between two AIPC 75-21-10-01-090 GASKETS (155). Then, put this assembly between the outlet side of the 9th stage of the air outlet elbow (120) and the 4th/9th-stage air-outlet tube (140).
(d) Install the bolts (160) and the nuts (130) manually.
(e) Install the new AIPC 75-21-10-01-120 SEAL RING (170) to the 4th-stage outlet of the HPTACC (10) and the 4th/9th stage air-outlet tube (140).
(f) Safety the 4th-stage outlet of the HPTACC (10) and the 4th/9th stage air-outlet tube (140) with the V-band clamp (190).
(g) Tighten the nut (180) of the V-band clamp (190) manually.
END OF PRE SB 72-0846
POST SB 72-0846
(5) Install the HPTCC manifold outlet-tube on the HPTACC valve as follows:
(a) Install the new AIPC 75-21-10-01-120 SEAL RING (170) to the 4th-stage outlet of the HPTACC (10) and the HPTCC manifold outlet-tube (2480M87G01).
(b) Attach the 4th-stage outlet of the HPTACC (10) and the HPTCC Manifold outlet-tube (2480M87G01) with the V-band clamp (190).
(c) Tighten the nut (180) of the V-band clamp (190) manually.
END OF POST SB 72-0846
(6) Tighten the bolts as follows:
(a) TORQUE the bolts (300) and (310) of the fuel manifold (290) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
. (b) TORQUE the nut (180) of the V-band clamp (190) to between 85 and 70 lbf.in (0.96 and 0.79 m.daN )
. PRE SB 72-0846
(c) TORQUE the bolts (160) on the outlet side of the 9th-stage air-outlet elbow (120) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )

END OF PRE SB 72-0846
(d) TORQUE the bolts (80) of the 9th-stage air tube (70) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )

PRE SB 72-0846
(e) TORQUE the bolts (210) of the retaining strap (200) of the 9th-stage air-outlet tube (140) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )

END OF PRE SB 72-0846
POST SB 72-0846
(f) TORQUE the bolts (210) of the retaining strap (200) of the HPTCC manifold outlet tube (2480M87G01) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
. END OF POST SB 72-0846
(g) TORQUE the bolts (220) of the loop clamp (230) of the 9th-stage air tube (70) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )

(7) Connect the electrical connectors as follows:
(a) Remove the blanking caps from the electrical connectors, Channel A (260) and Channel B (250).
(b) Remove the blanking caps from the electrical connectors, Channel A (270) and Channel B (240) of the HPTACC valve (10).
(c) Connect the electrical connectors:
- Channel A (260) and Channel B (250) to electrical connectors
- Channel A (270) and Channel B (240) of the HPTACC valve (10)
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the right thrust reverser door: (Ref. AMM TASK 78-36-00-410-040).
(a) FOR [1000EM1] (ENGINE-1)
452AR
(b) FOR [1000EM2] (ENGINE-2)
462AR
Subtask 75-21-10-440-052-A ** ON A/C NOT FOR ALL Subtask 75-21-10-861-051-A ** ON A/C NOT FOR ALL Subtask 75-21-10-869-052-A ** ON A/C NOT FOR ALL Subtask 75-21-10-865-055-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the right thrust reverser door: (Ref. AMM TASK 78-36-00-410-040).
(a) FOR [1000EM1] (ENGINE-1)
452AR
(b) FOR [1000EM2] (ENGINE-2)
462AR
F. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 75-21-10-710-051-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 1000EM1 (ENGINE1) | |||
| 49VU | FUEL/LP VALVE/MOT1/ENG1 | 1QG | A08 |
| 121VU | FUEL/LP VALVE/MOT2/ENG1 | 3QG | M25 |
| FOR FIN: 1000EM2 (ENGINE2) | |||
| 49VU | FUEL/LP VALVE/MOT1/ENG2 | 2QG | A09 |
| 121VU | FUEL/LP VALVE/MOT2/ENG2 | 4QG | M26 |
G. Do this Test:
(1) Do an operational test of the FADEC on the ground (with engine motoring) (Ref. AMM TASK 73-29-00-710-040)
(2) Do a minimum idle check for leaks (Ref. AMM TASK 71-00-00-710-006). Make sure that on the CFDS no fault is shown related to the HPTACC.
Subtask 75-21-10-862-051-A ** ON A/C NOT FOR ALL 5. Close-up(1) Do an operational test of the FADEC on the ground (with engine motoring) (Ref. AMM TASK 73-29-00-710-040)
(2) Do a minimum idle check for leaks (Ref. AMM TASK 71-00-00-710-006). Make sure that on the CFDS no fault is shown related to the HPTACC.
Subtask 75-21-10-869-053-A ** ON A/C NOT FOR ALL Subtask 75-21-10-410-057-A ** ON A/C NOT FOR ALL
HPTACC Valve Location