Functional Test of the THS-Actuator Overtravel Related to the Mechanical Indicator
TASK 27-41-00-720-001-A
Functional Test of the THS-Actuator Overtravel Related to the Mechanical Indicator
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 27-41-00-860-054-A
Subtask 27-41-00-720-051-A
Subtask 27-41-00-860-055-A
[Rev.10 from 2021]
2026.03.31 23:50:41 UTC
Functional Test of the THS-Actuator Overtravel Related to the Mechanical Indicator
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING NOTICES ARE IN POSITION.
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING:
MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM. UNWANTED MOVEMENT OF HYDRAULICALLY OPERATED ITEMS CAN CAUSE SERIOUS INJURY AND/OR DAMAGE.
ZONE: 310
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 310 | FUSLG TAIL SECTION AFT OF AFT PRESS BHD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 27-41-00-820-001-A | Adjustment of the THS Zero Position |
| TASK 27-41-00-820-002-A | Adjustment of the THS Control-Cables Length |
| TASK 29-23-00-863-001-A | Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump |
| TASK 29-23-00-864-001-A | Depressurize the Green and Yellow Hydraulic Systems after Operation of the PTU |
| TASK 29-24-00-863-001-A | Pressurize the Yellow Hydraulic System with the Electric Pump |
| TASK 29-24-00-864-001-A | Depressurize the Yellow Hydraulic System |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 27-41-00-860-054-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
(3) Pressurize the Green and Yellow hydraulic systems (Ref. AMM TASK 29-23-00-863-001) (Ref. AMM TASK 29-24-00-863-001).
(4) On the center pedestal, on the ECAM control panel, push the F/CTL key (on the lower ECAM display unit, the F/CTL page comes into view).
Subtask 27-41-00-865-051-A (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
(3) Pressurize the Green and Yellow hydraulic systems (Ref. AMM TASK 29-23-00-863-001) (Ref. AMM TASK 29-24-00-863-001).
(4) On the center pedestal, on the ECAM control panel, push the F/CTL key (on the lower ECAM display unit, the F/CTL page comes into view).
B. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | FLIGHT CONTROLS/ELAC2/NORM/SPLY | 15CE2 | R20 |
Subtask 27-41-00-720-051-A
A. Functional Test of the THS-Actuator Overtravel Related to the Mechanical Indicator
5. Close-up| ACTION | RESULT |
|---|---|
| 1.Slowly move one of the pitch-trim control wheels to the 4 deg. DN stop. |
|
| 2.Slowly move one of the pitch-trim control wheels to the 13.5 deg UP stop. |
|
| 3.Move the pitch-trim control wheel to the 0 position. |
|
| 4.If the values shown on the F/CTL page are not correct and if you touch the stop on the pitch-trim gearset unit before the stop of the THS actuator mechanical input, do these steps: A.Loosen the cables (Ref. AMM TASK 27-41-00-820-001)(Ref.Subtask 27-41-00-820-050). B.Remove the chain from the pinion just after the gearset unit. C.Shift one tooth between the gear just after the pitch-trim gearset unit and the chain/cable to the THS. D.Install the chain on the pinion. E.Adjust the trim control wheel (Ref. AMM TASK 27-41-00-820-002). F.Adjust the tension of the cable (Ref. AMM TASK 27-41-00-820-002). G.Make sure that you touch the stop of the THS actuator mechanical input before the stop of the pitch-trim control wheel. | |
Subtask 27-41-00-860-055-A
A. Put the aircraft back to its initial configuration.
(1) Depressurize the Green and Yellow hydraulic systems (Ref. AMM TASK 29-23-00-864-001) and (Ref. AMM TASK 29-24-00-864-001).
(2) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(3) Make sure that the work area is clean and clear of tools and other items.
(4) Remove the access platform(s).
(5) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) Depressurize the Green and Yellow hydraulic systems (Ref. AMM TASK 29-23-00-864-001) and (Ref. AMM TASK 29-24-00-864-001).
(2) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(3) Make sure that the work area is clean and clear of tools and other items.
(4) Remove the access platform(s).
(5) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Lower Chain Dimension Adjustment