System Test of the THS Actuator Electrical Control
TASK 27-41-00-730-001-A
System Test of the THS Actuator Electrical Control
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 27-41-00-860-050-A
Subtask 27-41-00-730-050-A
Subtask 27-41-00-860-051-A
[Rev.10 from 2021]
2026.04.01 06:54:15 UTC
System Test of the THS Actuator Electrical Control
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING NOTICES ARE IN POSITION.
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING:
MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM. UNWANTED MOVEMENT OF HYDRAULICALLY OPERATED ITEMS CAN CAUSE SERIOUS INJURY AND/OR DAMAGE.
ZONE: 210
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| 822 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 29-10-00-863-003-A | Pressurize the Blue Hydraulic System with a Hydraulic Ground Power-Cart |
| TASK 29-10-00-863-003-A-01 | Pressurize the Blue Hydraulic System with the Blue Electric Pump |
| TASK 29-23-00-863-001-A | Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump |
| TASK 29-23-00-864-001-A | Depressurize the Green and Yellow Hydraulic Systems after Operation of the PTU |
| TASK 29-24-00-863-001-A | Pressurize the Yellow Hydraulic System with the Electric Pump |
| TASK 29-24-00-864-001-A | Depressurize the Yellow Hydraulic System |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 27-41-00-860-050-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) On the overhead panel 23VU:
(5) On the center pedestal, on the ECAM control panel, push the F/CTL pushbutton switch. (On the lower ECAM display unit, the F/CTL page comes into view).
(6) Pressurize the Green, the Yellow and the Blue hydraulic systems. (Ref. AMM TASK 29-23-00-863-001) (Ref. AMM TASK 29-24-00-863-001) (Ref. AMM TASK 29-10-00-863-003)
Subtask 27-41-00-010-060-A (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) On the overhead panel 23VU:
- make sure that the FLT CTL/ELAC 1 and FLT CTL/SEC 1 pushbutton switches are pushed (On these pushbutton switches, the OFF and FAULT legends are off).
- make sure that the FLT CTL/ELAC 2 and FLT CTL/SEC 2 pushbutton switches are pushed (On these pushbutton switches, the OFF and FAULT legends are off).
(5) On the center pedestal, on the ECAM control panel, push the F/CTL pushbutton switch. (On the lower ECAM display unit, the F/CTL page comes into view).
(6) Pressurize the Green, the Yellow and the Blue hydraulic systems. (Ref. AMM TASK 29-23-00-863-001) (Ref. AMM TASK 29-24-00-863-001) (Ref. AMM TASK 29-10-00-863-003)
B. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 822.
(2) Open the access door 822.
(3) On the battery power center 105VU:
Subtask 27-41-00-865-050-A (1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 822.
(2) Open the access door 822.
(3) On the battery power center 105VU:
- loosen the two srews and remove the protective cover.
C. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B11 |
| 49VU | FLIGHT CONTROLS/THS/ACTR/MOT2 | 19CE2 | B09 |
| 49VU | FLIGHT CONTROLS/SEC1/NORM/SPLY | 21CE1 | B08 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B06 |
| 49VU | FLIGHT CONTROLS/THS/ACTR/MOT2 | 19CE2 | B04 |
| 49VU | FLIGHT CONTROLS/SEC1/NORM/SPLY | 21CE1 | B03 |
| ** ON A/C ALL | |||
| 105VU | FLIGHT CONTROLS/ELAC2/STBY SPLY | 16CE2 | A02 |
| 105VU | FLT CTL/ELAC1/STBY SPLY | 16CE1 | A01 |
| 105VU | FLT CTL/SEC1/STBY SPLY | 22CE | B01 |
| 121VU | FLIGHT CONTROLS/SEC2/SPLY | 21CE2 | Q18 |
| 121VU | FLIGHT CONTROLS/THS ACTR/MOT3 | 19CE3 | Q17 |
| 121VU | FLIGHT CONTROLS/THS ACTR/MOT1 | 19CE1 | Q16 |
| 121VU | FLIGHT CONTROLS/ELAC2/NORM/SPLY | 15CE2 | R20 |
Subtask 27-41-00-730-050-A
A. System Test of the THS Actuator Electrical Control
5. Close-up| ACTION | RESULT |
|---|---|
1.On the center pedestal:
| On the lower ECAM display unit, on the F/CTL page:
|
2.On the center pedestal:
| On the lower ECAM display unit, on the F/CTL page:
|
3.On the panel 23VU:
| On the panel 23VU:
|
4.On the panel 24VU:
| On the panel 24VU:
|
5.On the panel 23VU:
| On the panel 23VU:
|
| | On the center pedestal:
|
| | On the lower ECAM display unit, on the F/CTL page:
|
6.On the panel 23VU:
| On the panel 23VU:
|
7.On the center pedestal:
| |
8.On the panel 23VU:
| On the panel 23VU:
|
| | On the center pedestal:
|
| | On the lower ECAM display unit, on the F/CTL page:
|
9.On the panel 23VU:
| On the panel 23VU:
|
10.On the center pedestal:
| |
11.On the panel 24VU:
| On the panel 24VU:
|
| | On the center pedestal:
|
| | On the lower ECAM display unit, on the F/CTL page:
|
12.On the panel 24VU:
| On the panel 24VU:
|
13.On the center pedestal:
| |
14.On the panel 24VU:
| On the panel 24VU:
|
| | On the center pedestal:
|
| | On the lower ECAM display unit, on the F/CTL page:
|
15.On the panel 23VU:
| On the panel 23VU:
|
16.On the panel 24VU:
| On the panel 24VU:
|
17.On the center pedestal, on the ECAM control panel:
| On the lower ECAM display unit:
|
18.On the panel 40VU:
| On the panel 40VU:
|
| | On the lower ECAM display unit, on the HYD page:
|
19.On the center pedestal, on the ECAM control panel:
| On the lower ECAM display unit:
|
20.On the center pedestal:
| On the lower ECAM display unit, on the F/CTL page:
|
21.On the center pedestal:
| On the lower ECAM display unit, on the F/CTL page:
|
22.On the center pedestal:
| On the lower ECAM display unit, on the F/CTL page:
|
23.On the center pedestal, on the ECAM control panel:
| On the lower ECAM display unit:
|
24.On the panel 40VU:
| On the panel 40VU:
|
| | On the lower ECAM display unit, on the HYD page:
|
25.On the panel 50VU:
| On the panel 50VU:
|
| | On the lower ECAM display unit, on the HYD page:
|
26.On the center pedestal, on the ECAM control panel:
| On the lower ECAM display unit:
|
27.On the center pedestal:
| On the lower ECAM display unit, on the F/CTL page:
|
28.On the center pedestal:
| On the lower ECAM display unit, on the F/CTL page:
|
29.On the center pedestal:
| On the lower ECAM display unit, on the F/CTL page:
|
Subtask 27-41-00-860-051-A
A. Put the aircraft back to its initial configuration.
(1) On the panel 50VU:
(Ref. AMM TASK 29-23-00-864-001) (Ref. AMM TASK 29-24-00-864-001).
(3) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Subtask 27-41-00-410-057-A (1) On the panel 50VU:
- push the HYD/LEAK MEASUREMENT VALVES/Y pushbutton switch (the OFF legend of this pushbutton switch goes off).
(Ref. AMM TASK 29-23-00-864-001) (Ref. AMM TASK 29-24-00-864-001).
(3) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
B. Close Access
(1) Install the protective cover on the battery power center 105VU.
(2) Tighten the two screws.
(3) Close the access door 822.
(4) Remove the access platform(s).
(1) Install the protective cover on the battery power center 105VU.
(2) Tighten the two screws.
(3) Close the access door 822.
(4) Remove the access platform(s).