Installation of the MLG Uplock Actuator
TASK 32-31-45-400-001-A
Installation of the MLG Uplock Actuator
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Referenced Information
3. Job Set-up
Subtask 32-31-45-860-051-A
Subtask 32-31-45-420-050-A
Subtask 32-31-45-410-050-A
[Rev.10 from 2021]
2026.04.01 00:45:30 UTC
Installation of the MLG Uplock Actuator
WARNING:
MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
WORK ON THE HYDRAULIC SYSTEMS CAN BE DANGEROUS.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | Torque wrench: range to between 1.63 and 1.52 m.daN (12.02 and 11.21 lbf.ft ) ![]() |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.04JMD9) | Top Coat Polyurethane-- Decorative Furnishing |
| (Material No.06LCG9) | Non Hardening Jointing Putty-Medium Temp. Area - - |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 29-10-00-864-001-A | Depressurize the Green Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-23-00-860-001-A | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 32-00-00-860-001-A | Flight Configuration Precautions with Electrical Power |
| TASK 32-00-00-860-001-A-01 | Flight Configuration Precautions without Electrical Power |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
| TASK 32-31-00-720-002-A | Functional Test of the Normal Extension and Retraction of the Landing Gear |
| TASK 32-33-00-720-001-A | Functional Check of Free-Fall Extension |
| TASK 51-75-13-916-002-A | Repair to a layer of Corrosion Preventive Compound |
Subtask 32-31-45-860-051-A
A. Aircraft Maintenance Configuration
(1) Make sure that the PTU isolation coupling is disconnected (Ref. AMM TASK 29-23-00-860-001).
(2) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(3) Make sure that the flight configuration precautions were obeyed (Ref. AMM TASK 32-00-00-860-001).
(4) Make sure that the Green hydraulic system is depressurized (Ref. AMM TASK 29-10-00-864-001).
(5) Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
Subtask 32-31-45-865-051-A (1) Make sure that the PTU isolation coupling is disconnected (Ref. AMM TASK 29-23-00-860-001).
(2) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(3) Make sure that the flight configuration precautions were obeyed (Ref. AMM TASK 32-00-00-860-001).
(4) Make sure that the Green hydraulic system is depressurized (Ref. AMM TASK 29-10-00-864-001).
(5) Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 32-31-45-941-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYDRAULIC/G HYD/PUMP ENG1/CTL | 1701GK | H12 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/CTL | 1701GK | R35 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R34 |
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R33 |
C. Make sure that the safty precautions are kept.
Subtask 32-31-45-560-050-A D. Preparation for Installation
(1) Make sure that the helicoid threads in the uplock assembly (6) are in the correct condition
(2) Remove the blanking plugs.
4. Procedure(1) Make sure that the helicoid threads in the uplock assembly (6) are in the correct condition
(2) Remove the blanking plugs.
Subtask 32-31-45-420-050-A
A. Installation of the MLG Uplock Actuator
(1) Put the MLG uplock actuator (1) in position on the uplock assembly (6).
(2) Install the washers (2) and the bolts (3).
(3) Connect the hydraulic hoses (4) and (5). TORQUE the connections to between 1.63 and 1.52 m.daN (12.02 and 11.21 lbf.ft )
.
(4) Mark the connections with Top Coat Polyurethane-- Decorative Furnishing (Material No.04JMD9) .
Subtask 32-31-45-865-052-A (1) Put the MLG uplock actuator (1) in position on the uplock assembly (6).
(2) Install the washers (2) and the bolts (3).
(3) Connect the hydraulic hoses (4) and (5). TORQUE the connections to between 1.63 and 1.52 m.daN (12.02 and 11.21 lbf.ft )
. (4) Mark the connections with Top Coat Polyurethane-- Decorative Furnishing (Material No.04JMD9) .
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 32-31-45-720-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYDRAULIC/G HYD/PUMP ENG1/CTL | 1701GK | H12 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/CTL | 1701GK | R35 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R34 |
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R33 |
C. Test
(1) Do the functional test of the MLG (Ref. AMM TASK 32-31-00-720-002).
(2) Do the functional check of the free-fall extension system of the MLG (Ref. AMM TASK 32-33-00-720-001).
(3) Open the applicable MLG door (Ref. AMM TASK 32-12-00-010-001).
(4) Make sure that there is no hydraulic fluid leakage from the uplock assembly. Leaks are not permitted.
5. Close-up(1) Do the functional test of the MLG (Ref. AMM TASK 32-31-00-720-002).
(2) Do the functional check of the free-fall extension system of the MLG (Ref. AMM TASK 32-33-00-720-001).
(3) Open the applicable MLG door (Ref. AMM TASK 32-12-00-010-001).
(4) Make sure that there is no hydraulic fluid leakage from the uplock assembly. Leaks are not permitted.
Subtask 32-31-45-410-050-A
A. Close Access
(1) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the nuts, bolts, washers, hydraulic pipes and adjacent areas (Ref. AMM TASK 51-75-13-916-002).
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Close the applicable MLG door (Ref. AMM TASK 32-12-00-410-001).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the nuts, bolts, washers, hydraulic pipes and adjacent areas (Ref. AMM TASK 51-75-13-916-002).
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Close the applicable MLG door (Ref. AMM TASK 32-12-00-410-001).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
MLG Uplock Actuator