Detailed Inspection of EWIS Installed in the Upper Forward Pylon (EWIS)
TASK 24-92-00-220-001-A
Detailed Inspection of EWIS Installed in the Upper Forward Pylon (EWIS)
1. Reason for the Job
Refer to the MPD TASK: 200413-01
DETAILED INSPECTION OF EWIS INSTALLED IN THE UPPER FORWARD PYLON (EWIS)
Refer to the MPD TASK: 200413-03
DETAILED INSPECTION OF EWIS INSTALLED IN THE UPPER FORWARD PYLON (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 24-92-00-941-054-A ** ON A/C NOT FOR ALL
Subtask 24-92-00-220-051-A ** ON A/C NOT FOR ALL
Subtask 24-92-00-410-080-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:26:01 UTC
Detailed Inspection of EWIS Installed in the Upper Forward Pylon (EWIS)
1. Reason for the Job
Refer to the MPD TASK: 200413-01
DETAILED INSPECTION OF EWIS INSTALLED IN THE UPPER FORWARD PYLON (EWIS)
Refer to the MPD TASK: 200413-03
DETAILED INSPECTION OF EWIS INSTALLED IN THE UPPER FORWARD PYLON (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| No specific | AR | FLASHLIGHT |
| No specific | AR | MIRROR - INSPECTION, FLEXIBLE |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 413 | UPPER FWD PYLON |
| 414 | UPPER FWD PYLON |
| 423 | UPPER FWD PYLON |
| 424 | UPPER FWD PYLON |
| FOR [1000EM1] (ENGINE-1) | |
| 413AL, 413BL, 413CL, 414AZ | |
| 413DL, 413EL, 414AR, 414BR, 414CR, 414FR | |
| 413AR, 413BR, 413CR, 413DT, 471AL, 471AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 423AL, 423AZ, 423BL, 423CL | |
| 423DL, 423FL, 424AR, 424BR, 424CR, 424ER | |
| 423AR, 423BR, 423CR, 423DT, 481AL, 481AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 54-52-11-000-001-A | Removal of the Pressure Relief Doors |
| TASK 54-52-11-000-002-A | Removal of the Access Panels |
| TASK 54-52-11-000-002-B | Removal of the Access Panels |
| TASK 54-52-11-400-001-A | Installation of the Pressure Relief Doors |
| TASK 54-52-11-400-002-A | Installation of the Access Panels |
| TASK 54-52-11-400-002-B | Installation of the Access Panels |
| TASK 54-53-11-000-002-A | Removal of the Pylon-to-Wing Access Panels |
| TASK 54-53-11-000-002-B | Removal of the Pylon-to-Wing Access Panels |
| TASK 54-53-11-400-002-A | Installation of the Pylon-to-Wing Access Panels |
| TASK 54-53-11-400-002-B | Installation of the Pylon-to-Wing Access Panels |
| ESPM 2052120 | |
| AWM 940801 | |
| AWM 940802 | |
Subtask 24-92-00-941-054-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(3) On the overhead maintenance panel 50VU:
Subtask 24-92-00-862-070-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU:
- Put a WARNING NOTICE(S) in position to tell persons not to start the engine.
(3) On the overhead maintenance panel 50VU:
- Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
B. Make sure that the aircraft electrical circuits are de-energized
(Ref. AMM TASK 24-41-00-862-002).
Subtask 24-92-00-010-080-A ** ON A/C NOT FOR ALL (Ref. AMM TASK 24-41-00-862-002).
C. Get Access
(1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at the upper forward pylon.
(2) Remove these access panels (Ref. AMM TASK 54-52-11-000-001), (Ref. AMM TASK 54-52-11-000-002) and (Ref. AMM TASK 54-53-11-000-002):
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
Subtask 24-92-00-010-080-C ** ON A/C NOT FOR ALL (1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at the upper forward pylon.
(2) Remove these access panels (Ref. AMM TASK 54-52-11-000-001), (Ref. AMM TASK 54-52-11-000-002) and (Ref. AMM TASK 54-53-11-000-002):
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
C. Get Access
(1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at the upper forward pylon.
(2) Remove these access panels (Ref. AMM TASK 54-52-11-000-001), (Ref. AMM TASK 54-52-11-000-002) and (Ref. AMM TASK 54-53-11-000-002):
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
4. Procedure(1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at the upper forward pylon.
(2) Remove these access panels (Ref. AMM TASK 54-52-11-000-001), (Ref. AMM TASK 54-52-11-000-002) and (Ref. AMM TASK 54-53-11-000-002):
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
Subtask 24-92-00-220-051-A ** ON A/C NOT FOR ALL
A. Detailed Inspection of All the Wiring Installed in the Upper Forward Pylon
(1) Make sure that there is no hydraulic or fuel contamination.
5. Close-up(1) Make sure that there is no hydraulic or fuel contamination.
NOTE: This inspection is necessary to prevent contamination of the wiring routes immediately adjacent to the fuel and hydraulic areas.
(2) Do a detailed inspection of the wiring to make sure that there are no signs of ageing, deterioration, overheating, scaling and deformation ESPM 2052120. NOTE: For information:
- On the AC/DC feeder routes 1G and 2G, you can refer to the AWM 940801 and AWM 940802.
- On the engine control routes 1S and 2S, you can refer to the AWM 940801 and AWM 940802.
- On the other routes 1M and 2M, you can refer to the AWM 940801 and AWM 940802.
- On the generator excitation routes 1E and 2E, you can refer to the AWM 940801 and AWM 940802.
NOTE: Use a FLASHLIGHT or a MIRROR - INSPECTION, FLEXIBLE if necessary.
Subtask 24-92-00-410-080-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install these access panels (Ref. AMM TASK 54-52-11-400-001), (Ref. AMM TASK 54-52-11-400-002) and (Ref. AMM TASK 54-53-11-400-002):
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
Subtask 24-92-00-410-080-C ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install these access panels (Ref. AMM TASK 54-52-11-400-001), (Ref. AMM TASK 54-52-11-400-002) and (Ref. AMM TASK 54-53-11-400-002):
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install these access panels (Ref. AMM TASK 54-52-11-400-001), (Ref. AMM TASK 54-52-11-400-002) and (Ref. AMM TASK 54-53-11-400-002):
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install these access panels (Ref. AMM TASK 54-52-11-400-001), (Ref. AMM TASK 54-52-11-400-002) and (Ref. AMM TASK 54-53-11-400-002):
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
Upper Forward Pylon - Access Panels