Operational Test of the Spoiler Elevator Computer 3 (SEC 3)
TASK 27-94-00-710-001-A
Operational Test of the Spoiler Elevator Computer 3 (SEC 3)
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 27-94-00-860-050-A ** ON A/C NOT FOR ALL
Subtask 27-94-00-710-050-A
Subtask 27-94-00-860-051-A
[Rev.10 from 2021]
2026.04.01 07:11:52 UTC
Operational Test of the Spoiler Elevator Computer 3 (SEC 3)
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
ZONE: 210
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 29-10-00-864-003-A | Depressurize the Blue Hydraulic System |
| TASK 29-23-00-863-001-A | Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump |
| TASK 29-23-00-864-001-A | Depressurize the Green and Yellow Hydraulic Systems after Operation of the PTU |
| TASK 29-24-00-863-001-A | Pressurize the Yellow Hydraulic System with the Electric Pump |
| TASK 29-24-00-864-001-A | Depressurize the Yellow Hydraulic System |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 27-94-00-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the hydraulic systems are depressurized (Ref. AMM TASK 29-10-00-864-003) (Ref. AMM TASK 29-23-00-864-001) (Ref. AMM TASK 29-24-00-864-001).
(3) On the FLT CTL panels 23VU and 24VU, release the FLT CTL/ELAC 1, FLT CTL/ELAC 2, FLT CTL/SEC 1 and FLT CTL/SEC 2 (on these pushbutton switches, the OFF legends come on).
(4) On the FLT CTL panel 24VU, make sure that the FLT CTL/SEC3 pushbutton switch is pushed (on this pusbutton switch, the OFF legend is off).
(5) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(6) On the center pedestal, on the ECAM control panel, push the F/CTL key (on the lower ECAM DU, the F/CTL page comes into view).
(7) On the panel 114VU, make sure that the flap and slat control lever is not in position FULL.
Subtask 27-94-00-860-050-B ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the hydraulic systems are depressurized (Ref. AMM TASK 29-10-00-864-003) (Ref. AMM TASK 29-23-00-864-001) (Ref. AMM TASK 29-24-00-864-001).
(3) On the FLT CTL panels 23VU and 24VU, release the FLT CTL/ELAC 1, FLT CTL/ELAC 2, FLT CTL/SEC 1 and FLT CTL/SEC 2 (on these pushbutton switches, the OFF legends come on).
(4) On the FLT CTL panel 24VU, make sure that the FLT CTL/SEC3 pushbutton switch is pushed (on this pusbutton switch, the OFF legend is off).
(5) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(6) On the center pedestal, on the ECAM control panel, push the F/CTL key (on the lower ECAM DU, the F/CTL page comes into view).
(7) On the panel 114VU, make sure that the flap and slat control lever is not in position FULL.
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the hydraulic systems are depressurized (Ref. AMM TASK 29-10-00-864-003) (Ref. AMM TASK 29-23-00-864-001) (Ref. AMM TASK 29-24-00-864-001).
(3) On the FLT CTL panels 23VU and 24VU, release the FLT CTL/ELAC 1, FLT CTL/ELAC 2, FLT CTL/SEC 1 and FLT CTL/SEC 2 (on these pushbutton switches, the OFF legends come on).
(4) On the FLT CTL panel 24VU, make sure that the FLT CTL/SEC3 pushbutton switch is pushed (on this pusbutton switch, the OFF legend is off).
(5) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(6) On the center pedestal, on the ECAM control panel, push the F/CTL key (on the lower ECAM DU, the F/CTL page comes into view).
(7) On the panel 114VU, make sure that the flap and slat control lever is not in position 3 or FULL.
Subtask 27-94-00-865-050-A (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the hydraulic systems are depressurized (Ref. AMM TASK 29-10-00-864-003) (Ref. AMM TASK 29-23-00-864-001) (Ref. AMM TASK 29-24-00-864-001).
(3) On the FLT CTL panels 23VU and 24VU, release the FLT CTL/ELAC 1, FLT CTL/ELAC 2, FLT CTL/SEC 1 and FLT CTL/SEC 2 (on these pushbutton switches, the OFF legends come on).
(4) On the FLT CTL panel 24VU, make sure that the FLT CTL/SEC3 pushbutton switch is pushed (on this pusbutton switch, the OFF legend is off).
(5) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(6) On the center pedestal, on the ECAM control panel, push the F/CTL key (on the lower ECAM DU, the F/CTL page comes into view).
(7) On the panel 114VU, make sure that the flap and slat control lever is not in position 3 or FULL.
B. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | FLIGHT CONTROLS/SEC3/SPLY | 21CE3 | Q19 |
Subtask 27-94-00-710-050-A
A. Operational Test of the SEC 3
5. Close-upNOTE: There must be a minimum of 30 seconds between the depressurization of the hydraulic systems and the start of the test.
NOTE: During steps 1 to 3, no pressurization is permitted.
| ACTION | RESULT |
|---|---|
| 1.Open the circuit breaker 21CE3. | In the cockpit:
|
| 2.Wait for 10 seconds. | |
| 3.Close the circuit breaker 21CE3. NOTE: During the test, no pressurization is permitted. | On the FLT CTL panel 24VU:
|
| 4.Pressurize the Green and Yellow hydraulic systems (Ref. AMM TASK 29-23-00-863-001) (Ref. AMM TASK 29-24-00-863-001). | |
5.On the CAPT side:
| On the lower ECAM DU, on the F/CTL page:
|
|
|
|
|
|
|
| | |
6.On the F/O side:
| On the lower ECAM DU, on the F/CTL page:
|
|
|
|
|
|
|
| 7.On the center pedestal, set the SPEED BRAKE control lever to FULL. | On the lower ECAM DU:
|
| 8.On the center pedestal, set the SPEED BRAKE control lever to RET. | On the lower ECAM DU:
|
Subtask 27-94-00-860-051-A
A. Put the aircraft back to its initial configuration.
(1) On the FLT CTL panel 23VU:
(4) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(5) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
(1) On the FLT CTL panel 23VU:
- push the FLT CTL/SEC 1 and FLT CTL/ELAC 1 pushbutton switches (on these pushbutton switches, the OFF legends go off).
- push the FLT CTL/SEC 2 and FLT CTL/ELAC 2 pushbutton switches (on these pushbutton switches, the OFF legends go off).
(4) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(5) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).