1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 23-13-00-710-001-A
Operational Test of the Radio Management Panel (RMP)
TASK 23-13-00-740-001-A
BITE Test of the Radio Management Panel (RMP)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
F RMP1 and 2 ** ON A/C NOT FOR ALL
F RMP1, 2 and 3 ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 23-13-13-865-051-A
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
FOR FIN: 1RG1 (RMPCOM/NAV FREQ SEL, 1)
49VUCOM/RMP/12RG1G10
FOR FIN: 1RG2 (RMPCOM/NAV FREQ SEL, 2)
121VUCOM NAV/RMP/22RG2L02
** ON A/C NOT FOR ALL
FOR FIN: 1RG3 (RMPCOM FREQ SEL, 3)
121VUCOM NAV/RMP/32RG3L03
4. Procedure
Subtask 23-13-13-420-050-A
A. Installation of the RMP
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Remove the blanking caps from the plug (4) and the receptacle (3).
   (4) Make sure that the plug (4) and the receptacle (3) are clean and in the correct condition.
   (5) Connect the plug (4) to the receptacle (3).
   (6) Install the RMP (2) in its housing.
   (7) Tighten the fasteners (1) a quarter turn.
Subtask 23-13-13-865-056-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
FOR FIN: 1RG1 (RMPCOM/NAV FREQ SEL, 1)
49VUCOM/RMP/12RG1G10
FOR FIN: 1RG2 (RMPCOM/NAV FREQ SEL, 2)
121VUCOM NAV/RMP/22RG2L02
** ON A/C NOT FOR ALL
FOR FIN: 1RG3 (RMPCOM FREQ SEL, 3)
121VUCOM NAV/RMP/32RG3L03
Subtask 23-13-13-740-050-A
C. Do the BITE test of the RMP (Ref. AMM TASK 23-13-00-740-001).
NOTE: As an alternative procedure, you can do the operational test without the Centralized Fault Display System (CFDS) (Ref. AMM TASK 23-13-00-710-001).
5. Close-up
Subtask 23-13-13-860-050-A
A. Make sure that the work area is clean and clear of tools and other items.
   (1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002)
[Rev.10 from 2021] 2026.04.01 04:40:03 UTC