WARNING: MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING: BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
WARNING: YOU MUST NOT TOUCH HOT PARTS WITHOUT APPLICABLE GLOVES. HOT PARTS CAN CAUSE AN INJURY.
WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION: BE VERY CAREFUL WHEN YOU DO WORK ON OR NEAR THE AIR-CONDITIONING DUCTS. THE DUCTS ARE MADE OF THIN MATERIAL AND YOU CAN EASILY BREAK THEM.
ZONE: 410
ZONE: 420
ZONE: 472
ZONE: 482
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
No specific
AR
PLUG - BLANKING
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft ) T
98D27803000000
1
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
98L12003001000
1
HARNESS,SAFETY
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
410
ENG 1 PYLON BOX AND FORWARD FAIRING
420
ENG 2 PYLON BOX AND FORWARD FAIRING
472
PYLON LEADING EDGE
482
PYLON LEADING EDGE
191DB
FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
413ET, 472AR
FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
423ET, 424CR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 12-00-00-481-002-A
Installation of the Wingrip
TASK 20-23-22-910-001-A
Marking of the Unions after Application of Standard or Specific Tightening Torque
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 27-00-00-480-002-A
Installation of the Flap/Slat Control-Lever Locking Tool (98D27803000000)
TASK 36-12-00-860-805-A
Pressurization of the Bleed System with the APU
TASK 36-12-00-860-806-A
Pressurization of the Bleed System through the HP Ground Connector
TASK 36-22-00-790-803-A
Leak Check on all the Bleed Air Ducts and the Pack Components
TASK 49-00-00-860-009-A
APU Shutdown by External Power (131-9(A))
TASK 49-00-00-860-009-A-01
APU Shutdown by Batteries (131-9(A))
TASK 54-53-11-000-806-A
Removal of the Pylon-to-Wing Access Panels and Doors
TASK 54-53-11-400-806-A
Installation of the Pylon-to-Wing Access Panels and Doors
3. Job Set-up
Subtask 36-11-49-861-128-A
A. Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
Subtask 36-11-49-941-147-A
B. Safety Precautions
   (1) Make sure that the engine 1(2) shutdown occurred not less than five minutes before you do this procedure.
   (2) On AIR COND panel 30VU:
     (a) Make sure that the ENG 1(2) BLEED pushbutton switch is released (OFF legend on).
     (b) Make sure that the APU BLEED pushbutton switch is released (ON legend off).
     (c) Make sure that the WARNING NOTICE(S) is in position to tell persons not to operate the pneumatic system.
   (3) On the center pedestal, on ENG panel 115VU:
     (a) Make sure that the ENG/MODE selector switch is in the NORM position.
     (b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
     (c) Make sure that the WARNING NOTICE(S) are in position to tell persons not to operate:
  • The ENG/MODE selector switch, and
  • The ENG/MASTER 1(2) control switch.
   (4) On the ENG section of maintenance panel 50VU:
     (a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
     (b) Make sure that the WARNING NOTICE(S) is in position to tell persons not to energize FADEC 1(2).
   (5) On access door 191DB, on the HP ground connector:
     (a) Make sure that the WARNING NOTICE(S) is in position to tell persons not to pressurize the pneumatic system.
   (6) On FLAPS panel 114VU:
  • Make sure that the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is in position on the flap/slat control lever (Ref. AMM TASK 27-00-00-480-002).
  • Make sure that the WARNING NOTICE(S) is in position on the flap/slat control lever to tell persons not to operate the flap/slat controls.
   (7) Put on and attach a 98L12003001000 HARNESS,SAFETY before you start work in the work area (Ref. AMM TASK 12-00-00-481-002).
Subtask 36-11-49-865-229-A
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
FOR FIN: 4020KM1 (POWER PLANTDEMOUNTABLE, ENGINE 1)
49VUAIR BLEED/ENG 1/CTL2HA1D11
122VUAIR BLEED/ENG 1/MONG3HA1Z23
FOR FIN: 4020KM2 (POWER PLANTDEMOUNTABLE, ENGINE 2)
49VUAIR BLEED/ENG 2/MONG3HA2D12
122VUAIR BLEED/ENG 2/CTL2HA2Z22
Subtask 36-11-49-010-290-A
D. Get Access
   (1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at the pylon access panels.
   (2) Make sure that these access panels are removed (Ref. AMM TASK 54-53-11-000-806):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
413ET 472AR
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
423ET 424CR
Subtask 36-11-49-020-170-A
E. Removal of the Component
   (1) Make sure that the thermal blanket (13) is removed from the bleed-air precooler exchanger (10).
   (2) Make sure that the six clamps (3) and the three electrical harnesses (5) are disengaged from the support (4), if necessary.
4. Procedure
Subtask 36-11-49-420-155-A
A. Installation of the Upper Sense Line between the Bleed-Air Precooler Exchanger (Downstream) and the Pylon Interface
   (1) If you use the APU to energize the electrical circuits, stop the APU:
   (2) In the cockpit, on the SD bleed page:
     (a) Make sure that the pressure and the temperature of the bleed-air duct system are in ambient conditions.
WARNING: MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING: DO NOT TOUCH THE UNIT UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
   (3) Remove the PLUG-BLANKING from each disconnected line end.
   (4) Remove the PLUG - BLANKING from the port of the bleed-air precooler exchanger (10) and from the port of the lower sense line (15).
   (5) Do an inspection of the component interfaces and the adjacent area.
   (6) Clean the component interfaces and the adjacent area.
   (7) Install the upper sense line (12) in the correct position between the bleed-air precooler exchanger (10) and the lower sense line (15).
   (8) Install the clamp (7) with the upper sense line (12) as follows:
     (a) Install the clamp (7) with the upper sense line (12) on the support (6).
     (b) Install the washer (8) and the bolt (9).
     (c) Tighten the bolt (9).
   (9) Torque the union nut (11):
WARNING: TIGHTEN THE UNION(S) TO THE CORRECT TORQUE VALUE. IF YOU DO NOT TIGHTEN THEM SUFFICIENTLY, HOT AIR LEAKAGE CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
     (a) TORQUE the union nut (11) of the upper sense line (12) to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft ) T.
     (b) Identify the tightened union nut (11) of the upper sense line (12) with a red line (
Ref. AMM TASK 20-23-22-910-001).
   (10) Tighten the union nut (14) of the upper sense line (12).
   (11) Identify the tightened union nut (14) of the upper sense line (12) with a red line (Ref. AMM TASK 20-23-22-910-001).
Subtask 36-11-49-865-230-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
FOR FIN: 4020KM1 (POWER PLANTDEMOUNTABLE, ENGINE 1)
49VUAIR BLEED/ENG 1/CTL2HA1D11
122VUAIR BLEED/ENG 1/MONG3HA1Z23
FOR FIN: 4020KM2 (POWER PLANTDEMOUNTABLE, ENGINE 2)
49VUAIR BLEED/ENG 2/MONG3HA2D12
122VUAIR BLEED/ENG 2/CTL2HA2Z22
Subtask 36-11-49-480-092-A
C. Prepare for the Leak Test on the Connections of the Upper Sense Line
   (1) Use the soap solution procedure or the aluminum foil procedure (Ref. AMM TASK 36-22-00-790-803).
Subtask 36-11-49-790-063-A
D. Leak Test
   (1) Pressurize the bleed system through the HP ground connector (Ref. AMM TASK 36-12-00-860-806) or with the APU (Ref. AMM TASK 36-12-00-860-805).
     (a) Make sure that there are no leaks at the sense line connections (Ref. AMM TASK 36-22-00-790-803).
   (2) Remove the materials that you used to do the leak test on the upper sense line (12) connections.
Subtask 36-11-49-420-164-A
E. Installation of the components
   (1) Install the three electrical harnesses (5), if disengaged:
     (a) Install the three electrical harnesses (5) on the support (4).
     (b) Install the six washers (2) and the six bolts (1) in the six clamps (3).
     (c) Tighten the six bolts (1).
   (2) Install the thermal blanket (13) on the bleed precooler exchanger (10).
5. Close-up
Subtask 36-11-49-410-219-A
A. Close Access
   (1) Put the aircraft back to its initial configuration.
   (2) Make sure that the work area is clean and clear of tools and other items.
   (3) Install these access panels (Ref. AMM TASK 54-53-11-400-806):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
413ET 472AR
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
423ET 424CR
   (4) Remove the access platform(s).
   (5) Remove the WARNING NOTICE(S).
Subtask 36-11-49-862-120-A
B. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002) or (Ref. AMM TASK 24-41-00-862-002).