Remove ULB for In Shop Battery Discard
TASK 31-39-33-920-801-A
Remove ULB for In Shop Battery Discard
Refer to the MPD TASK: 313900-02
REMOVE ULB FOR IN SHOP BATTERY DISCARD.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 31-39-33-861-050-A ** ON A/C NOT FOR ALL
Subtask 31-39-33-020-050-A ** ON A/C NOT FOR ALL
Subtask 31-39-33-410-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:37:02 UTC
Remove ULB for In Shop Battery Discard
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobRefer to the MPD TASK: 313900-02
REMOVE ULB FOR IN SHOP BATTERY DISCARD.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | 1 | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| No specific | 1 | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 122 | AVIONICS COMPARTMENT |
| 312 | AFT FUSLG TAIL SECTION |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-39-00-710-803-A | Operational Check of CVDR ULB |
| TASK 31-39-33-000-801-A | Removal of the Cockpit Voice and Data Recorder (CVDR) and the Umbrella Panels |
| TASK 31-39-33-400-801-A | Installation of the Cockpit Voice and Data Recorder (CVDR) and the Umbrella Panels |
| TASK 52-41-00-010-002-A | Open the Avionics Compartment Doors for Access |
| TASK 52-41-00-410-002-A | Close the Avionics Compartment Doors after Access |
Subtask 31-39-33-861-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 31-39-33-010-050-A ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
B. Get Access
(1) Put the WARNING NOTICE(S) in position in the cockpit to tell persons not to operate the flight controls.
(2) Get access to the CVDR2 (1):
(a) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position below access door 811.
(b) Open access door 811 (Ref. AMM TASK 52-41-00-010-002).
(3) Get access to the CVDR1 (2):
(a) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below access door 312AR.
(b) Open access door 312AR.
(c) Set light switch 3LJ to the ON position.
(d) Remove the CVDR umbrella (Ref. AMM TASK 31-39-33-000-801).
4. Procedure(1) Put the WARNING NOTICE(S) in position in the cockpit to tell persons not to operate the flight controls.
(2) Get access to the CVDR2 (1):
(a) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position below access door 811.
(b) Open access door 811 (Ref. AMM TASK 52-41-00-010-002).
(3) Get access to the CVDR1 (2):
(a) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below access door 312AR.
(b) Open access door 312AR.
(c) Set light switch 3LJ to the ON position.
(d) Remove the CVDR umbrella (Ref. AMM TASK 31-39-33-000-801).
Subtask 31-39-33-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the ULB
(1) Remove the ULBs (6) from the CVDRs (1) and (2):
(a) Remove the screws (5) from the mounting brackets (4).
(b) Remove the mounting brackets (4) and the nuts (3).
(c) Remove the ULB (6) from the mounting brackets (4).
Subtask 31-39-33-960-050-A ** ON A/C NOT FOR ALL (1) Remove the ULBs (6) from the CVDRs (1) and (2):
(a) Remove the screws (5) from the mounting brackets (4).
(b) Remove the mounting brackets (4) and the nuts (3).
(c) Remove the ULB (6) from the mounting brackets (4).
B. Replacement of the ULB Battery
(1) Send the ULB to the workshop to discard and replace the ULB battery.
Subtask 31-39-33-710-050-A ** ON A/C NOT FOR ALL 5. Close-up(1) Send the ULB to the workshop to discard and replace the ULB battery.
Subtask 31-39-33-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close access to the CVDR2 (1):
(a) Close access door 811 (Ref. AMM TASK 52-41-00-410-002).
(3) Close access to the CVDR1 (2):
(a) Install the CVDR umbrella (Ref. AMM TASK 31-39-33-400-801).
(b) Set light switch 3LJ to the OFF position.
(c) Close access door 312AR
(4) Remove the WARNING NOTICE(S).
(5) Remove the access platform(s).
Subtask 31-39-33-862-050-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close access to the CVDR2 (1):
(a) Close access door 811 (Ref. AMM TASK 52-41-00-410-002).
(3) Close access to the CVDR1 (2):
(a) Install the CVDR umbrella (Ref. AMM TASK 31-39-33-400-801).
(b) Set light switch 3LJ to the OFF position.
(c) Close access door 312AR
(4) Remove the WARNING NOTICE(S).
(5) Remove the access platform(s).
B. Aircraft Maintenance Configuration
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Underwater Locator Beacon (ULB)