Installation of the Manual Selector Valve
TASK 29-16-51-400-001-A
Installation of the Manual Selector Valve
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 29-16-51-860-053-A
Subtask 29-16-51-560-050-A
Subtask 29-16-51-860-051-A
[Rev.10 from 2021]
2026.04.01 08:10:22 UTC
Installation of the Manual Selector Valve
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 1134GQ
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.02ABA1) | Phosphate Ester Hydraulic Fluid-General Power - - |
| (Material No.06LCG9) | Non Hardening Jointing Putty-Medium Temp. Area - - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 197BB, 198CB |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 12 | O-RING | AIPC 29-16-04-03-070 |
| 18 | O-RING | AIPC 29-16-04-03-070 |
| 5 | O-RING | AIPC 29-16-04-03-070 |
| 7 | O-RING | AIPC 29-16-04-03-070 |
| 12 | O-RING | AIPC 29-16-84-03-280 |
| 18 | O-RING | AIPC 29-16-84-03-280 |
| 5 | O-RING | AIPC 29-16-84-03-280 |
| 7 | O-RING | AIPC 29-16-84-03-280 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-14-00-614-002-A | Pressurization of the Hydraulic Reservoirs through the Ground Connector |
| TASK 29-14-00-614-002-A-01 | Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU) |
Subtask 29-16-51-860-053-A
A. Aircraft Maintenance Configuration
(2) Make sure that the WARNING NOTICE(S) is in position to tell persons not to pressurize the hydraulic systems:
(Ref. AMM TASK 29-00-00-864-001).
(4) Depressurize the reservoirs of the Green ,Yellow and Blue hydraulic systems (Ref. AMM TASK 29-14-00-614-001).
(5) Make sure that the access panel 197BB is removed.
(6) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position below the ground service panel of the Green hydraulic system.
(7) Make sure that the CONTAINER 3 L(3/4 USGAL) is in position below the hydraulic connections to collect the hydraulic fluid.
Subtask 29-16-51-865-051-A WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002). (2) Make sure that the WARNING NOTICE(S) is in position to tell persons not to pressurize the hydraulic systems:
- in the cockpit on the hydraulic section 40VU of the overhead panel.
(Ref. AMM TASK 29-00-00-864-001).
(4) Depressurize the reservoirs of the Green ,Yellow and Blue hydraulic systems (Ref. AMM TASK 29-14-00-614-001).
(5) Make sure that the access panel 197BB is removed.
(6) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position below the ground service panel of the Green hydraulic system.
(7) Make sure that the CONTAINER 3 L(3/4 USGAL) is in position below the hydraulic connections to collect the hydraulic fluid.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/HYD/QTY/IND | 1831GQ | P35 |
Subtask 29-16-51-560-050-A
A. Preparation for Installation
(1) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the threads of the screws (21).
(2) Remove the components which are attached to the removed valve assembly (17) as follows:
(a) Remove the four adapters (4),(8),(11) and (19).
(b) Discard the four O-rings (5),(7),(12) and (18).
(3) Install the components in the replacement valve assembly (17) as follows:
(a) Lubricate the new AIPC 29-16-04-03-070 O-RING (5) or AIPC 29-16-84-03-280 O-RING (5), AIPC 29-16-04-03-070 O-RING (7) or AIPC 29-16-84-03-280 O-RING (7), AIPC 29-16-04-03-070 O-RING (12) or AIPC 29-16-84-03-280 O-RING (12) and AIPC 29-16-04-03-070 O-RING (18) or AIPC 29-16-84-03-280 O-RING (18) with Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) .
(b) Put the four O-rings (5),(7),(12) and (18) in position on the four adapters (4),(8),(11) and (19).
(c) Install the four adapters (4),(8),(11) and (19) complete with the O-rings in the four ports A, G, B and Y of the valve assembly (17).
(d) Tighten the adapters (4),(8),(11) and (19).
(4) Connect the bonding jumper (14) with the screw (16, the washer (15) and the nut (13) (Ref. AMM TASK 20-28-00-912-802).
Subtask 29-16-51-420-050-A (1) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the threads of the screws (21).
(2) Remove the components which are attached to the removed valve assembly (17) as follows:
(a) Remove the four adapters (4),(8),(11) and (19).
(b) Discard the four O-rings (5),(7),(12) and (18).
(3) Install the components in the replacement valve assembly (17) as follows:
(a) Lubricate the new AIPC 29-16-04-03-070 O-RING (5) or AIPC 29-16-84-03-280 O-RING (5), AIPC 29-16-04-03-070 O-RING (7) or AIPC 29-16-84-03-280 O-RING (7), AIPC 29-16-04-03-070 O-RING (12) or AIPC 29-16-84-03-280 O-RING (12) and AIPC 29-16-04-03-070 O-RING (18) or AIPC 29-16-84-03-280 O-RING (18) with Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) .
(b) Put the four O-rings (5),(7),(12) and (18) in position on the four adapters (4),(8),(11) and (19).
(c) Install the four adapters (4),(8),(11) and (19) complete with the O-rings in the four ports A, G, B and Y of the valve assembly (17).
(d) Tighten the adapters (4),(8),(11) and (19).
(4) Connect the bonding jumper (14) with the screw (16, the washer (15) and the nut (13) (Ref. AMM TASK 20-28-00-912-802).
B. Installation of the Manual Selector Valve
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the blanking plugs from the line ends.
(4) Make sure that the hydraulic line end-fittings are serviceable.
(5) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the threads of the line end-fittings.
(6) Put the selector valve (17) in position in the service panel (6).
(7) Install the screws (21) and the washers (22).
(8) Connect the pipe to the adapter (8) installed in port B of the valve assembly (17).
(9) TORQUE the union nut (9) to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft )
.
(10) Connect the pipe to the adapter (11) installed in port A of the valve assembly (17).
(11) TORQUE the union nut (10) to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft )
.
(12) Connect the pipe to the adapter (19) installed in port G of the valve assembly (17).
(13) TORQUE the union nut (20) to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft )
.
(14) Connect the pipe to the adapter (4) installed in port Y of the valve assembly (17).
(15) TORQUE the union nut (3) to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft )
.
(16) Make sure that all the electrical connections are clean and in the correct condition.
(17) Connect the electrical connector (1) to the receptacle (2).
Subtask 29-16-51-860-050-A CAUTION:
USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU DO NOT USE THE SECOND WRENCH, THERE IS A RISK THAT YOU WILL LOOSEN OR TIGHTEN THE UNION TOO MUCH.
CAUTION:
YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS LUBRICANT.
(1) Clean the component interfaces and the adjacent area.(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the blanking plugs from the line ends.
(4) Make sure that the hydraulic line end-fittings are serviceable.
(5) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the threads of the line end-fittings.
(6) Put the selector valve (17) in position in the service panel (6).
(7) Install the screws (21) and the washers (22).
(8) Connect the pipe to the adapter (8) installed in port B of the valve assembly (17).
(9) TORQUE the union nut (9) to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft )
. (10) Connect the pipe to the adapter (11) installed in port A of the valve assembly (17).
(11) TORQUE the union nut (10) to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft )
. (12) Connect the pipe to the adapter (19) installed in port G of the valve assembly (17).
(13) TORQUE the union nut (20) to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft )
. (14) Connect the pipe to the adapter (4) installed in port Y of the valve assembly (17).
(15) TORQUE the union nut (3) to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft )
. (16) Make sure that all the electrical connections are clean and in the correct condition.
(17) Connect the electrical connector (1) to the receptacle (2).
C. Preparation for the Test
(1) Remove the blanking cap from the reservoir fill valve 1698GM.
(2) Connect the flexible hose 1699GM to the reservoir fill valve 1698GM.
(3) Put the end of the flexible hose into a container of Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) .
(4) Make sure that the manual selector valve 1134GM is set to NEUTRAL.
(5) Open the access door 198CB.
(6) Put the hand pump lever (located on the ground service panel of the Yellow hydraulic system) on the hand pump 1009GM.
(7) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
Subtask 29-16-51-865-052-A (1) Remove the blanking cap from the reservoir fill valve 1698GM.
(2) Connect the flexible hose 1699GM to the reservoir fill valve 1698GM.
(3) Put the end of the flexible hose into a container of Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) .
(4) Make sure that the manual selector valve 1134GM is set to NEUTRAL.
(5) Open the access door 198CB.
(6) Put the hand pump lever (located on the ground service panel of the Yellow hydraulic system) on the hand pump 1009GM.
(7) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 29-16-51-710-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/HYD/QTY/IND | 1831GQ | P35 |
E. Do this Test
5. Close-up| ACTION | RESULT |
|---|---|
1.On the ground service panel of the Green hydraulic system:
| On the ground service panel of the Green hydraulic system:
NOTE: A pressure relief valve in the fill selector valve will operate if too much pressure is put into the system. If this happens, a small amount of fluid will go into the reservoir of the Yellow hydraulic system. |
2.On the manual selector valve 1134GQ:
| On the reservoir quantity indicator 1834GQ:
|
3.On the hand pump 1009GM:
| On the reservoir quantity indicator 1834GQ:
NOTE: When the hand pump is operated between 5 and 10 strokes, a small quantity of fluid (between 200 and 400 ml) will go into the selected reservoir. |
| 4.Do the steps 2 and 3 again for the Yellow system. | The same result as in the steps 2 and 3, for the Yellow reservoir. |
| 5.Do the steps 2 and 3 again for the Green system. | The same result as in the steps 2 and 3, for the Green reservoir. |
6.On the manual selector valve 1134GQ:
| On the reservoir quantity indicator 1834GQ:
|
Subtask 29-16-51-860-051-A
A. Put the aircraft back to the serviceable condition.
(1) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
(2) Disconnect the flexible hose from the fill valve 1698GM.
(3) Put the flexible hose in its position in the ground service panel of the Green system.
(4) Install the blanking cap on the fill valve 1698GM.
(5) Remove the hand pump lever from the hand pump 1009GM.
(6) Put the hand pump lever in position on the ground service panel of the Yellow system.
(7) Remove the container from below the hydraulic connections.
(8) Pressurize the reservoirs of the hydraulic systems.
(Ref. AMM TASK 29-14-00-614-002).
(9) Remove the access platform from below the ground service panel of the Green hydraulic system.
(10) Remove the WARNING NOTICE(S).
Subtask 29-16-51-410-050-A (1) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
(2) Disconnect the flexible hose from the fill valve 1698GM.
(3) Put the flexible hose in its position in the ground service panel of the Green system.
(4) Install the blanking cap on the fill valve 1698GM.
(5) Remove the hand pump lever from the hand pump 1009GM.
(6) Put the hand pump lever in position on the ground service panel of the Yellow system.
(7) Remove the container from below the hydraulic connections.
(8) Pressurize the reservoirs of the hydraulic systems.
(Ref. AMM TASK 29-14-00-614-002).
(9) Remove the access platform from below the ground service panel of the Green hydraulic system.
(10) Remove the WARNING NOTICE(S).