Installation of the Ballast Unit, the Lampholder and the Fluorescent Tube
TASK 33-21-11-400-001-A
Installation of the Ballast Unit, the Lampholder and the Fluorescent Tube
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 33-21-11-860-058-A ** ON A/C NOT FOR ALL Subtask 33-21-11-865-051-A ** ON A/C NOT FOR ALL
Subtask 33-21-11-910-051-A ** ON A/C NOT FOR ALL
Subtask 33-21-11-410-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:53:17 UTC
Installation of the Ballast Unit, the Lampholder and the Fluorescent Tube
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | TIE WRAP(S) |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 23-72-00-710-001-A | Operational Test of the Anti-Hijack Camera-Monitoring-System |
| TASK 23-73-00-861-001-A | Energize the Cabin Intercommunication Data System (CIDS) |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 25-23-41-400-001-A | Installation of the Ceiling Panels |
| TASK 25-23-42-400-001-A | Installation of the Ceiling Panels - Forward Utility Area |
| TASK 25-23-42-400-002-A | Installation of the Ceiling Panels - Aft Utility Area |
| TASK 25-23-48-400-001-A | Installation of the Cove Light Panel |
| TASK 33-21-00-710-001-A | Operational Test of the General Illumination |
| TASK 33-51-00-710-001-A | Operational Check of Emergency Power Supply Units by BITE-Check |
Subtask 33-21-11-860-058-A ** ON A/C NOT FOR ALL Subtask 33-21-11-865-051-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | CAB LIGHT PWR-CEILING-AFT | 307LG | H08 |
| 2000VU | CAB LIGHT PWR-CEILING-AFT | 304LG | H07 |
| 2000VU | CAB LIGHT PWR-CEILING-FWD | 306LG | H06 |
| 2000VU | CAB LIGHT PWR-CEILING-FWD | 305LG | H05 |
| 2000VU | CAB LIGHT PWR-WINDOW-AFT | 302LG | H04 |
| 2000VU | CAB LIGHT PWR-WINDOW-AFT | 301LG | H03 |
| 2000VU | CAB LIGHT PWR-WINDOW-FWD | 303LG | H02 |
| 2000VU | CAB LIGHT PWR-WINDOW-FWD | 300LG | H01 |
| 2000VU | LIGHT-CABIN-ENTRY | 308LG | J02 |
Subtask 33-21-11-910-051-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
(1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Clean the component interfaces and the adjacent area.
Subtask 33-21-11-420-050-A ** ON A/C NOT FOR ALL (1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Clean the component interfaces and the adjacent area.
B. Installation of the Ballast Unit with Lampholder and the Tube
(1) Installation of the ceiling and the entrance ballast unit and lampholder
(a) Install the ceiling and the entrance ballast unit and lampholder (6) to the fuselage structure with the washers (7) and the screws (8).
(b) Remove the CAP-BLANKING from each electrical connector and receptacle.
(c) Connect the electrical connector (3).
(2) Installation of the window ballast unit and lampholder
(a) Install the window ballast unit and lampholder (6) to the fuselage structure with the washers (4) and the screws (5).
(b) Remove the CAP-BLANKING from each electrical connector and receptacle.
(c) Connect the electrical connector (3).
(3) Installation of the tube
(a) Install the fluorescent tube (2) to the lampholder (6).
Subtask 33-21-11-420-050-B ** ON A/C NOT FOR ALL (1) Installation of the ceiling and the entrance ballast unit and lampholder
(a) Install the ceiling and the entrance ballast unit and lampholder (6) to the fuselage structure with the washers (7) and the screws (8).
(b) Remove the CAP-BLANKING from each electrical connector and receptacle.
(c) Connect the electrical connector (3).
(2) Installation of the window ballast unit and lampholder
(a) Install the window ballast unit and lampholder (6) to the fuselage structure with the washers (4) and the screws (5).
(b) Remove the CAP-BLANKING from each electrical connector and receptacle.
(c) Connect the electrical connector (3).
(3) Installation of the tube
(a) Install the fluorescent tube (2) to the lampholder (6).
B. Installation of the Advanced Integrated Ballast-Unit (AIBU) with Lampholder
(1) When you connect/install the components, refer to the match marks made during the removal procedure.
(2) Install the spacers (9) to the AIBU with lampholder (7).
Make sure you hear a click when the spacers (9) locks in the position.
(3) Put the AIBU with lampholder (7) in the correct position on the aircraft structure.
(4) If removed, put the reflector (6) in the correct position on the AIBU with lampholder (7).
(5) Install the washers (3) and the screws (4).
(7) Remove the CAP-BLANKING from each electrical connector and receptacle.
(8) Make sure that all the electrical connections are clean and in the correct condition.
(9) Connect the electrical connector (1) as identified during the removal procedure.
(10) If necessary, attach the electrical wire with TIE WRAP(S).
Subtask 33-21-11-865-052-A ** ON A/C NOT FOR ALL (1) When you connect/install the components, refer to the match marks made during the removal procedure.
(2) Install the spacers (9) to the AIBU with lampholder (7).
Make sure you hear a click when the spacers (9) locks in the position.
(3) Put the AIBU with lampholder (7) in the correct position on the aircraft structure.
(4) If removed, put the reflector (6) in the correct position on the AIBU with lampholder (7).
(5) Install the washers (3) and the screws (4).
CAUTION:
DO NOT TOUCH THE LAMP GLASS WITH YOUR FINGERS.
THE OILS FROM YOUR SKIN WILL QUICKLY CAUSE DETERIORATION OF THE LAMP.
IF YOU ACCIDENTALLY TOUCH THE LAMP GLASS, CLEAN IT WITH A LINT-FREE CLOTH.
(6) Install the fluorescent tube (5) in the lampholder (7). (7) Remove the CAP-BLANKING from each electrical connector and receptacle.
(8) Make sure that all the electrical connections are clean and in the correct condition.
(9) Connect the electrical connector (1) as identified during the removal procedure.
(10) If necessary, attach the electrical wire with TIE WRAP(S).
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 33-21-11-860-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | CAB LIGHT PWR-CEILING-AFT | 307LG | H08 |
| 2000VU | CAB LIGHT PWR-CEILING-AFT | 304LG | H07 |
| 2000VU | CAB LIGHT PWR-CEILING-FWD | 306LG | H06 |
| 2000VU | CAB LIGHT PWR-CEILING-FWD | 305LG | H05 |
| 2000VU | CAB LIGHT PWR-WINDOW-AFT | 302LG | H04 |
| 2000VU | CAB LIGHT PWR-WINDOW-AFT | 301LG | H03 |
| 2000VU | CAB LIGHT PWR-WINDOW-FWD | 303LG | H02 |
| 2000VU | CAB LIGHT PWR-WINDOW-FWD | 300LG | H01 |
| 2000VU | LIGHT-CABIN-ENTRY | 308LG | J02 |
D. Preparation for the test
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Energize the Cabin Intercommunication Data System (CIDS) (Ref. AMM TASK 23-73-00-861-001).
(3) Make sure that the cockpit door is closed and the engines are not running.
(4) Push the MAIN OFF membrane switch on the forward attendant panel 120RH.
(5) Make sure that the integral lights on all BRT, DIM1, DIM2, WDO and CLG membrane switches on the forward attendant panel 120RH are off.
Subtask 33-21-11-710-050-A ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Energize the Cabin Intercommunication Data System (CIDS) (Ref. AMM TASK 23-73-00-861-001).
(3) Make sure that the cockpit door is closed and the engines are not running.
(4) Push the MAIN OFF membrane switch on the forward attendant panel 120RH.
(5) Make sure that the integral lights on all BRT, DIM1, DIM2, WDO and CLG membrane switches on the forward attendant panel 120RH are off.
E. Test of the Entrance-, Window- and Ceiling-Lights
(1) Do the operational test.
Subtask 33-21-11-860-050-B ** ON A/C NOT FOR ALL (1) Do the operational test.
| ACTION | RESULT |
|---|---|
| 1.For the entrance lighting: On the forward attendant panel: | At the related entrance light position: |
|
|
|
|
|
|
|
|
| 2.For the window or ceiling lighting: On the forward attendant panel: | At the related window or ceiling light position: |
| - push the BRT pushbutton switch. |
|
|
|
|
|
|
|
F. Preparation for the test
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the cockpit door is closed and the engines are not running.
(3) Push the LIGHT MAIN ON/OFF membrane switch on Flight Attendant Panel (FAP) 120RH.
(4) Make sure that the indication on all of the BRT, DIM1, DIM2, WDO and CLG buttons on FAP 120RH are off.
Subtask 33-21-11-710-050-B ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the cockpit door is closed and the engines are not running.
(3) Push the LIGHT MAIN ON/OFF membrane switch on Flight Attendant Panel (FAP) 120RH.
(4) Make sure that the indication on all of the BRT, DIM1, DIM2, WDO and CLG buttons on FAP 120RH are off.
G. Operational Test
(1) Do this test of the entrance-Lights, window-lights and ceiling-lights:
5. Close-up(1) Do this test of the entrance-Lights, window-lights and ceiling-lights:
| ACTION | RESULT |
|---|---|
| 1.For the entrance lighting: | |
| On Flight Attendant Panel (FAP) 120RH: | On FAP 120RH: |
|
|
|
|
| | In the cabin:
|
| | On FAP 120RH: |
|
|
| | In the cabin:
|
| | On FAP 120RH: |
|
|
| | In the cabin:
|
| | On FAP 120RH: |
|
|
| | In the cabin:
|
| 2.For the window or ceiling lighting: | |
| On FAP 120RH: | On FAP 120RH: |
|
|
| | In the cabin:
|
| | On FAP 120RH: |
|
|
| | In the cabin:
|
| | On FAP 120RH: |
|
|
| | In the cabin:
|
| | On FAP 120RH: |
|
|
| | In the cabin:
|
Subtask 33-21-11-410-051-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) For the ceiling ballast unit and lampholder:
Subtask 33-21-11-862-050-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) For the ceiling ballast unit and lampholder:
- Install the related ceiling panel (Ref. AMM TASK 25-23-41-400-001).
NOTE: It is not necessary to do the operational test (Ref. AMM TASK 33-21-00-710-001) and (Ref. AMM TASK 33-51-00-710-001), if ceiling or entrance panels are installed because of an illumination unit change.
(3) For the window ballast unit and lampholder: - Install the related cove light panel (Ref. AMM TASK 25-23-48-400-001).
- Put the STEPLADDER 1.0 M (3.3 FT) below the related ceiling panel.
- Install the related ceiling panel (Ref. AMM TASK 25-23-42-400-001) (Ref. AMM TASK 25-23-42-400-002).
- If the Cockpit Door Surveillance System (CDSS) camera is installed in the ceiling panel, make sure that the operational test of the CDSS camera is done (Ref. AMM TASK 23-72-00-710-001).
B. Put the aircraft back to the serviceable condition.
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).