W DOC AIRBUS | AMM A320F

Opening/Removal of the Trailing Edge Access-Panels of the Vertical Stabilizer


TASK 55-33-13-010-002-A
Opening/Removal of the Trailing Edge Access-Panels of the Vertical Stabilizer


WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
WARNING: BEFORE YOU START WORK, YOU MUST PUT ON A SAFETY HARNESS AND ATTACH IT TO THE ACCESS PLATFORM. WITHOUT A SAFETY HARNESS, YOU CAN FALL. THIS CAN KILL YOU OR CAUSE YOU INJURY.
ZONE: 325
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
1
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
325
VERTICAL STABILIZER TRAILING EDGE
325BL, 325BR, 325CL, 325CR, 325DL, 325EL, 325ER
325FR, 325GR
325DR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
F Trailing Edge Access-Panels ** ON A/C NOT FOR ALL
F Trailing Edge Access-Panels ** ON A/C NOT FOR ALL
F Trailing Edge Access-Panels ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 55-33-13-865-056-A
A. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B11
49VUFLIGHT CONTROLS/THS/ACTR/MOT219CE2B09
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B08
49VUAUTO FLT/FAC1/28VDC5CC1B04
49VUAUTO FLT/FAC1/26VAC14CC1B03
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B06
49VUFLIGHT CONTROLS/THS/ACTR/MOT219CE2B04
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B03
49VUAUTO FLT/FAC1/28VDC5CC1H10
49VUAUTO FLT/FAC1/26VAC14CC1H09
** ON A/C ALL
105VUFLIGHT CONTROLS/ELAC2/STBY SPLY16CE2A02
105VUFLT CTL/ELAC1/STBY SPLY16CE1A01
105VUFLT CTL/SEC1/STBY SPLY22CEB01
121VUAUTO FLT/RUDDER/TRIM/IND15CCM20
121VUAUTO FLT/FAC2/28VDC5CC2M19
121VUAUTO FLT/FAC2/26VAC14CC2M18
121VUFLIGHT CONTROLS/SEC3/SPLY21CE3Q19
121VUFLIGHT CONTROLS/SEC2/SPLY21CE2Q18
121VUFLIGHT CONTROLS/THS ACTR/MOT319CE3Q17
121VUFLIGHT CONTROLS/THS ACTR/MOT119CE1Q16
121VUFLIGHT CONTROLS/ELAC2/NORM/SPLY15CE2R20
Subtask 55-33-13-864-052-A
B. Depressurize the Green, Yellow and Blue hydraulic systems (Ref. AMM TASK 29-00-00-864-001).
Subtask 55-33-13-941-052-A
C. Get Access
   (1) Put the rudder pedals in the neutral position.
   (2) Put the WARNING NOTICE(S) in position in the cockpit to tell persons not to operate the flight controls.
   (3) Put the ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE in position below zone 325.
4. Procedure
Subtask 55-33-13-020-051-A ** ON A/C NOT FOR ALL
A. Opening and Removal of the Trailing Edge Access-Panels of the Vertical Stabilizer
F Trailing Edge Access-Panels ** ON A/C NOT FOR ALL
NOTE: The vertical-stabilizer trailing-edge access-panels (1) are referred to in this procedure as "trailing edge access-panels” (1).
   (1) Open trailing edge access-panels 325BL, 325BR, 325CL, 325CR and 325DL (1):
NOTE: The opening procedure is given for one trailing edge access-panel (1). The opening procedure for the other trailing edge access-panels (1) is almost the same.
     (a) Release the applicable studs (2), (3) and (4).
     (b) Carefully open the trailing edge access-panel (1).
     (c) Remove the quick-release pin (14) from the hole (13) of the lever assembly (11).
     (d) Align the hole (12) of the trailing edge access-panel (1) with the hole (13) of the lever assembly (11).
     (e) Install the quick-release pin (14) through the two holes (12) and (13).
CAUTION: BE CAREFUL WHEN YOU REMOVE OR INSTALL THESE ACCESS PANELS. IF YOU LET THEM FALL, DAMAGE CAN OCCUR TO THEM OR TO THE AIRCRAFT STRUCTURE.
   (2) Remove trailing edge access-panels 325EL, 325ER and 325DR (1):
NOTE: The removal procedure is given for one trailing edge access-panel (1). The removal procedure for the other trailing edge access-panels (1) is almost the same.
     (a) Remove the studs (2), (3), (4), (5), (6) and (8), and, if applicable, the studs (7), (9) and (10).
     (b) Remove the trailing edge access-panel (1).
Subtask 55-33-13-020-051-B ** ON A/C NOT FOR ALL
A. Opening and Removal of the Trailing Edge Access-Panels of the Vertical Stabilizer
NOTE: The vertical-stabilizer trailing-edge access-panels (1) are referred to in this procedure as "trailing edge access-panels” (1).
   (1) Open trailing edge access-panels 325BL, 325BR, 325CL, 325CR and 325DL (1):
NOTE: The opening procedure is given for one trailing edge access-panel (1). The opening procedure for the other trailing edge access-panels (1) is almost the same.
     (a) Release the applicable quick-release fasteners (2) and (3), and, if applicable, the quick-release fasteners (4).
     (b) Carefully open the trailing edge access-panel (1).
     (c) Remove the quick-release pin (12) from the hole (11) of the lever assembly (9).
     (d) Align the hole (10) of the trailing edge access-panel (1) with the hole (11) of the lever assembly (9).
     (e) Install the quick-release pin (12) through the two holes (10) and (11).
CAUTION: BE CAREFUL WHEN YOU REMOVE OR INSTALL THESE ACCESS PANELS. IF YOU LET THEM FALL, DAMAGE CAN OCCUR TO THEM OR TO THE AIRCRAFT STRUCTURE.
   (2) Remove trailing edge access-panels 325EL, 325ER, 325FR and 325GR (1):
NOTE: The removal procedure is given for one trailing edge access-panel (1). The removal procedure for the other trailing edge access-panels (1) is almost the same.
     (a) Remove the screws (5), (7) and (8), and, if applicable, the screws (6).
     (b) Remove the trailing edge access-panel (1).
Subtask 55-33-13-020-051-D ** ON A/C NOT FOR ALL
A. Opening and Removal of the Trailing Edge Access-Panels of the Vertical Stabilizer
F Trailing Edge Access-Panels ** ON A/C NOT FOR ALL
NOTE: The vertical-stabilizer trailing-edge access-panels (1) are referred to in this procedure as "trailing edge access-panels” (1).
   (1) Open trailing edge access-panels 325BL, 325BR, 325CL, 325CR and 325DL (1):
NOTE: The opening procedure is given for one trailing edge access-panel (1). The opening procedure for the other trailing edge access-panels (1) is almost the same.
     (a) Release the applicable studs (2) and (3), and, if applicable, the studs (4).
     (b) Carefully open the trailing edge access-panel (1).
     (c) Remove the quick-release pin (11) from the hole (10) of the lever assembly (8).
     (d) Align the hole (9) of the trailing edge access-panel (1) with the hole (10) of the lever assembly (8).
     (e) Install the quick-release pin (11) through the two holes (9) and (10).
CAUTION: BE CAREFUL WHEN YOU REMOVE OR INSTALL THESE ACCESS PANELS. IF YOU LET THEM FALL, DAMAGE CAN OCCUR TO THEM OR TO THE AIRCRAFT STRUCTURE.
   (2) Remove trailing edge access-panels 325EL, 325ER and 325DR (1):
NOTE: The removal procedure is given for one trailing edge access-panel (1). The removal procedure for the other trailing edge access-panels (1) is almost the same.
     (a) Remove the studs (2), (3) and (4), and, if applicable, the studs (5), (6) and (7).
     (b) Remove the trailing edge access-panel (1).
Subtask 55-33-13-020-051-E ** ON A/C NOT FOR ALL
A. Opening and Removal of the Trailing Edge Access-Panels of the Vertical Stabilizer
F Trailing Edge Access-Panels ** ON A/C NOT FOR ALL
NOTE: The vertical-stabilizer trailing-edge access-panels (1) are referred to in this procedure as "trailing edge access-panels” (1).
   (1) Open trailing edge access-panels 325BL, 325BR, 325CL, 325CR and 325DL (1):
NOTE: The opening procedure is given for one trailing edge access-panel (1). The opening procedure for the other trailing edge access-panels (1) is almost the same.
     (a) Release the applicable studs (2) and (3), and, if applicable, studs (4).
     (b) Carefully open the trailing edge access-panel (1).
     (c) Remove the quick-release pin (12) from the hole (11) of the lever assembly (9).
     (d) Align the hole (10) of the trailing edge access-panel (1) with the hole (11) of the lever assembly (9).
     (e) Install the quick-release pin (12) through the two holes (10) and (11).
CAUTION: BE CAREFUL WHEN YOU REMOVE OR INSTALL THESE ACCESS PANELS. IF YOU LET THEM FALL, DAMAGE CAN OCCUR TO THEM OR TO THE AIRCRAFT STRUCTURE.
   (2) Remove trailing edge access-panels 325EL, 325ER and 325DR (1):
NOTE: The removal procedure is given for one trailing edge access-panel (1). The removal procedure for the other trailing edge access-panels (1) is almost the same.
     (a) Remove the screws (5), (7) and (8), and, if applicable, the screws (6).
     (b) Remove the trailing edge access-panel (1).
[Rev.10 from 2021] 2026.04.01 03:50:16 UTC