W DOC AIRBUS | AMM A320F

Installation of the Throttle Control Lever Assembly [PW11]


TASK 76-11-41-400-802-A
Installation of the Throttle Control Lever Assembly


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 4 and 3 m.daN (29.50 and 22.12 lbf.ft ) T
98DNSA20208120
1
RIGGING PIN
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.05ABF1)
Retaining adhesive-Cylindrical fitting Medium strength Low viscosity -
(Material No.05BAE1)
Threadlocking Adhesive-- Medium strength -
(Material No.14QFB1)
Wire-Locking Dia: 0.8 mm CRES Nickel Alloy -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
811
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
86
LIGHTED LABEL
AIPC 33-13-88-03-110
30
COTTER PINS
AIPC 76-11-81-01-010
49
ADJUSTMENT BUSHING
AIPC 76-11-81-01-130
43
COTTER PINS
AIPC 76-11-81-01-230
72
COTTER PINS
AIPC 76-11-81-01-230
40
BEARING
AIPC 76-11-81-01-300
48
BEARING
AIPC 76-11-81-01-300
50
BEARING
AIPC 76-11-81-01-300
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 22-82-12-000-001-A
Removal of the Multipurpose Control & Display Unit (MCDU)
TASK 22-82-12-400-002-A
Installation of the Multipurpose Control & Display Unit (MCDU)
TASK 22-96-00-710-001-A
Operational Test of the AFS
TASK 22-97-00-710-001-A
Operational Test of the LAND CAT III Capability
TASK 23-13-13-000-001-A
Removal of the Radio Management Panel (RMP)
TASK 23-13-13-400-001-A
Installation of the Radio Management Panel (RMP)
TASK 23-51-12-000-001-A
Removal of the Audio Control Panel (ACP)
TASK 23-51-12-400-001-A
Installation of the Audio Control Panel (ACP)
TASK 27-41-41-400-001-A
Installation of the Control Mechanism-Pitch Trim
TASK 34-41-12-000-001-A
Removal of the Weather-Radar Control Unit
TASK 34-41-12-400-001-A
Installation of the Weather-Radar Control Unit
TASK 34-52-12-000-001-A
Removal of the ATC/TCAS Control Unit
TASK 34-52-12-400-001-A
Installation of the ATC/TCAS Control Unit
TASK 71-00-00-860-832-A
Procedure to Prevent Engine Motoring and to Stop the Electrical Supply to the EEC
TASK 73-25-34-400-802-A
Installation of the Engine Interface Unit (EIU)
3. Job Set-up
Subtask 76-11-41-860-053-A ** ON A/C NOT FOR ALL
A. Safety Precautions
   (1) Make sure that the WARNING NOTICE(S) is in position in the cockpit to tell persons not to move the slat and flap control lever.
   (2) Make sure that you did the procedure to prevent engine motoring and to stop the electrical supply to the Electronic Engine Control (EEC)
(Ref. AMM TASK 71-00-00-860-832)
   (3) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position.
   (4) Make sure that access door 811 is open.
   (5) Make sure that the Multipurpose Control and Display Units (MCDUs) (3CA1, 3CA2) (Ref. AMM TASK 22-82-12-000-001) are removed.
   (6) Make sure that the Radio Management Panels (RMPs) (1RG1, 1RG2) (Ref. AMM TASK 23-13-13-000-001) are removed.
   (7) Make sure that the Audio Control Panels (ACPs) (2RN1, 2RN2) (Ref. AMM TASK 23-51-12-000-001) are removed.
   (8) Make sure that the weather radar control unit (3SQ) (Ref. AMM TASK 34-41-12-000-001) is removed.
   (9) Make sure that the ATC/TCAS control unit (3SH) (Ref. AMM TASK 34-52-12-000-001) is removed.
   (10) Make sure that the FLOOD LT/INTEG LT panel 111VU and the FLOOD LT panel 112VU are removed.
   (11) Make sure that the throttle control levers are at idle (0 deg. TLA).
   (12) Make sure that the 98DNSA20208120 RIGGING PIN (11) is installed in the artificial feel unit.
Subtask 76-11-41-865-063-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B08
49VUAUTO FLT/FMGC/110CA1B02
49VULIGHTING/EMER LT/CKPT/DOME1LEH08
** ON A/C NOT FOR ALL
49VUENGINE/1 AND 2/IGN/SYS A1JHA03
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B03
49VUAUTO FLT/FMGC/110CA1H08
49VULIGHTING/EMER LT/CKPT/DOME1LEH06
** ON A/C NOT FOR ALL
105VUFLT CTL/SEC1/STBY SPLY22CEB01
121VUAUTO FLT/FMGC/210CA2M17
121VUENGINE/IGN/ENG2/SYS B3JH2P42
121VUENGINE/IGN/ENG1/SYS B3JH1P41
121VUFLIGHT CONTROLS/SEC3/SPLY21CE3Q19
121VUFLIGHT CONTROLS/SEC2/SPLY21CE2Q18
122VULIGHTING/INSTL LT/MAIN INST/PNL AND/PED4LFY04
122VULIGHTING/FLOOD/CTR INST/PNL2LEZ04
4. Procedure
Subtask 76-11-41-420-060-A ** ON A/C NOT FOR ALL
A. Installation of the Throttle Control Lever Assembly
   (1) On the bellcrank (55), install a new AIPC 76-11-81-01-300 BEARING (50).
   (2) On the bellcrank (41), install a new AIPC 76-11-81-01-300 BEARING (40), the spacer (47) and a new AIPC 76-11-81-01-300 BEARING (48).
   (3) Engage the shaft (54) and push it. At the same time install:
     (a) The bushing (53)
     (b) The bellcrank (55)
     (c) The adjustment bushing (49)
     (d) The bellcrank (41)
     (e) The bushing (39).
   (4) Push the shaft (54) and install the washer (38) and the nut (37).
   (5) TORQUE the nut (37) to between 4 and 3 m.daN (29.50 and 22.12 lbf.ft )
T.
   (6) Wirelock the nut (37).
WARNING: USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
     (a) Wirelock the nut (37) with a lockwire 14QFB1Wire-Locking Dia: 0.8 mm CRES Nickel Alloy -.
   (7) Remove the blanking caps from the connectors 2145VC and 2146VC.
   (8) Connect connectors 2145VC and 2146VC.
   (9) Install the clamps (82), the washers (81) and (83) and the screws (80).
   (10) Install the clamps (77), the washers (78) and (79) and the screw (76).
   (11) Install the rocker (57) and the pin (59).
   (12) Install the link (25), the bearing (65), the bushing (66), the screw (64), the bushing (61), the bearing (60), the washer (73) and the nut (74).
   (13) Install the two new AIPC 76-11-81-01-230 COTTER PINS (72).
   (14) Install the two forward covers (63) and the two aft covers (42).
   (15) Install the eight screws (46), the eight washers (45) and the eight nuts (44).
   (16) Install eight new
AIPC 76-11-81-01-230 COTTER PINS (43).
Subtask 76-11-41-220-054-A ** ON A/C NOT FOR ALL Subtask 76-11-41-420-061-A ** ON A/C NOT FOR ALL Subtask 76-11-41-420-062-A ** ON A/C NOT FOR ALL
D. Installation of the Levers
   (1) Install the lever (29). To do this, push the lever to connect the connector located inside, at the lever-to-bellcrank junction.
   (2) Apply Threadlocking Adhesive-- Medium strength - (Material No.
05BAE1) on the two screws (15).
   (3) Install the two screws (15) and the two hollow pins (13).
   (4) Assemble the trigger (27) and the link (25) with the pin (26).
   (5) Engage the trigger (27) in the lever (29) and install the hollow pin (24) and the screw (28).
   (6) Install the index (16) and the two screws (14).
   (7) Install the index (22) and the two screws (23).
   (8) Put the two control levers in the idle position (0 deg.TLA) and engage the two links.
   (9) If necessary, install two new bushings (33) on the screws (34) and bond them with Retaining adhesive-Cylindrical fitting Medium strength Low viscosity - (Material No.05ABF1) .
   (10) Install the two screws (34), washers (32) and nuts (31).
   (11) Install the two new AIPC 76-11-81-01-010 COTTER PINS (30).
Subtask 76-11-41-080-054-A ** ON A/C NOT FOR ALL
E. Remove the rigging pin (11) from the artificial feel unit.
5. Close-up
Subtask 76-11-41-410-058-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Install the pitch-trim control mechanism (
Ref. AMM TASK 27-41-41-400-001).
   (2) Install the plates (4) and (10).
F Ventilations Plates and Clamps ** ON A/C NOT FOR ALL
   (3) Install the screws (6) and the washers (5).
   (4) Install the clamps (9).
   (5) Install the ventilation plates (8).
   (6) Install the screws (7).
   (7) Install the FLOOD LT/INTEG LT panel 111VU and the FLOOD LT panel 112VU.
F Panels 111VU and 112VU ** ON A/C NOT FOR ALL
NOTE: The installation procedure is the same for the FLOOD LT/INTEG LT panel 111VU and the FLOOD LT panel 112VU.
     (a) Remove the blanking caps from the connectors (2) and (3).
     (b) Install the connector (2) on the panel (1).
     (c) Install the panel (1) on the structure.
     (d) Fully tighten the fasteners on the panel (1).
   (8) Install the Multipurpose Control and Display Units (MCDUs) (3CA1, 3CA2) (Ref. AMM TASK 22-82-12-400-002).
   (9) Install the Radio Management Panels (RMPs) (1RG1, 1RG2) (Ref. AMM TASK 23-13-13-400-001).
   (10) Install the Audio Control Panels (ACPs) (2RN1, 2RN2) (Ref. AMM TASK 23-51-12-400-001).
   (11) Install the weather radar control unit (3SQ) (Ref. AMM TASK 34-41-12-400-001).
   (12) Install the ATC/TCAS control unit (3SH) (Ref. AMM TASK 34-52-12-400-001).
Subtask 76-11-41-410-059-A ** ON A/C NOT FOR ALL
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the access platform(s).
   (3) Close access door 811.
   (4) Remove the WARNING NOTICE(S).
   (5) Make sure that all the circuit breakers shown in the paragraph Procedure of the engine interface unit installation are closed. If they are not, close them in the recommended sequence
(Ref. AMM TASK 73-25-34-400-802)
Subtask 76-11-41-865-064-A ** ON A/C NOT FOR ALL
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B08
49VULIGHTING/EMER LT/CKPT/DOME1LEH08
** ON A/C NOT FOR ALL
49VUENGINE/1 AND 2/IGN/SYS A1JHA03
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B03
49VULIGHTING/EMER LT/CKPT/DOME1LEH06
** ON A/C NOT FOR ALL
105VUFLT CTL/SEC1/STBY SPLY22CEB01
121VUENGINE/IGN/ENG2/SYS B3JH2P42
121VUENGINE/IGN/ENG1/SYS B3JH1P41
121VUFLIGHT CONTROLS/SEC3/SPLY21CE3Q19
121VUFLIGHT CONTROLS/SEC2/SPLY21CE2Q18
122VULIGHTING/INSTL LT/MAIN INST/PNL AND/PED4LFY04
122VULIGHTING/FLOOD/CTR INST/PNL2LEZ04
Subtask 76-11-41-710-056-A ** ON A/C NOT FOR ALL
D. Do the test that follows:
   (1) Do an operational test of the FLOOD LT/INTEG LT panel 111VU and the FLOOD LT panel 112VU.
     (a) Operate the light adjustment knobs of the FLOOD LT/INTEG LT panel 111VU and the FLOOD LT panel 112VU.
     (b) Make sure that the light intensity of the glareshield 13VU, F/O glareshield panel 130VU, CAPT glareshield panel 131VU and overhead control and indicating panel 48VU changes.
   (2) Do the operational test of the AFS (Ref. AMM TASK 22-96-00-710-001).
NOTE: If the aircraft is operated in CAT III conditions, do the operational test of the LAND CAT III capability (Ref. AMM TASK 22-97-00-710-001).
[Rev.10 from 2021] 2026.04.01 03:16:01 UTC