Bite Test of the General Illumination with the MCDU
TASK 33-21-00-740-002-A
Bite Test of the General Illumination with the MCDU
1. Reason for the Job
To make sure that the general illumination operates correctly.
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 33-21-00-861-051-A ** ON A/C NOT FOR ALL
Subtask 33-21-00-740-050-A ** ON A/C NOT FOR ALL
Subtask 33-21-00-862-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:53:15 UTC
Bite Test of the General Illumination with the MCDU
1. Reason for the Job
To make sure that the general illumination operates correctly.
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 23-73-00-861-001-A | Energize the Cabin Intercommunication Data System (CIDS) |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-32-00-860-003-A | Procedure to Get Access to the SYSTEM REPORT/TEST/COM Page |
Subtask 33-21-00-861-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the Cabin Intercommunication Data System (CIDS) is energized
(Ref. AMM TASK 23-73-00-861-001).
(3) Procedure to get access to the SYSTEM REPORT/TEST/COM Page (Ref. AMM TASK 31-32-00-860-003).
Subtask 33-21-00-865-051-A ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the Cabin Intercommunication Data System (CIDS) is energized
(Ref. AMM TASK 23-73-00-861-001).
(3) Procedure to get access to the SYSTEM REPORT/TEST/COM Page (Ref. AMM TASK 31-32-00-860-003).
B. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | CAB LIGHT PWR-CEILING-AFT | 307LG | H08 |
| 2000VU | CAB LIGHT PWR-CEILING-AFT | 304LG | H07 |
| 2000VU | CAB LIGHT PWR-CEILING-FWD | 306LG | H06 |
| 2000VU | CAB LIGHT PWR-CEILING-FWD | 305LG | H05 |
| 2000VU | CAB LIGHT PWR-WINDOW-AFT | 302LG | H04 |
| 2000VU | CAB LIGHT PWR-WINDOW-AFT | 301LG | H03 |
| 2000VU | CAB LIGHT PWR-WINDOW-FWD | 303LG | H02 |
| 2000VU | CAB LIGHT PWR-WINDOW-FWD | 300LG | H01 |
| 2000VU | LIGHT-CABIN-ENTRY | 308LG | J02 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | LIGHT-HATRACK-STRIP | 312LG | J05 |
Subtask 33-21-00-740-050-A ** ON A/C NOT FOR ALL
A. BITE-test of the General Illumination on Multipurpose Control and Display Unit (MCDU) 3CA
(1) Do this test:
Subtask 33-21-00-740-050-B ** ON A/C NOT FOR ALL (1) Do this test:
| ACTION | RESULT |
|---|---|
| 1.On the MCDU: | On the MCDU screen: |
|
|
|
|
|
NOTE: It is necessary to wait for a minimum of two minutes between the two illumination tests. |
|
|
| | In the cabin:
|
| | On the MCDU screen:
|
|
|
A. BITE-test of the General Illumination on Multipurpose Control and Display Unit (MCDU) 3CA
(1) Do this test:
Subtask 33-21-00-740-050-C ** ON A/C NOT FOR ALL (1) Do this test:
| ACTION | RESULT |
|---|---|
| 1.On the MCDU: | On the MCDU screen: |
|
|
|
|
|
NOTE: It is necessary to wait for a minimum of two minutes between the two illumination tests. |
|
|
| | In the cabin:
|
| | On the MCDU screen:
|
|
|
A. BITE test of the General Illumination on Multipurpose Control and Display Unit (MCDU) 3CA
(1) Reset the CIDS.
(2) Do this test:
Subtask 33-21-00-740-050-GK ** ON A/C NOT FOR ALL (1) Reset the CIDS.
(2) Do this test:
| ACTION | RESULT |
|---|---|
| 1.On the MCDU: | On the MCDU screen: |
|
|
|
|
|
NOTE: It is necessary to wait for a minimum of two minutes between the two illumination tests. |
|
|
| | In the cabin:
|
| | On the MCDU screen:
|
|
|
A. BITE test of the General Illumination on Multipurpose Control and Display Unit (MCDU) 3CA
(1) Do this test:
5. Close-up(1) Do this test:
| ACTION | RESULT |
|---|---|
| 1.On the MCDU: | On the MCDU screen: |
|
|
|
|
|
NOTE: We recommend that you wait for a minimum of two minutes between the two illumination tests. |
|
|
| | In the cabin:
|
| | On the MCDU screen:
|
|
|
Subtask 33-21-00-862-051-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to the serviceable condition.
(1) On the MCDU, set the BRT knob to the OFF position.
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) On the MCDU, set the BRT knob to the OFF position.
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).