Installation of the Upper HP Duct and Mid Stage T-Duct Assembly Links
TASK 36-11-49-400-842-A
Installation of the Upper HP Duct and Mid Stage T-Duct Assembly Links
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 36-11-49-860-144-A ** ON A/C NOT FOR ALL
Subtask 36-11-49-420-171-A ** ON A/C NOT FOR ALL
Subtask 36-11-49-410-238-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:10:55 UTC
Installation of the Upper HP Duct and Mid Stage T-Duct Assembly Links
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
ZONE: 400
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.CP8001) | lockwire 0.032 in. (0.8 mm) dia. |
| (Material No.CP8002) | lockwire 0.032 in. (0.8 mm) dia |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 400 | POWER PLANT, NACELLES AND PYLONS |
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR, 461AL, 462AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 49-00-00-860-006-A | APU Shutdown by External Power |
| TASK 49-00-00-860-006-A-01 | APU Shutdown by Batteries |
| TASK 49-00-00-860-009-A | APU Shutdown by External Power (131-9(A)) |
| TASK 49-00-00-860-009-A-01 | APU Shutdown by Batteries (131-9(A)) |
| TASK 78-30-00-081-041-B | Make the Thrust Reverser Serviceable after Maintenance |
| TASK 78-30-00-481-041-B | Make the Thrust Reverser Unserviceable for Maintenance |
| FOR [1000EM1] (ENGINE-1) | |
| TASK 71-13-00-010-040-B | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-B | Closing of the Fan Cowl Doors |
| TASK 78-36-00-010-040-B | Opening of the Thrust Reverser Doors |
| TASK 78-36-00-410-040-B | Closing of the Thrust Reverser Doors |
| FOR [1000EM2] (ENGINE-2) | |
| TASK 71-13-00-010-040-B | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-B | Closing of the Fan Cowl Doors |
| TASK 78-36-00-010-040-B | Opening of the Thrust Reverser Doors |
| TASK 78-36-00-410-040-B | Closing of the Thrust Reverser Doors |
Subtask 36-11-49-860-144-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
Subtask 36-11-49-941-164-A ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
B. Safety Precautions
(1) Make sure that the engine 1(2) shutdown occurred for not less than five minutes before you do this procedure.
(2) On AIR COND panel 30VU:
Subtask 36-11-49-865-257-A ** ON A/C NOT FOR ALL (1) Make sure that the engine 1(2) shutdown occurred for not less than five minutes before you do this procedure.
(2) On AIR COND panel 30VU:
- Make sure that the ENG 1(2) BLEED pushbutton switch is released (the OFF legend is on)
- Make sure that the APU BLEED pushbutton switch is released (the ON legend is off)
- Put a WARNING NOTICE(S) in position to tell persons not to operate the pneumatic system.
- Put a WARNING NOTICE(S) in position to tell persons not to start the engine 1(2).
- Put a WARNING NOTICE(S) in position to tell persons not to pressurize the pneumatic system.
- Make sure that the ON legend of the ENG/FADEC GND PWR 1(2) pushbutton switch is off
- Put a WARNING NOTICE(S) in position to tell persons not to energize the FADEC 1(2).
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 36-11-49-010-322-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 1000EM1 (ENGINE1) | |||
| 49VU | AIR BLEED/ENG 1/CTL | 3HA1 | D12 |
| 49VU | AIR BLEED/ENG 1/MONG | 2HA1 | D11 |
| FOR FIN: 1000EM2 (ENGINE2) | |||
| 122VU | AIR BLEED/ENG 2/CTL | 3HA2 | Z23 |
| 122VU | AIR BLEED/ENG 2/MONG | 2HA2 | Z22 |
D. Get Access
(1) Make sure that the fan cowl doors are open:
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
Subtask 36-11-49-040-198-A ** ON A/C NOT FOR ALL (1) Make sure that the fan cowl doors are open:
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
E. Deactivation of the Thrust Reverser (T/R) System
Subtask 36-11-49-010-326-A ** ON A/C NOT FOR ALL WARNING:
YOU MUST DEACTIVATE THE THRUST REVERSER BEFORE YOU DO WORK ON OR AROUND IT. IF YOU DO NOT, THE THRUST REVERSER CAN OPERATE ACCIDENTALLY AND CAUSE AN INJURY AND/OR DAMAGE.
(1) Make sure that the T/R is unserviceable for maintenance (Ref. AMM TASK 78-30-00-481-041). F. Get Access
(1) Make sure that the T/R doors are open:
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
(2) Make sure that the ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE is in position below the engine.
4. Procedure(1) Make sure that the T/R doors are open:
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
(2) Make sure that the ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE is in position below the engine.
Subtask 36-11-49-420-171-A ** ON A/C NOT FOR ALL
A. Installation of the Upper HP Duct Links
PRE SB RA32036-10
(1) If you use the APU to energize the electrical circuits, stop the APU:
(a) Make sure that the pressure and the temperature of the bleed-air duct system are in ambient conditions.
(a) Adjust the link (2) to approximately 3.3 in. (83.82 mm) between hole centers.
(d) Adjust the link (2) to permit the bolt to enter without binding.
(e) TORQUE the adjustment nut (11) on the support link to between 60 and 54 lbf.in (0.68 and 0.61 m.daN )
.
CP8001 lockwire 0.032 in. (0.8 mm) dia. or CP8002 lockwire 0.032 in. (0.8 mm) dia
(g) Install the link (2) on the bracket (6) with the bolt (9), bushing (7), washer (8) and nut (10).
.
(j) Adjust the link (3) to approximately 2.62 in. (66.55 mm) between hole centers.
(m) Adjust the link (3) to permit the bolt to enter without binding.
(n) TORQUE the adjustment nut (11) on the support link to between 60 and 54 lbf.in (0.68 and 0.61 m.daN )
.
CP8001 lockwire 0.032 in. (0.8 mm) dia. or CP8002 lockwire 0.032 in. (0.8 mm) dia .
(p) Install the link (3) on the bracket (12) with the bolt (9), bushing (7), washer (8) and nut (10).
.
END PRE SB RA32036-10
POST SB RA32036-10
(4) Install the upper HP duct link (2) on the bracket (5) at STA. 239 as follows:
(a) Adjust the link (2) to approximately 3.3 in. (83.82 mm) between hole centers.
(d) Adjust the link (2) to permit the bolt to enter without binding.
(e) TORQUE the adjustment nut (10) on the support link to between 60 and 54 lbf.in (0.68 and 0.61 m.daN )
.
CP8001 lockwire 0.032 in. (0.8 mm) dia. or CP8002 lockwire 0.032 in. (0.8 mm) dia .
(g) Install the link (2) on the bracket (5) with the bolt (8), bushing (6), washer (7) and nut (9).
.
END POST SB RA32036-10
Subtask 36-11-49-420-172-A ** ON A/C NOT FOR ALL PRE SB RA32036-10
(1) If you use the APU to energize the electrical circuits, stop the APU:
- For GTCP 36-300 APU (Ref. AMM D/O 49-00-00-86)
- For APS 3200 APU (Ref. AMM TASK 49-00-00-860-006)
- For 131-9(A) APU (Ref. AMM TASK 49-00-00-860-009).
(a) Make sure that the pressure and the temperature of the bleed-air duct system are in ambient conditions.
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE UNIT UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
(3) Install the upper HP duct links (2) and (3) on the brackets (6) and (12) at STA. 239 and STA. 233 as follows: (a) Adjust the link (2) to approximately 3.3 in. (83.82 mm) between hole centers.
NOTE: This value is nominal. You can adjust it to facilitate the assembly of the duct.
(b) Temporarily install the link (2) on the bracket (6) with the bolt (9), bushing (7), washer (8) and nut (10). NOTE: Make sure the countersunk side of the washer (8) is against the bolt (9) head.
(c) Temporarily attach the link (2) to the upper HP duct with the bolt (5), washer (4) and nut (1). (d) Adjust the link (2) to permit the bolt to enter without binding.
(e) TORQUE the adjustment nut (11) on the support link to between 60 and 54 lbf.in (0.68 and 0.61 m.daN )
. WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(f) Safety the nut (11) with (g) Install the link (2) on the bracket (6) with the bolt (9), bushing (7), washer (8) and nut (10).
NOTE: Make sure the countersunk side of the washer (8) is against the bolt (9) head.
(h) Attach the link (2) to the upper HP duct with the bolt (5), washer (4) and nut (1). NOTE: Make sure the countersunk side of the washer (4) is against the bolt (5) head.
(i) TORQUE the nuts (1) and (10) to between 90 and 75 lbf.in (1.02 and 0.85 m.daN )
. (j) Adjust the link (3) to approximately 2.62 in. (66.55 mm) between hole centers.
NOTE: This value is nominal. You can adjust it to facilitate the assembly of the duct.
(k) Install the link (3) on the bracket (12) with the bolt (9), bushing (7), washer (8) and nut (10) temporarily. NOTE: Make sure the countersunk side of the washer (8) is against the bolt (9) head.
(l) Attach the link (3) to the upper HP duct with the bolt (5), washer (4) and nut (1) temporarily. (m) Adjust the link (3) to permit the bolt to enter without binding.
(n) TORQUE the adjustment nut (11) on the support link to between 60 and 54 lbf.in (0.68 and 0.61 m.daN )
. WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(o) Safety the nut (11) with (p) Install the link (3) on the bracket (12) with the bolt (9), bushing (7), washer (8) and nut (10).
NOTE: Make sure the countersunk side of the washer (8) is against the bolt (9) head.
(q) Attach the link (3) to the upper HP duct with the bolt (5), washer (4) and nut (1). NOTE: Make sure the countersunk side of the washer (4) is against the bolt (5) head.
(r) TORQUE the nuts (1) and (10) to between 90 and 75 lbf.in (1.02 and 0.85 m.daN )
. END PRE SB RA32036-10
POST SB RA32036-10
(4) Install the upper HP duct link (2) on the bracket (5) at STA. 239 as follows:
(a) Adjust the link (2) to approximately 3.3 in. (83.82 mm) between hole centers.
NOTE: This value is nominal. You can adjust it to facilitate the assembly of the duct.
(b) Install the link (2) on the bracket (5) with the bolt (8), bushing (6), washer (7) and nut (9) temporarily. NOTE: Make sure the countersunk side of the washer (7) is against the bolt (8) head.
(c) Attach the link (2) to the upper HP duct with the bolt (3), washer (4) and nut (1) temporarily. (d) Adjust the link (2) to permit the bolt to enter without binding.
(e) TORQUE the adjustment nut (10) on the support link to between 60 and 54 lbf.in (0.68 and 0.61 m.daN )
. WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(f) Safety the nut (10) with (g) Install the link (2) on the bracket (5) with the bolt (8), bushing (6), washer (7) and nut (9).
NOTE: Make sure the countersunk side of the washer (7) is against the bolt (8) head.
(h) Attach the link (2) to the upper HP duct with the bolt (3), washer (4) and nut (1). NOTE: Make sure the countersunk side of the washer (4) is against the bolt (3) head.
(i) TORQUE the nuts (1) and (9) to between 90 and 75 lbf.in (1.02 and 0.85 m.daN )
. END POST SB RA32036-10
B. Installation of the Mid Stage T-Duct Assembly Links
(1) Install the mid stage T links (5) and (4) on the brackets (7) and (12) at STA. 215 as follows:
(a) Adjust the link (5) to approximately 8.2 in. (208.28 mm) between hole centers.
(b) Install the link (5) on the bracket (7) with the bolt (10), bushing (8), washer (9) and nut (6).
(d) Install the link (4) on the bracket (12) with the bolt (10), bushing (8), washer (9) and nut (6).
(3) Hold the eyebolts on the links (5) and (4) in position and TORQUE the adjustment nut (11) on the support link to between 60 and 54 lbf.in (0.68 and 0.61 m.daN )
. Safety the nut (11) with CP8001 lockwire 0.032 in. (0.8 mm) dia. or CP8002 lockwire 0.032 in. (0.8 mm) dia .
(4) Attach the links (5) and (4) to the T-duct with the bolts (3), washers (2) and nuts (1).
.
5. Close-up(1) Install the mid stage T links (5) and (4) on the brackets (7) and (12) at STA. 215 as follows:
(a) Adjust the link (5) to approximately 8.2 in. (208.28 mm) between hole centers.
(b) Install the link (5) on the bracket (7) with the bolt (10), bushing (8), washer (9) and nut (6).
NOTE: Make sure the countersunk side of the washer (9) is against the bolt (10) head.
(c) Adjust the link (4) to approximately 3.86 in. (98.04 mm) between hole centers. (d) Install the link (4) on the bracket (12) with the bolt (10), bushing (8), washer (9) and nut (6).
NOTE: Make sure the countersunk side of the washer (9) is against the bolt (10) head.
(2) Attach the links (5) and (4) to the T-duct with the bolts (3), washers (2) and nuts (1). If necessary, loosen the locknut and adjust the links (5) and (4) to permit the bolts (3) to enter without binding. (3) Hold the eyebolts on the links (5) and (4) in position and TORQUE the adjustment nut (11) on the support link to between 60 and 54 lbf.in (0.68 and 0.61 m.daN )
. Safety the nut (11) with (4) Attach the links (5) and (4) to the T-duct with the bolts (3), washers (2) and nuts (1).
NOTE: Make sure the countersunk side of the washer (2) is against the bolt (3) head.
(5) TORQUE the nuts (1) and (6) to between 90 and 75 lbf.in (1.02 and 0.85 m.daN )
. Subtask 36-11-49-410-238-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Remove the access platform(s).
(2) Close the T/R doors:
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
Subtask 36-11-49-440-139-A ** ON A/C NOT FOR ALL (1) Remove the access platform(s).
(2) Close the T/R doors:
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
B. Reactivation of the T/R System
(1) Make the T/R serviceable after maintenance (Ref. AMM TASK 78-30-00-081-041).
Subtask 36-11-49-410-239-A ** ON A/C NOT FOR ALL (1) Make the T/R serviceable after maintenance (Ref. AMM TASK 78-30-00-081-041).
C. Close Access
(1) Close the fan cowl doors:
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
(2) Remove the WARNING NOTICE(S).
Subtask 36-11-49-865-258-A ** ON A/C NOT FOR ALL (1) Close the fan cowl doors:
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
(2) Remove the WARNING NOTICE(S).
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 36-11-49-862-129-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 1000EM1 (ENGINE1) | |||
| 49VU | AIR BLEED/ENG 1/CTL | 3HA1 | D12 |
| 49VU | AIR BLEED/ENG 1/MONG | 2HA1 | D11 |
| FOR FIN: 1000EM2 (ENGINE2) | |||
| 122VU | AIR BLEED/ENG 2/CTL | 3HA2 | Z23 |
| 122VU | AIR BLEED/ENG 2/MONG | 2HA2 | Z22 |
E. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002) or or (Ref. AMM TASK 24-41-00-862-002).
(Ref. AMM TASK 24-41-00-862-002) or or (Ref. AMM TASK 24-41-00-862-002).