W DOC AIRBUS | AMM A320F

Pressurization of the Bleed System through the HP Ground Connector


TASK 36-12-00-860-806-A
Pressurization of the Bleed System through the HP Ground Connector


WARNING: MAKE SURE THAT THE FWD AVIONICS ACCESS DOOR 811 IS OPEN WITH A WARNING PLACARD ATTACHED TO IT. THE WARNING NOTICE MUST TELL PERSONS NOT TO CLOSE THE DOOR. THIS PREVENTS ACCIDENTAL PRESSURIZATION OF THE AIRCRAFT.
CAUTION: MAKE SURE THAT THE GROUND AIR-SUPPLY UNIT IS NOT TOO NEAR THE AIRCRAFT AND THAT THE ENGINE EXHAUST PIPE OF THE GROUND AIR- SUPPLY UNIT POINTS AWAY FROM THE AIRCRAFT. HEAT FROM THIS UNIT AND FROM THE EXHAUST CAN CAUSE DAMAGE TO THE AIRCRAFT STRUCTURE.
CAUTION: MAKE SURE THAT THE GROUND-AIR SUPPLY IS FREE FROM OIL CONTAMINATION. OIL CONTAMINATION CAN CAUSE THE SMELL OF OIL IN THE CABIN AND MAKE THE AIR-CONDITIONING PACKS UNSERVICEABLE.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
GROUND AIR-SUPPLY UNIT(HIGH PRESSURE)
No specific
1
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
191DB, 811
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 31-60-00-860-001-A
EIS Start Procedure
TASK 31-60-00-860-002-A
EIS Stop Procedure
TASK 52-41-00-010-002-A
Open the Avionics Compartment Doors for Access
TASK 52-41-00-410-002-A
Close the Avionics Compartment Doors after Access
3. Job Set-up
Subtask 36-12-00-941-057-A
A. Safety Precautions
   (1) When you operate the air conditioning system, make sure that access door 811 is open (Ref. AMM TASK 52-41-00-010-002).
   (2) Put a WARNING NOTICE(S) in position on access door 811 to tell persons not to close it.
Subtask 36-12-00-860-085-A
B. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
   (2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
   (3) On AIR COND overhead panel 30VU:
  • Release the PACK 1 and PACK 2 pushbutton switches (the OFF legends come on).
  • Make sure that the X-bleed selector switch is in the AUTO position.
Subtask 36-12-00-865-072-A
C. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
122VUAIR BLEED/X FEED VALVE/NORM1HVZ20
Subtask 36-12-00-010-060-A
D. Get Access
   (1) Open access door 191DB.
   (2) Connect the GROUND AIR-SUPPLY UNIT(HIGH PRESSURE) to the aircraft HP ground-connector.
4. Procedure
Subtask 36-12-00-860-086-A
A. Pressurization of the Bleed System through the HP Ground Connector
   (1) Start the ground air-supply unit and make sure that:
  • The airflow is between 54 kg.min (119.0496 lb.min) and 78 kg.min (171.9605 lb.min).
  • The supplied air pressure is not more than 60 psi (4.14 bar).
  • The supplied air temperature is not more than 260 deg.C (500.00 deg.F).
   (2) On the ECAM control panel, push the BLEED key (the BLEED page comes into view).
   (3) On the AIR BLEED page of the lower ECAM DU:
  • Make sure that all the indications shown are normal (green indications).
   (4) When the pressurization of the bleed system is no longer necessary, stop the air supply.
5. Close-up
Subtask 36-12-00-410-060-A
A. Close Access
   (1) Disconnect the GROUND AIR-SUPPLY UNIT(HIGH PRESSURE) from the aircraft HP ground-connector.
   (2) Close access door 191DB.
Subtask 36-12-00-860-087-A
B. Aircraft Maintenance Configuration
   (1) On AIR COND overhead panel 30VU:
  • Push the PACK 1 and PACK 2 pushbutton switches (the OFF legends go off).
  • Make sure that the X-BLEED selector switch is in the AUTO position.
   (2) Do the EIS stop procedure (Upper ECAM DU and lower ECAM DU only) (Ref. AMM TASK 31-60-00-860-002).
   (3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Subtask 36-12-00-942-057-A
C. Put the aircraft back to its initial configuration.
   (1) Remove the WARNING NOTICE(S).
   (2) Close access door 811 (Ref. AMM TASK 52-41-00-410-002).
   (3) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
[Rev.10 from 2021] 2026.04.01 01:14:47 UTC