Installation of the Self Sealing Half-Coupling of the Yellow Pump Suction
TASK 29-13-39-400-804-A
Installation of the Self Sealing Half-Coupling of the Yellow Pump Suction
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 29-13-39-860-059-A ** ON A/C NOT FOR ALL
Subtask 29-13-39-420-054-A ** ON A/C NOT FOR ALL
Subtask 29-13-39-942-055-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:20:58 UTC
Installation of the Self Sealing Half-Coupling of the Yellow Pump Suction
WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
WARNING:
DO NOT TOUCH THE HYDRAULIC SYSTEM COMPONENTS FOR A SHORT TIME AFTER THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS STAY HOT FOR SOME TIME AND CAN CAUSE INJURY.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION:
DO NOT LET HYDRAULIC FLUID FALL ON THE ENGINE. UNWANTED HYDRAULIC FLUID MUST BE REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH. THE FLUID CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME PARTS.
FIN: 3700GM ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.02ABA1) | Phosphate Ester Hydraulic Fluid-General Power - - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 195BB, 197CB, 437AL |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 2 | TEFLON RETAINER RING | AIPC 29-11-06-01-031 |
| 3 | O-RING | AIPC 29-11-06-01-032 |
| 5 | O-RING | AIPC 29-11-06-01-040 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-12-29-611-001-A | Fill the Hydraulic Fluid Reservoir with a Hand Pump |
| TASK 20-29-00-911-002-A | Removal/Installation of an O-ring (Hydraulic Systems) |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 29-10-00-864-002-A | Depressurize the Yellow Hydraulic System |
| TASK 29-13-00-710-002-A | Operational Test of the Yellow Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 71-13-00-010-040-B | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-B | Closing of the Fan Cowl Doors |
Subtask 29-13-39-860-059-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the Yellow hydraulic system is depressurized.
(Ref. AMM TASK 29-10-00-864-002).
(3) Make sure that the reservoir of the Yellow hydraulic system is depressurized.
(Ref. AMM TASK 29-14-00-614-001).
(4) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to pressurize the Yellow hydraulic system:
(6) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the engine 2.
(7) Make sure that the left fan-cowl door 437AL is open (Ref. AMM TASK 71-13-00-010-040).
Subtask 29-13-39-941-059-A ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the Yellow hydraulic system is depressurized.
(Ref. AMM TASK 29-10-00-864-002).
(3) Make sure that the reservoir of the Yellow hydraulic system is depressurized.
(Ref. AMM TASK 29-14-00-614-001).
(4) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to pressurize the Yellow hydraulic system:
- On the ground service panel of the Yellow hydraulic-system access-door 197CB
(6) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the engine 2.
(7) Make sure that the left fan-cowl door 437AL is open (Ref. AMM TASK 71-13-00-010-040).
B. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(3) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to pressurize the Yellow hydraulic system:
4. Procedure(1) On the center pedestal, on the ENG panel 115VU:
- Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to start the engine.
(3) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to pressurize the Yellow hydraulic system:
- In the cockpit, on the HYD section of the HYD/FUEL panel 40VU.
- Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
- Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to energize the FADEC 1(2).
Subtask 29-13-39-420-054-A ** ON A/C NOT FOR ALL
A. Installation of the Self Sealing Half-Coupling of the Yellow Pump Suction
(2) Install the O-ring (5) on the self sealing half-coupling (7) (Ref. AMM TASK 20-29-00-911-002).
(3) Remove the PLUG - BLANKING from the fluid disconnect panel (6).
(4) Install the self sealing half-coupling (7) on the fluid disconnect panel (6).
(5) TORQUE the self sealing half-coupling (7) to between 14.3 and 14.1 m.daN (105.46 and 103.98 lbf.ft )
.
(6) Install the O-ring (3) and the new AIPC 29-11-06-01-031 TEFLON RETAINER RING (2) on the self sealing half-coupling (4).
(7) Remove the PLUG - BLANKING from the disconnected hose (1).
(8) Install the self sealing half-coupling (4) on the hose (1).
(9) TORQUE the coupling nut of the hose (1) to between 10.17 and 9.04 m.daN (75.00 and 66.67 lbf.ft )
.
(10) Tighten the sleeve of the self sealing half-coupling (4) with your hand until you fully engage the teeth.
Subtask 29-13-39-710-054-A ** ON A/C NOT FOR ALL CAUTION:
USE TWO WRENCHES TO REMOVE OR INSTALL THE TUBE COUPLING NUTS:
(1) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the new AIPC 29-11-06-01-032 O-RING (3) and AIPC 29-11-06-01-040 O-RING (5). - ONE WRENCH TO HOLD THE UNION, AND
- ONE TO LOOSEN OR TIGHTEN THE COUPLING NUT.
(2) Install the O-ring (5) on the self sealing half-coupling (7) (Ref. AMM TASK 20-29-00-911-002).
(3) Remove the PLUG - BLANKING from the fluid disconnect panel (6).
(4) Install the self sealing half-coupling (7) on the fluid disconnect panel (6).
(5) TORQUE the self sealing half-coupling (7) to between 14.3 and 14.1 m.daN (105.46 and 103.98 lbf.ft )
. (6) Install the O-ring (3) and the new AIPC 29-11-06-01-031 TEFLON RETAINER RING (2) on the self sealing half-coupling (4).
(7) Remove the PLUG - BLANKING from the disconnected hose (1).
(8) Install the self sealing half-coupling (4) on the hose (1).
(9) TORQUE the coupling nut of the hose (1) to between 10.17 and 9.04 m.daN (75.00 and 66.67 lbf.ft )
. (10) Tighten the sleeve of the self sealing half-coupling (4) with your hand until you fully engage the teeth.
B. Test
(1) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(2) Do an operational test of the Yellow hydraulic system (Ref. AMM TASK 29-13-00-710-002).
(3) During the dry motoring, make sure that there are no leaks from the self sealing half-couplings (4) and (7).
(4) Make sure that the level of the hydraulic fluid in the Yellow reservoir is correct. If necessary, fill the reservoir (Ref. AMM TASK 12-12-29-611-001).
5. Close-up(1) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(2) Do an operational test of the Yellow hydraulic system (Ref. AMM TASK 29-13-00-710-002).
(3) During the dry motoring, make sure that there are no leaks from the self sealing half-couplings (4) and (7).
(4) Make sure that the level of the hydraulic fluid in the Yellow reservoir is correct. If necessary, fill the reservoir (Ref. AMM TASK 12-12-29-611-001).
Subtask 29-13-39-942-055-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Remove the access platform(s).
(2) remove the CONTAINER 10 L(2 1/2 USGAL).
(3) Make sure that the work area is clean and clear of tools and other items.
(4) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(5) De-energize the aircraft electrical circuits
Subtask 29-13-39-410-054-A ** ON A/C NOT FOR ALL (1) Remove the access platform(s).
(2) remove the CONTAINER 10 L(2 1/2 USGAL).
(3) Make sure that the work area is clean and clear of tools and other items.
(4) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(5) De-energize the aircraft electrical circuits
Self Sealing Half-Coupling of the Yellow Pump Suction