W DOC AIRBUS | AMM A320F

Installation of the Oil Temperature Probe [PW11]


TASK 79-32-21-400-801-A
Installation of the Oil Temperature Probe


WARNING: BE CAREFUL WHEN YOU DO WORK ON THE ENGINE AND THE ADJACENT COMPONENTS AFTER ENGINE SHUTDOWN. THE ENGINE, THE ENGINE OIL AND THE ADJACENT COMPONENTS CAN STAY HOT FOR A LONG TIME. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY CAN OCCUR.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 4073KS ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
PLIERS - JAWED, SOFT
No specific
Torque wrench: range to between 30 and 26 lbf.in (0.34 and 0.29 m.daN ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.P03-001)
lubricant, aircraft turbine engine
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL, 438AR, 451AL
FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL, 448AR, 461AL
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
3
PACKING
EIPC 79-32-21-01-090
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 71-00-00-720-811-A
Test No. 3A - Idle Power Test
TASK 71-13-00-010-802-A
Opening of the Fan Cowl Doors
TASK 71-13-00-410-802-A
Closing of the Fan Cowl Doors
TASK 73-21-00-710-807-A
Test No.6 - EEC Operation Test (Idle Test)
TASK 73-25-34-400-802-A
Installation of the Engine Interface Unit (EIU)
TASK 78-30-00-040-805-A
Deactivation of the Thrust Reverser System for Ground Maintenance
TASK 78-30-00-440-805-A
Reactivation of the Thrust Reverser System after Ground Maintenance
TASK 78-36-00-010-802-A
Opening of the Thrust Reverser Cowl-Doors
TASK 78-36-00-410-802-A
Closing of the Thrust Reverser Cowl-Doors
TASK 79-00-00-610-801-A
Check and Fill the Engine Oil
3. Job Set-up
Subtask 79-32-21-941-051-A ** ON A/C NOT FOR ALL
A. Safety Precautions
   (1) Make sure that you did the procedure to prevent engine motoring and to stop the electrical supply to the Electronic Engine Control (EEC)
(Ref. AMM TASK 73-25-34-400-802).
Subtask 79-32-21-010-052-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-802):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL, 438AR
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL, 448AR
Subtask 79-32-21-040-051-A ** ON A/C NOT FOR ALL
C. Deactivation of the Thrust Reverser System for Maintenance
WARNING: YOU MUST DEACTIVATE THE THRUST REVERSER BEFORE YOU DO WORK ON OR AROUND IT. IF YOU DO NOT, THE THRUST REVERSER CAN OPERATE ACCIDENTALLY AND CAUSE AN INJURY AND/OR DAMAGE.
   (1) Make sure that you did the deactivation of the thrust reverser system for maintenance (Ref. AMM TASK 78-30-00-040-805).
Subtask 79-32-21-010-053-A ** ON A/C NOT FOR ALL
D. Get Access
   (1) Make sure that the left thrust reverser cowl-doors are open (Ref. AMM TASK 78-36-00-010-802):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL
4. Procedure
Subtask 79-32-21-420-050-A ** ON A/C NOT FOR ALL 5. Close-up
Subtask 79-32-21-410-052-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the left thrust reverser cowl-doors (Ref. AMM TASK 78-36-00-410-802):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL
Subtask 79-32-21-440-050-A ** ON A/C NOT FOR ALL
B. Do the reactivation of the thrust reverser system after maintenance (Ref. AMM TASK 78-30-00-440-805).
Subtask 79-32-21-410-053-A ** ON A/C NOT FOR ALL
C. Close Access
   (1) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-802):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR
   (2) Remove the WARNING NOTICE(S).
   (3) Make sure that all the circuit breakers shown in the paragraph Procedure of the engine interface unit installation are closed. If they are not, close them in the recommended sequence
(Ref. AMM TASK 73-25-34-400-802).
Subtask 79-32-21-720-050-A ** ON A/C NOT FOR ALL
D. Test
   (1) Do the test No. 3 - Idle power test (Ref. AMM TASK 71-00-00-720-811) and keep the engine at idle power for a total time of at least 10 minutes prior to shutdown the engine.
Subtask 79-32-21-710-050-A ** ON A/C NOT FOR ALL
E. Test
   (1) Do the test No. 6 - Electronic Engine Control (EEC) operation test (idle test) (Ref. AMM TASK 73-21-00-710-807).
[Rev.10 from 2021] 2026.04.01 13:09:07 UTC