Installation of the Upper Sense Line between the Bleed-Air Precooler Exchanger (Downstream) and the Fan Air-Valve Actuator
TASK 36-11-49-400-835-A
Installation of the Upper Sense Line between the Bleed-Air Precooler Exchanger (Downstream) and the Fan Air-Valve Actuator
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 36-11-49-861-128-A
Subtask 36-11-49-420-155-A
Subtask 36-11-49-410-219-A
[Rev.10 from 2021]
2026.04.01 01:11:57 UTC
Installation of the Upper Sense Line between the Bleed-Air Precooler Exchanger (Downstream) and the Fan Air-Valve Actuator
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
WARNING:
YOU MUST NOT TOUCH HOT PARTS WITHOUT APPLICABLE GLOVES. HOT PARTS CAN CAUSE AN INJURY.
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION:
BE VERY CAREFUL WHEN YOU DO WORK ON OR NEAR THE AIR-CONDITIONING DUCTS. THE DUCTS ARE MADE OF THIN MATERIAL AND YOU CAN EASILY BREAK THEM.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft ) ![]() | |
| 98D27803000000 | 1 | LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION |
| 98L12003001000 | 1 | HARNESS,SAFETY |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 410 | ENG 1 PYLON BOX AND FORWARD FAIRING |
| 420 | ENG 2 PYLON BOX AND FORWARD FAIRING |
| 472 | PYLON LEADING EDGE |
| 482 | PYLON LEADING EDGE |
| 191DB | |
| FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1) | |
| 413ET, 472AR | |
| FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2) | |
| 423ET, 424CR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-00-00-481-002-A | Installation of the Wingrip |
| TASK 20-23-22-910-001-A | Marking of the Unions after Application of Standard or Specific Tightening Torque |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 27-00-00-480-002-A | Installation of the Flap/Slat Control-Lever Locking Tool (98D27803000000) |
| TASK 36-12-00-860-805-A | Pressurization of the Bleed System with the APU |
| TASK 36-12-00-860-806-A | Pressurization of the Bleed System through the HP Ground Connector |
| TASK 36-22-00-790-803-A | Leak Check on all the Bleed Air Ducts and the Pack Components |
| TASK 49-00-00-860-009-A | APU Shutdown by External Power (131-9(A)) |
| TASK 49-00-00-860-009-A-01 | APU Shutdown by Batteries (131-9(A)) |
| TASK 54-53-11-000-806-A | Removal of the Pylon-to-Wing Access Panels and Doors |
| TASK 54-53-11-400-806-A | Installation of the Pylon-to-Wing Access Panels and Doors |
Subtask 36-11-49-861-128-A
A. Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
Subtask 36-11-49-941-147-A (Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
B. Safety Precautions
(1) Make sure that the engine 1(2) shutdown occurred not less than five minutes before you do this procedure.
(2) On AIR COND panel 30VU:
(a) Make sure that the ENG 1(2) BLEED pushbutton switch is released (OFF legend on).
(b) Make sure that the APU BLEED pushbutton switch is released (ON legend off).
(c) Make sure that the WARNING NOTICE(S) is in position to tell persons not to operate the pneumatic system.
(3) On the center pedestal, on ENG panel 115VU:
(a) Make sure that the ENG/MODE selector switch is in the NORM position.
(b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
(c) Make sure that the WARNING NOTICE(S) are in position to tell persons not to operate:
(a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
(b) Make sure that the WARNING NOTICE(S) is in position to tell persons not to energize FADEC 1(2).
(5) On access door 191DB, on the HP ground connector:
(a) Make sure that the WARNING NOTICE(S) is in position to tell persons not to pressurize the pneumatic system.
(6) On FLAPS panel 114VU:
Subtask 36-11-49-865-229-A (1) Make sure that the engine 1(2) shutdown occurred not less than five minutes before you do this procedure.
(2) On AIR COND panel 30VU:
(a) Make sure that the ENG 1(2) BLEED pushbutton switch is released (OFF legend on).
(b) Make sure that the APU BLEED pushbutton switch is released (ON legend off).
(c) Make sure that the WARNING NOTICE(S) is in position to tell persons not to operate the pneumatic system.
(3) On the center pedestal, on ENG panel 115VU:
(a) Make sure that the ENG/MODE selector switch is in the NORM position.
(b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
(c) Make sure that the WARNING NOTICE(S) are in position to tell persons not to operate:
- The ENG/MODE selector switch, and
- The ENG/MASTER 1(2) control switch.
(a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
(b) Make sure that the WARNING NOTICE(S) is in position to tell persons not to energize FADEC 1(2).
(5) On access door 191DB, on the HP ground connector:
(a) Make sure that the WARNING NOTICE(S) is in position to tell persons not to pressurize the pneumatic system.
(6) On FLAPS panel 114VU:
- Make sure that the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is in position on the flap/slat control lever (Ref. AMM TASK 27-00-00-480-002).
- Make sure that the WARNING NOTICE(S) is in position on the flap/slat control lever to tell persons not to operate the flap/slat controls.
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 36-11-49-010-290-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| FOR FIN: 4020KM1 (POWER PLANTDEMOUNTABLE, ENGINE 1) | |||
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| FOR FIN: 4020KM2 (POWER PLANTDEMOUNTABLE, ENGINE 2) | |||
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
D. Get Access
(1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at the pylon access panels.
(2) Make sure that these access panels are removed (Ref. AMM TASK 54-53-11-000-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
413ET 472AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
423ET 424CR
Subtask 36-11-49-020-170-A (1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at the pylon access panels.
(2) Make sure that these access panels are removed (Ref. AMM TASK 54-53-11-000-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
413ET 472AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
423ET 424CR
E. Removal of the Component
(1) Make sure that the thermal blanket (13) is removed from the bleed-air precooler exchanger (10).
(2) Make sure that the six clamps (3) and the three electrical harnesses (5) are disengaged from the support (4), if necessary.
4. Procedure(1) Make sure that the thermal blanket (13) is removed from the bleed-air precooler exchanger (10).
(2) Make sure that the six clamps (3) and the three electrical harnesses (5) are disengaged from the support (4), if necessary.
Subtask 36-11-49-420-155-A
A. Installation of the Upper Sense Line between the Bleed-Air Precooler Exchanger (Downstream) and the Pylon Interface
(1) If you use the APU to energize the electrical circuits, stop the APU:
(a) Make sure that the pressure and the temperature of the bleed-air duct system are in ambient conditions.
(4) Remove the PLUG - BLANKING from the port of the bleed-air precooler exchanger (10) and from the port of the lower sense line (15).
(5) Do an inspection of the component interfaces and the adjacent area.
(6) Clean the component interfaces and the adjacent area.
(7) Install the upper sense line (12) in the correct position between the bleed-air precooler exchanger (10) and the lower sense line (15).
(8) Install the clamp (7) with the upper sense line (12) as follows:
(a) Install the clamp (7) with the upper sense line (12) on the support (6).
(b) Install the washer (8) and the bolt (9).
(c) Tighten the bolt (9).
(9) Torque the union nut (11):
.
(b) Identify the tightened union nut (11) of the upper sense line (12) with a red line (Ref. AMM TASK 20-23-22-910-001).
(10) Tighten the union nut (14) of the upper sense line (12).
(11) Identify the tightened union nut (14) of the upper sense line (12) with a red line (Ref. AMM TASK 20-23-22-910-001).
Subtask 36-11-49-865-230-A (1) If you use the APU to energize the electrical circuits, stop the APU:
- For GTCP 36-300 APU (Ref. AMM D/O 49-00-00-86)
- For APS 3200 APU (Ref. AMM D/O 49-00-00-86)
- For 131-9(A) APU (Ref. AMM TASK 49-00-00-860-009).
(a) Make sure that the pressure and the temperature of the bleed-air duct system are in ambient conditions.
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE UNIT UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
(3) Remove the PLUG-BLANKING from each disconnected line end.(4) Remove the PLUG - BLANKING from the port of the bleed-air precooler exchanger (10) and from the port of the lower sense line (15).
(5) Do an inspection of the component interfaces and the adjacent area.
(6) Clean the component interfaces and the adjacent area.
(7) Install the upper sense line (12) in the correct position between the bleed-air precooler exchanger (10) and the lower sense line (15).
(8) Install the clamp (7) with the upper sense line (12) as follows:
(a) Install the clamp (7) with the upper sense line (12) on the support (6).
(b) Install the washer (8) and the bolt (9).
(c) Tighten the bolt (9).
(9) Torque the union nut (11):
WARNING:
TIGHTEN THE UNION(S) TO THE CORRECT TORQUE VALUE. IF YOU DO NOT TIGHTEN THEM SUFFICIENTLY, HOT AIR LEAKAGE CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
(a) TORQUE the union nut (11) of the upper sense line (12) to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft )
. (b) Identify the tightened union nut (11) of the upper sense line (12) with a red line (Ref. AMM TASK 20-23-22-910-001).
(10) Tighten the union nut (14) of the upper sense line (12).
(11) Identify the tightened union nut (14) of the upper sense line (12) with a red line (Ref. AMM TASK 20-23-22-910-001).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 36-11-49-480-092-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| FOR FIN: 4020KM1 (POWER PLANTDEMOUNTABLE, ENGINE 1) | |||
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| FOR FIN: 4020KM2 (POWER PLANTDEMOUNTABLE, ENGINE 2) | |||
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
C. Prepare for the Leak Test on the Connections of the Upper Sense Line
(1) Use the soap solution procedure or the aluminum foil procedure (Ref. AMM TASK 36-22-00-790-803).
Subtask 36-11-49-790-063-A (1) Use the soap solution procedure or the aluminum foil procedure (Ref. AMM TASK 36-22-00-790-803).
D. Leak Test
(1) Pressurize the bleed system through the HP ground connector (Ref. AMM TASK 36-12-00-860-806) or with the APU (Ref. AMM TASK 36-12-00-860-805).
(a) Make sure that there are no leaks at the sense line connections (Ref. AMM TASK 36-22-00-790-803).
(2) Remove the materials that you used to do the leak test on the upper sense line (12) connections.
Subtask 36-11-49-420-164-A (1) Pressurize the bleed system through the HP ground connector (Ref. AMM TASK 36-12-00-860-806) or with the APU (Ref. AMM TASK 36-12-00-860-805).
(a) Make sure that there are no leaks at the sense line connections (Ref. AMM TASK 36-22-00-790-803).
(2) Remove the materials that you used to do the leak test on the upper sense line (12) connections.
E. Installation of the components
(1) Install the three electrical harnesses (5), if disengaged:
(a) Install the three electrical harnesses (5) on the support (4).
(b) Install the six washers (2) and the six bolts (1) in the six clamps (3).
(c) Tighten the six bolts (1).
(2) Install the thermal blanket (13) on the bleed precooler exchanger (10).
5. Close-up(1) Install the three electrical harnesses (5), if disengaged:
(a) Install the three electrical harnesses (5) on the support (4).
(b) Install the six washers (2) and the six bolts (1) in the six clamps (3).
(c) Tighten the six bolts (1).
(2) Install the thermal blanket (13) on the bleed precooler exchanger (10).
Subtask 36-11-49-410-219-A
A. Close Access
(1) Put the aircraft back to its initial configuration.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Install these access panels (Ref. AMM TASK 54-53-11-400-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
413ET 472AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
423ET 424CR
(4) Remove the access platform(s).
(5) Remove the WARNING NOTICE(S).
Subtask 36-11-49-862-120-A (1) Put the aircraft back to its initial configuration.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Install these access panels (Ref. AMM TASK 54-53-11-400-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
413ET 472AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
423ET 424CR
(4) Remove the access platform(s).
(5) Remove the WARNING NOTICE(S).
B. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002) or (Ref. AMM TASK 24-41-00-862-002).
(Ref. AMM TASK 24-41-00-862-002) or (Ref. AMM TASK 24-41-00-862-002).
Sense Line between the Bleed-Air Precooler Exchanger (Downstream) and the Interface Pylon