W DOC AIRBUS | AMM A320F

Installation of the MLG Uplock Actuator


TASK 32-31-45-400-001-A
Installation of the MLG Uplock Actuator


WARNING: MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES. WORK ON THE HYDRAULIC SYSTEMS CAN BE DANGEROUS.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 2509GM
FIN: 2510GM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
Torque wrench: range to between 1.63 and 1.52 m.daN (12.02 and 11.21 lbf.ft ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.04JMD9)
Top Coat Polyurethane-- Decorative Furnishing
(Material No.06LCG9)
Non Hardening Jointing Putty-Medium Temp. Area - -
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 29-10-00-864-001-A
Depressurize the Green Hydraulic System
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 29-23-00-860-001-A
Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 32-00-00-860-001-A
Flight Configuration Precautions with Electrical Power
TASK 32-00-00-860-001-A-01
Flight Configuration Precautions without Electrical Power
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
TASK 32-12-00-410-001-A
Close the Main Gear Doors after Access
TASK 32-31-00-720-002-A
Functional Test of the Normal Extension and Retraction of the Landing Gear
TASK 32-33-00-720-001-A
Functional Check of Free-Fall Extension
TASK 51-75-13-916-002-A
Repair to a layer of Corrosion Preventive Compound
3. Job Set-up
Subtask 32-31-45-860-051-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the PTU isolation coupling is disconnected (Ref. AMM TASK 29-23-00-860-001).
   (2) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
   (3) Make sure that the flight configuration precautions were obeyed (Ref. AMM TASK 32-00-00-860-001).
   (4) Make sure that the Green hydraulic system is depressurized (Ref. AMM TASK 29-10-00-864-001).
   (5) Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
Subtask 32-31-45-865-051-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUL/G/LGCIU/SYS1/NORM1GAC09
** ON A/C NOT FOR ALL
49VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKH12
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKR35
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR34
** ON A/C ALL
121VUHYDRAULIC/LGCIU/SYS22GAQ35
121VUHYDRAULIC/LGCIU/SYS1/GRND SPLY52GAQ34
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR33
Subtask 32-31-45-941-051-A
C. Make sure that the safty precautions are kept.
Subtask 32-31-45-560-050-A
D. Preparation for Installation
   (1) Make sure that the helicoid threads in the uplock assembly (6) are in the correct condition
   (2) Remove the blanking plugs.
4. Procedure
Subtask 32-31-45-420-050-A
A. Installation of the MLG Uplock Actuator
   (1) Put the MLG uplock actuator (1) in position on the uplock assembly (6).
   (2) Install the washers (2) and the bolts (3).
   (3) Connect the hydraulic hoses (4) and (5). TORQUE the connections to between 1.63 and 1.52 m.daN (12.02 and 11.21 lbf.ft ) T.
   (4) Mark the connections with Top Coat Polyurethane-- Decorative Furnishing (Material No.
04JMD9) .
Subtask 32-31-45-865-052-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUL/G/LGCIU/SYS1/NORM1GAC09
** ON A/C NOT FOR ALL
49VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKH12
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKR35
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR34
** ON A/C ALL
121VUHYDRAULIC/LGCIU/SYS22GAQ35
121VUHYDRAULIC/LGCIU/SYS1/GRND SPLY52GAQ34
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR33
Subtask 32-31-45-720-050-A
C. Test
   (1) Do the functional test of the MLG (Ref. AMM TASK 32-31-00-720-002).
   (2) Do the functional check of the free-fall extension system of the MLG (Ref. AMM TASK 32-33-00-720-001).
   (3) Open the applicable MLG door (Ref. AMM TASK 32-12-00-010-001).
   (4) Make sure that there is no hydraulic fluid leakage from the uplock assembly. Leaks are not permitted.
5. Close-up
Subtask 32-31-45-410-050-A
A. Close Access
   (1) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the nuts, bolts, washers, hydraulic pipes and adjacent areas (Ref. AMM TASK 51-75-13-916-002).
   (2) Make sure that the work area is clean and clear of tools and other items.
   (3) Close the applicable MLG door (Ref. AMM TASK 32-12-00-410-001).
   (4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
[Rev.10 from 2021] 2026.04.01 00:45:30 UTC