Installation of the T25 Sensor [CFML]
TASK 73-21-20-400-802-A
Installation of the T25 Sensor
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 73-21-20-941-055-A
Subtask 73-21-20-420-053-A
Subtask 73-21-20-010-067-A
[Rev.10 from 2021]
2026.04.01 03:04:34 UTC
Installation of the T25 Sensor
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 4083KS
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 121 and 109 lbf.in (1.37 and 1.23 m.daN ) ![]() |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.CP2101) | Graphite mineral vaseline |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1) | |
| 437AL, 438AR, 452AR | |
| FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2) | |
| 447AL, 448AR, 462AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 70-70-00-910-804-A | Electrical Standard Practices |
| TASK 71-13-00-010-803-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-803-A | Closing of the Fan Cowl Doors |
| TASK 72-24-01-400-801-A | Installation of Segment Shrouds 1 thru 5 |
| TASK 72-24-80-400-801-A | Installation of the Variable Bleed Valve (VBV) Ducts |
| TASK 73-29-00-710-802-A | FADEC Test (Menu Mode) |
| TASK 78-30-00-040-809-A | Deactivation of the Thrust Reverser System for Ground Maintenance |
| TASK 78-30-00-440-809-A | Reactivation of the Thrust Reverser System after Ground Maintenance |
| TASK 78-36-00-010-806-A | Opening of the Thrust Reverser Cowl Doors |
| TASK 78-36-00-410-806-A | Closing of the Thrust Reverser Cowl Doors |
Subtask 73-21-20-941-055-A
A. Safety Precautions
(1) On the center pedestal, on ENG panel 115VU:
(a) Make sure that the ENG/MODE selector switch is in the NORM position.
(b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
(c) Make sure that the WARNING NOTICE(S) is in position to tell persons not to operate:
(a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
(b) Make sure that the WARNING NOTICE(S) is in position to tell persons not to energize FADEC 1(2).
Subtask 73-21-20-010-065-A (1) On the center pedestal, on ENG panel 115VU:
(a) Make sure that the ENG/MODE selector switch is in the NORM position.
(b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
(c) Make sure that the WARNING NOTICE(S) is in position to tell persons not to operate:
- The ENG/MODE selector switch, and
- The ENG/MASTER 1(2) control switch.
(a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
(b) Make sure that the WARNING NOTICE(S) is in position to tell persons not to energize FADEC 1(2).
B. Get Access
(1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-803):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL 448AR
Subtask 73-21-20-040-057-A (1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-803):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL 448AR
C. Deactivation of the Thrust Reverser System for Maintenance
Subtask 73-21-20-010-066-A WARNING:
YOU MUST DEACTIVATE THE THRUST REVERSER BEFORE YOU DO WORK ON OR AROUND IT. IF YOU DO NOT, THE THRUST REVERSER CAN OPERATE ACCIDENTALLY AND CAUSE AN INJURY AND/OR DAMAGE.
(1) Make sure that you did the deactivation of the thrust reverser system for maintenance (Ref. AMM TASK 78-30-00-040-809). D. Get Access
(1) Make sure that the right thrust reverser cowl-doors are open (Ref. AMM TASK 78-36-00-010-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
462AR
4. Procedure(1) Make sure that the right thrust reverser cowl-doors are open (Ref. AMM TASK 78-36-00-010-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
462AR
Subtask 73-21-20-420-053-A
A. Installation of the T25 Sensor
(1) Remove all the COVER - PROTECTION and CAP - PROTECTION from the openings, tubes, hoses and connectors.
(2) Put the T25 sensor (2) in position on the fan hub frame (1).
(3) Apply a thin layer of Graphite mineral vaseline (Material No.CP2101) on the threads of the three captive bolts (3).
(4) Install the three captive bolts (3) that attach the T25 sensor (2) to the fan hub frame (1).
(5) TORQUE the three captive bolts (3) to between 121 and 109 lbf.in (1.37 and 1.23 m.daN )
.
(6) Connect the channel A electrical connector (4) and the channel B electrical connector (5) to the T25 sensor (2) (Ref. AMM TASK 70-70-00-910-804).
(7) Install the Variable Bleed valve (VBV) duct 3 (Ref. AMM TASK 72-24-80-400-801).
(8) Install the segment shroud 2 (Ref. AMM TASK 72-24-01-400-801).
5. Close-up(1) Remove all the COVER - PROTECTION and CAP - PROTECTION from the openings, tubes, hoses and connectors.
(2) Put the T25 sensor (2) in position on the fan hub frame (1).
(3) Apply a thin layer of Graphite mineral vaseline (Material No.CP2101) on the threads of the three captive bolts (3).
(4) Install the three captive bolts (3) that attach the T25 sensor (2) to the fan hub frame (1).
(5) TORQUE the three captive bolts (3) to between 121 and 109 lbf.in (1.37 and 1.23 m.daN )
. (6) Connect the channel A electrical connector (4) and the channel B electrical connector (5) to the T25 sensor (2) (Ref. AMM TASK 70-70-00-910-804).
(7) Install the Variable Bleed valve (VBV) duct 3 (Ref. AMM TASK 72-24-80-400-801).
(8) Install the segment shroud 2 (Ref. AMM TASK 72-24-01-400-801).
Subtask 73-21-20-010-067-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the right thrust reverser cowl-doors (Ref. AMM TASK 78-36-00-410-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
462AR
Subtask 73-21-20-040-058-A Subtask 73-21-20-710-053-A Subtask 73-21-20-010-068-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the right thrust reverser cowl-doors (Ref. AMM TASK 78-36-00-410-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
462AR
T25 Sensor