Pressurization of the Bleed System through the HP Ground Connector
TASK 36-12-00-860-806-A
Pressurization of the Bleed System through the HP Ground Connector
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 36-12-00-941-057-A
Subtask 36-12-00-860-086-A
Subtask 36-12-00-410-060-A
[Rev.10 from 2021]
2026.04.01 12:38:02 UTC
Pressurization of the Bleed System through the HP Ground Connector
WARNING:
MAKE SURE THAT THE FWD AVIONICS ACCESS DOOR 811 IS OPEN WITH A WARNING PLACARD ATTACHED TO IT.
THE WARNING NOTICE MUST TELL PERSONS NOT TO CLOSE THE DOOR. THIS PREVENTS ACCIDENTAL PRESSURIZATION OF THE AIRCRAFT.
CAUTION:
MAKE SURE THAT THE GROUND AIR-SUPPLY UNIT IS NOT TOO NEAR THE AIRCRAFT AND THAT THE ENGINE EXHAUST PIPE OF THE GROUND AIR- SUPPLY UNIT POINTS AWAY FROM THE AIRCRAFT. HEAT FROM THIS UNIT AND FROM THE EXHAUST CAN CAUSE DAMAGE TO THE AIRCRAFT STRUCTURE.
CAUTION:
MAKE SURE THAT THE GROUND-AIR SUPPLY IS FREE FROM OIL CONTAMINATION. OIL CONTAMINATION CAN CAUSE THE SMELL OF OIL IN THE CABIN AND MAKE THE AIR-CONDITIONING PACKS UNSERVICEABLE.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | GROUND AIR-SUPPLY UNIT(HIGH PRESSURE) |
| No specific | 1 | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 191DB, 811 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 52-41-00-010-002-A | Open the Avionics Compartment Doors for Access |
| TASK 52-41-00-410-002-A | Close the Avionics Compartment Doors after Access |
Subtask 36-12-00-941-057-A
A. Safety Precautions
(1) When you operate the air conditioning system, make sure that access door 811 is open (Ref. AMM TASK 52-41-00-010-002).
(2) Put a WARNING NOTICE(S) in position on access door 811 to tell persons not to close it.
Subtask 36-12-00-860-085-A (1) When you operate the air conditioning system, make sure that access door 811 is open (Ref. AMM TASK 52-41-00-010-002).
(2) Put a WARNING NOTICE(S) in position on access door 811 to tell persons not to close it.
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(3) On AIR COND overhead panel 30VU:
Subtask 36-12-00-865-072-A (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(3) On AIR COND overhead panel 30VU:
- Release the PACK 1 and PACK 2 pushbutton switches (the OFF legends come on).
- Make sure that the X-bleed selector switch is in the AUTO position.
C. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 36-12-00-010-060-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | APU/APU/CTL | 2KD | L42 |
| 121VU | APU/ECB/SPLY | 1KD | L41 |
| 122VU | AIR BLEED/X FEED VALVE/NORM | 1HV | Z20 |
D. Get Access
(1) Open access door 191DB.
(2) Connect the GROUND AIR-SUPPLY UNIT(HIGH PRESSURE) to the aircraft HP ground-connector.
4. Procedure(1) Open access door 191DB.
(2) Connect the GROUND AIR-SUPPLY UNIT(HIGH PRESSURE) to the aircraft HP ground-connector.
Subtask 36-12-00-860-086-A
A. Pressurization of the Bleed System through the HP Ground Connector
(1) Start the ground air-supply unit and make sure that:
(3) On the AIR BLEED page of the lower ECAM DU:
5. Close-up(1) Start the ground air-supply unit and make sure that:
- The airflow is between 54 kg.min (119.0496 lb.min) and 78 kg.min (171.9605 lb.min).
- The supplied air pressure is not more than 60 psi (4.14 bar).
- The supplied air temperature is not more than 260 deg.C (500.00 deg.F).
(3) On the AIR BLEED page of the lower ECAM DU:
- Make sure that all the indications shown are normal (green indications).
Subtask 36-12-00-410-060-A
A. Close Access
(1) Disconnect the GROUND AIR-SUPPLY UNIT(HIGH PRESSURE) from the aircraft HP ground-connector.
(2) Close access door 191DB.
Subtask 36-12-00-860-087-A (1) Disconnect the GROUND AIR-SUPPLY UNIT(HIGH PRESSURE) from the aircraft HP ground-connector.
(2) Close access door 191DB.
B. Aircraft Maintenance Configuration
(1) On AIR COND overhead panel 30VU:
(3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Subtask 36-12-00-942-057-A (1) On AIR COND overhead panel 30VU:
- Push the PACK 1 and PACK 2 pushbutton switches (the OFF legends go off).
- Make sure that the X-BLEED selector switch is in the AUTO position.
(3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
C. Put the aircraft back to its initial configuration.
(1) Remove the WARNING NOTICE(S).
(2) Close access door 811 (Ref. AMM TASK 52-41-00-410-002).
(3) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Remove the WARNING NOTICE(S).
(2) Close access door 811 (Ref. AMM TASK 52-41-00-410-002).
(3) Remove the ground support and maintenance equipment, the special and standard tools and all other items.