W DOC AIRBUS | AMM A320F

Installation of the Power Supply Unit (PSU)


TASK 33-21-31-400-801-B
Installation of the Power Supply Unit (PSU)


ZONE: 240
FIN: 572LG ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
STEPLADDER 1.0 M (3.3 FT)
No specific
Torque wrench: range to between 0.46 and 0.4 m.daN (40.71 and 35.40 lbf.in ) T
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
240
MID PASSENGER COMPARTMENT
FOR [572LG] (POWER SUPPLY UNIT)
241EC
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 20-28-00-912-803-A
Bonding Surface Preparation
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 25-23-41-000-001-A
Removal of the Ceiling Panels
TASK 33-21-00-710-001-A
Operational Test of the General Illumination
FOR [572LG] (POWER SUPPLY UNIT)
TASK 25-23-41-400-001-A
Installation of the Ceiling Panels
3. Job Set-up
Subtask 33-21-31-860-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the aircraft electrical circuits are energized
(Ref. AMM TASK 24-41-00-861-002).
   (2) Make sure that the STEPLADDER 1.0 M (3.3 FT) is in the position below the related ceiling panel.
   (3) Make sure that the related ceiling panel is removed (Ref. AMM TASK 25-23-41-000-001).
Subtask 33-21-31-865-053-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VULIGHT-HATRACK-STRIP312LGJ05
4. Procedure
Subtask 33-21-31-210-051-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Prepare the surface of the bonding point(s)
(Ref. AMM TASK 20-28-00-912-803).
Subtask 33-21-31-420-051-A ** ON A/C NOT FOR ALL
B. Installation of the PSU
   (1) Put the PSU (1) in position on its support.
   (2) Install the washers (2) and the screws (3).
   (3) Tighten the screws (3).
   (4) Install the bonding strap (6) and the nut (7).
   (5) TORQUE the nut (7) to between 0.46 and 0.4 m.daN (40.71 and 35.40 lbf.in ) T.
   (6) Give protection to the bonding point(s)
(
Ref. AMM TASK 20-28-00-912-802).
   (7) Remove the CAP-BLANKING from each electrical connector and receptacle.
CAUTION: MAKE SURE THAT THE BONDING STRAP(S) IS(ARE) CONNECTED BEFORE YOU CONNECT THE ELECTRICAL CONNECTOR(S).
CAUTION: MAKE SURE THAT THE ELECTRICAL CONNECTORS ARE CLEAN BEFORE YOU DISCONNECT OR CONNECT THEM. CONTAMINATION ON THE ELECTRICAL CONNECTORS CAN CAUSE DAMAGE TO EQUIPMENT.
CAUTION: REFER TO THE MATCH MARKS MADE DURING THE REMOVAL WHEN YOU CONNECT THE ELECTRICAL WIRES. INCORRECT CONNECTION OF THE WIRES WILL CAUSE DAMAGE TO EQUIPMENT.
   (8) Connect the electrical connectors (4) and (5) to the PSU (1).
Subtask 33-21-31-865-054-A ** ON A/C NOT FOR ALL
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VULIGHT-HATRACK-STRIP312LGJ05
Subtask 33-21-31-710-051-A ** ON A/C NOT FOR ALL
D. Operational Test
   (1) Do the test of the SCENARIO lighting from the Flight Attendant Panel (FAP) (Ref. AMM TASK 33-21-00-710-001):
     (a) Make sure that the underbin lights come on.
5. Close-up
Subtask 33-21-31-410-051-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the ceiling panel:
     (a) FOR [572LG] (POWER SUPPLY UNIT)
Install 241EC (Ref. AMM TASK 25-23-41-400-001).
   (3) Remove the STEPLADDER 1.0 M (3.3 FT).
Subtask 33-21-31-862-051-A ** ON A/C NOT FOR ALL
B. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.01 00:53:28 UTC