W DOC AIRBUS | AMM A320F

Adjustment of the Rudder Neutral Position


TASK 27-24-00-820-001-A
Adjustment of the Rudder Neutral Position


WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
WARNING: MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
CAUTION: DO THIS PROCEDURE IN A HANGAR IF THERE ARE WIND GUSTS. WIND GUSTS CAN CAUSE DAMAGE TO THE LINKAGE WHEN THE RIGGING PINS ARE IN POSITION ON THE RUDDER CONTROL.
ZONE: 325
1. Reason for the Job
NOTE: This task can contribute to fuel savings.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 10M (33 FT) - ADJUSTABLE
No specific
1
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
WARNING NOTICE(S)
98D27203001000
1
TOOL-RUDDER NEUTRAL ADJUSTMENT
98D27207516000
1
PIN-RIGGING,SET
OR
OR
98D27207546000
1
PIN-RIGGING
98D27303000001
1
LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER
 B. Consumable Materials
REFERENCE
DESIGNATION
No specific
lockwire - corrosion resistant steel dia. 0.8 mm (0.03 in.)
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
325
VERTICAL STABILIZER TRAILING EDGE
197CB, 197EB, 198CB, 325CL, 325CR, 325DL, 822
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 11-00-00-960-001-A
Replacement of the Tail Cone Reference Triangle
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 27-21-00-820-003-A
Adjustment of the Rudder Mechanical Control
TASK 27-24-00-710-001-A
Operational Test of the Rudder Hydraulic Actuation
TASK 27-25-00-820-001-A
Adjustment of the Rudder Position Indicating
TASK 29-10-00-863-003-A
Pressurize the Blue Hydraulic System with a Hydraulic Ground Power-Cart
TASK 29-10-00-863-003-A-01
Pressurize the Blue Hydraulic System with the Blue Electric Pump
TASK 29-10-00-864-003-A
Depressurize the Blue Hydraulic System
TASK 29-23-00-863-001-A
Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump
TASK 29-23-00-864-001-A
Depressurize the Green and Yellow Hydraulic Systems after Operation of the PTU
TASK 29-24-00-863-001-A
Pressurize the Yellow Hydraulic System with the Electric Pump
TASK 29-24-00-864-001-A
Depressurize the Yellow Hydraulic System
TASK 55-33-13-010-002-A
Opening/Removal of the Trailing Edge Access-Panels of the Vertical Stabilizer
TASK 55-33-13-410-002-A
Closing/Installation of the Trailing Edge Access-Panels of the Vertical Stabilizer
3. Job Set-up
Subtask 27-24-00-861-054-A ** ON A/C NOT FOR ALL
A. Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
Subtask 27-24-00-010-055-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 822.
   (2) Open the access door 822.
   (3) At the battery power center 105VU:
  • loosen the two screws and remove the protective cover.
Subtask 27-24-00-865-050-A ** ON A/C NOT FOR ALL
C. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B11
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B08
49VUAUTO FLT/FAC1/28VDC5CC1B04
49VUAUTO FLT/FAC1/26VAC14CC1B03
105VUFLIGHT CONTROLS/ELAC2/STBY SPLY16CE2A02
105VUFLT CTL/ELAC1/STBY SPLY16CE1A01
121VUAUTO FLT/RUDDER/TRIM/IND15CCM20
121VUAUTO FLT/FAC2/28VDC5CC2M19
121VUAUTO FLT/FAC2/26VAC14CC2M18
121VUFLIGHT CONTROLS/SEC3/SPLY21CE3Q19
121VUFLIGHT CONTROLS/SEC2/SPLY21CE2Q18
121VUFLIGHT CONTROLS/ELAC2/NORM/SPLY15CE2R20
Subtask 27-24-00-860-059-A ** ON A/C NOT FOR ALL
D. Aircraft Maintenance Configuration
   (1) Pressurize the aircraft hydraulic systems (Ref. AMM TASK 29-24-00-863-001) (Ref. AMM TASK 29-23-00-863-001) (Ref. AMM TASK 29-10-00-863-003).
   (2) On the overhead panel 23VU, make sure that:
  • the FLT CTL/FAC1, FLT CTL/ELAC1 and FLT CTL/SEC1 pushbutton switches are pushed (on these pushbutton switches, the FAULT and OFF legends are off).
   (3) On the overhead panel 24VU, make sure that:
  • the FLT CTL/FAC2, FLT CTL/ELAC2, FLT CTL/SEC2 and FLT CTL/SEC3 pushbutton switches are pushed (on these pushbutton switches, the FAULT and OFF legends are off).
   (4) On the center pedestal, on the panel 110VU, make sure that the RUD TRIM indicator shows 0.
   (5) Put the WARNING NOTICE(S) in the cockpit to tell persons not to operate the flight controls.
   (6) Depressurize the aircraft hydraulic systems
(Ref. AMM TASK 29-10-00-864-003) (Ref. AMM TASK 29-23-00-864-001) (Ref. AMM TASK 29-24-00-864-001).
Subtask 27-24-00-010-054-E ** ON A/C NOT FOR ALL
E. Get Access
   (1) Put an ACCESS PLATFORM 10M (33 FT) - ADJUSTABLE in position at zone 325.
   (2) Open the access panels 325CL 325CR 325DL (Ref. AMM TASK 55-33-13-010-002).
Subtask 27-24-00-860-053-A ** ON A/C NOT FOR ALL
F. Aircraft Maintenance Configuration
   (1) Install the 98D27207546000 PIN-RIGGING98D27207516000 PIN-RIGGING,SET (7) on the output bellcrank of the lower servocontrol (4).
     (a) If you cannot put the rigging pin in position easily, do the adjustment of the rudder mechanical control (Ref. AMM TASK 27-21-00-820-003).
   (2) Install the pointer of the 98D27303000001 LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER on the trailing edge of the rudder.
   (3) Pressurize the aircraft hydraulic systems (Ref. AMM TASK 29-24-00-863-001) (Ref. AMM TASK 29-23-00-863-001) (Ref. AMM TASK 29-10-00-863-003).
4. Procedure
Subtask 27-24-00-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Reference Triangle for the Rudder Neutral Position
NOTE: Do this installation only if the reference triangle on the tail cone is not in position.
NOTE: If the initial adjustment of two servocontrols at least is not changed, you can find the rudder neutral position without a tool.
If two or three servocontrols are not adjusted correctly, you must use the 98D27203001000 TOOL-RUDDER NEUTRAL ADJUSTMENT to find the rudder neutral position.
   (1) Find the rudder neutral position with two servocontrols adjusted correctly.
     (a) Pressurize one of the two servocontrols adjusted correctly.
       1 On the maintenance panel 50VU:
Make sure that the HYD/LEAK MEASUREMENT VALVES/ applicable pushbutton switch is pushed (on this pushbutton switch the OFF legend is off):
  • for the lower servocontrol (4): G pushbutton switch
  • for the middle servocontrol (3): Y pushbutton switch
  • for the upper servocontrol (2): B pushbutton switch.
       2 Release the two other HYD/LEAK MEASUREMENT VALVE pushbutton switches (on these pushbutton switches the OFF legends come on).
     (b) Make a mark on the tail cone structure to show the position of the rudder lower trailing edge.
     (c) Pressurize the other servocontrol adjusted correctly and depressurize the first one:
       1 On the maintenance panel 50VU:
Push the HYD/LEAK MEASUREMENT VALVES/ applicable pushbutton switch (on this pushbutton switch the OFF legend goes off):
  • for the lower servocontrol (4): G pushbutton switch
  • for the middle servocontrol (3): Y pushbutton switch
  • for the upper servocontrol (2): B pushbutton switch.
       2 Release the other HYD/LEAK MEASUREMENT VALVE pushbutton switch (on this pushbutton switch the OFF legend comes on).
     (d) Make sure that the rudder neutral position for this servocontrol is the same as the rudder neutral position for the other servocontrol. The rudder lower trailing-edge must be in line with the mark on the tail cone.
NOTE: If the rudder neutral position is the same for the two servocontrols, it is not necessary to use the 98D27203001000 TOOL-RUDDER NEUTRAL ADJUSTMENT.
If the rudder neutral position is not the same for the two servocontrols, you must use the 98D27203001000 TOOL-RUDDER NEUTRAL ADJUSTMENT.
   (2) Find the rudder neutral position with the 98D27203001000 TOOL-RUDDER NEUTRAL ADJUSTMENT:
F Installation of the Tool ** ON A/C NOT FOR ALL
     (a) Depressurize the aircraft hydraulic systems (Ref. AMM TASK 29-10-00-864-003) (Ref. AMM TASK 29-23-00-864-001) (Ref. AMM TASK 29-24-00-864-001).
     (b) Put the WARNING NOTICE(S) to tell persons not to pressurize the aircraft hydraulic systems:
  • on the overhead panel 40VU
  • on the ground service panels 197CB 198CB 197EB.
     (c) On the LH side of the rudder, put the 98D27203001000 TOOL-RUDDER NEUTRAL ADJUSTMENT in position.
     (d) Use the tool to make the reference mark on the tail cone. If necessary, remove all the other marks on the tail cone.
   (3) Install the new reference triangle (8) on the tail cone, put its center on the mark (Ref. AMM TASK 11-00-00-960-001).
   (4) Remove the 98D27203001000 TOOL-RUDDER NEUTRAL ADJUSTMENT (if applicable).
   (5) If necessary, remove the warning notices which tell persons not to pressurize the aircraft hydraulic systems.
   (6) If necessary, pressurize the aircraft hydraulic systems (Ref. AMM TASK 29-24-00-863-001) (Ref. AMM TASK 29-23-00-863-001).
Subtask 27-24-00-820-050-A ** ON A/C NOT FOR ALL
B. Adjustment of the Rudder Neutral Position with the reference triangle (8).
   (1) On the maintenance panel 50VU:
     (a) Release the HYD/LEAK MEASUREMENT VALVES/B and HYD/LEAK MEASUREMENT VALVES/Y pushbutton switches (on these pushbutton switches, the OFF legends come on).
     (b) Make sure that the HYD/LEAK MEASUREMENT VALVES/G pushbutton switch is pushed (on this pushbutton switch the OFF legend is off).
   (2) On the tail cone structure, make sure that the rudder lower trailing-edge is in line with the center of gravity of the reference triangle (8) or in the limits.
If not, do these operations:
     (a) Cut and remove the lockwire from the nuts of the spring rod (5).
     (b) Loosen the nuts.
     (c) Release the lockwashers.
     (d) Adjust the length of the spring rod (5).
     (e) Engage the lockwashers.
     (f) Tighten the nuts.
     (g) Make sure that the adjustment is correct after you have tightened the nuts.
     (h) Safety the nuts with lockwire - corrosion resistant steel dia. 0.8 mm (0.03 in.).
   (3) On the maintenance panel 50VU:
     (a) Push the HYD/LEAK MEASUREMENT VALVES/Y pushbutton switch (on this pushbutton switch the OFF legend goes off).
     (b) Release the HYD/LEAK MEASUREMENT VALVES/G pushbutton switch (on this pushbutton switch the OFF legend comes on).
   (4) On the tail cone structure make sure that the rudder lower trailing-edge is in line with the center of gravity of the reference triangle (8) or in the limits.
If not, do these operations:
     (a) Cut and remove the lockwire from the nuts of the spring rod (6).
     (b) Loosen the nuts.
     (c) Release the lockwashers.
     (d) Adjust the length of the spring rod (6).
NOTE: To adjust the clearance, turn the spring rod (6) in the same direction as the spring rod (5).
     (e) Engage the lockwashers.
     (f) Tighten the nuts.
     (g) Make sure that the adjustment is correct after you have tightened the nuts.
     (h) Safety the nuts with lockwire - corrosion resistant steel dia. 0.8 mm (0.03 in.).
   (5) On the maintenance panel 50VU:
     (a) Push the HYD/LEAK MEASUREMENT VALVES/B pushbutton switch (on this pushbutton switch the OFF legend goes off).
     (b) Release the HYD/LEAK MEASUREMENT VALVES/Y pushbutton switch (on this pushbutton switch the OFF legend comes on).
   (6) On the tail cone structure make sure that the rudder lower trailing-edge is in line with the center of gravity of the reference triangle (8) or in the limits.
If not, do these operations:
     (a) Cut and remove the lockwire from the nuts of the spring rod (1).
     (b) Loosen the nuts.
     (c) Release the lockwashers.
     (d) Adjust the length of the spring rod (1).
NOTE: To adjust the clearance, turn the spring rod (1) in the same direction as the spring rod (6).
     (e) Engage the lockwashers.
     (f) Tighten the nuts.
     (g) Make sure that the adjustment is correct after you have tightened the nuts.
     (h) Safety the nuts with lockwire - corrosion resistant steel dia. 0.8 mm (0.03 in.).
   (7) On the maintenance panel 50VU:
  • push the HYD/LEAK MEASUREMENT VALVES/Y and HYD/LEAK MEASUREMENT VALVES/G pushbutton switches (on these pushbutton switches, the OFF legends go off).
   (8) On the tail cone structure make sure that the rudder lower trailing-edge is in line with the center of gravity of the reference triangle (8) or in the limits.
If not, do the adjustment of the spring rods (1), (6) and (5) of the three servocontrols (2), (3) and (4).
   (9) Make sure that you can engage and disengage freely the rigging pin in the rudder position transducer unit.
5. Close-up
Subtask 27-24-00-860-054-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
   (1) Depressurize the aircraft hydraulic systems (Ref. AMM TASK 29-10-00-864-003) (Ref. AMM TASK 29-23-00-864-001) (Ref. AMM TASK 29-24-00-864-001).
   (2) Remove the pointer of the 98D27303000001 LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER from the trailing edge of the rudder.
   (3) Remove the 98D27207546000 PIN-RIGGING98D27207516000 PIN-RIGGING,SET (7) from the output bellcrank of the lower servocontrol (4).
F Rudder Control ** ON A/C NOT FOR ALL
Subtask 27-24-00-410-053-E ** ON A/C NOT FOR ALL
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the access panels 325CL 325CR 325DL (Ref. AMM TASK 55-33-13-410-002).
   (3) Install the protective cover on the battery power center 105VU.
   (4) Tighten the two screws.
   (5) Close the access door 822.
   (6) Remove the access platform(s).
   (7) Remove the WARNING NOTICE(S).
Subtask 27-24-00-710-052-A ** ON A/C NOT FOR ALL
C. Do the operational test of the rudder mechanical control (Ref. AMM TASK 27-24-00-710-001).
Subtask 27-24-00-862-053-A ** ON A/C NOT FOR ALL
D. De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.03.31 23:49:18 UTC