Installation of the Cabin Intercommunication Data System (CIDS) Data Converter
TASK 33-21-32-400-801-A
Installation of the Cabin Intercommunication Data System (CIDS) Data Converter
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 33-21-32-860-050-A ** ON A/C NOT FOR ALL
Subtask 33-21-32-420-050-A ** ON A/C NOT FOR ALL
Subtask 33-21-32-410-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:53:30 UTC
Installation of the Cabin Intercommunication Data System (CIDS) Data Converter
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | STEPLADDER 1.0 M (3.3 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 240 | MID PASSENGER COMPARTMENT |
| FOR [581LG] (CONVERTER-DATA) | |
| FOR [582LG] (CONVERTER-DATA) | |
| 241EC | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 25-23-41-000-001-A | Removal of the Ceiling Panels |
| TASK 33-21-00-710-001-A | Operational Test of the General Illumination |
| TASK 33-21-00-740-002-A | Bite Test of the General Illumination with the MCDU |
| FOR [581LG] (CONVERTER-DATA) | |
| FOR [582LG] (CONVERTER-DATA) | |
| TASK 25-23-41-400-001-A | Installation of the Ceiling Panels |
Subtask 33-21-32-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized
(Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the STEPLADDER 1.0 M (3.3 FT) is in the position below the related ceiling panel.
(3) Make sure that the related ceiling panel is removed (Ref. AMM TASK 25-23-41-000-001).
Subtask 33-21-32-865-051-A ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized
(Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the STEPLADDER 1.0 M (3.3 FT) is in the position below the related ceiling panel.
(3) Make sure that the related ceiling panel is removed (Ref. AMM TASK 25-23-41-000-001).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | LIGHT-HATRACK-STRIP | 312LG | J05 |
Subtask 33-21-32-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the CIDS Data Converter
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Install the CIDS data converter (2) on the clip (1).
(4) Make sure that the CIDS data converter (2) is engaged on the clip (1) correctly.
Subtask 33-21-32-865-052-A ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Install the CIDS data converter (2) on the clip (1).
(4) Make sure that the CIDS data converter (2) is engaged on the clip (1) correctly.
CAUTION:
MAKE SURE THAT THE ELECTRICAL CONNECTORS ARE CLEAN BEFORE YOU DISCONNECT OR CONNECT THEM. CONTAMINATION ON THE ELECTRICAL CONNECTORS CAN CAUSE DAMAGE TO EQUIPMENT.
(5) Connect the electrical connector (3).B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 33-21-32-710-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | LIGHT-HATRACK-STRIP | 312LG | J05 |
C. Test of the Underbin LED Light Strips and the Data Coverter(s):
(1) Do the BITE test of the general illumination with the MCDU (Ref. AMM TASK 33-21-00-740-002).
(2) Do the operational test of the scenario lighting from the Flight Attendant Panel (FAP) (Ref. AMM TASK 33-21-00-710-001).
5. Close-up(1) Do the BITE test of the general illumination with the MCDU (Ref. AMM TASK 33-21-00-740-002).
(2) Do the operational test of the scenario lighting from the Flight Attendant Panel (FAP) (Ref. AMM TASK 33-21-00-710-001).
Subtask 33-21-32-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the ceiling panel:
(a) FOR [581LG] (CONVERTER-DATA), [582LG] (CONVERTER-DATA)
Install 241EC (Ref. AMM TASK 25-23-41-400-001).
(3) Remove the STEPLADDER 1.0 M (3.3 FT).
Subtask 33-21-32-862-050-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the ceiling panel:
(a) FOR [581LG] (CONVERTER-DATA), [582LG] (CONVERTER-DATA)
Install 241EC (Ref. AMM TASK 25-23-41-400-001).
(3) Remove the STEPLADDER 1.0 M (3.3 FT).
CIDS Data Converter