Installation of the Park Brake - Pressure Switch
TASK 32-45-17-400-001-A
Installation of the Park Brake - Pressure Switch
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Expendable Parts
D. Referenced Information
3. Job Set-up
Subtask 32-45-17-860-051-A ** ON A/C NOT FOR ALL
Subtask 32-45-17-420-050-A ** ON A/C NOT FOR ALL
Subtask 32-45-17-410-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 12:32:19 UTC
Installation of the Park Brake - Pressure Switch
WARNING:
MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
WORK ON THE HYDRAULIC SYSTEMS CAN BE DANGEROUS.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 86GG ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.02ABA1) | Phosphate Ester Hydraulic Fluid-General Power - - |
| (Material No.14QFB1) | Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 11 | PACKING | AIPC 32-45-03-03-340 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-12-29-611-001-A | Fill the Hydraulic Fluid Reservoir with a Hand Pump |
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-10-00-864-002-A | Depressurize the Yellow Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-23-00-860-001-A | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 29-23-00-860-002-A | Connection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
| TASK 32-43-00-710-001-A | Operational Check of Alternate Braking System |
| TASK 32-43-00-870-002-A | Bleeding of the High Pressure Alternate Braking System |
| TASK 32-45-00-710-001-A | Operational Check of the Parking Brake System |
| TASK 51-75-13-916-002-A | Repair to a layer of Corrosion Preventive Compound |
Subtask 32-45-17-860-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the PTU isolation coupling is disconnected (Ref. AMM TASK 29-23-00-860-001).
(3) Make sure that the Yellow hydraulic system is depressurized (Ref. AMM TASK 29-10-00-864-002).
(4) Make sure that the reservoir of the Yellow hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
(5) Make sure that the right MLG door is open (Ref. AMM TASK 32-12-00-010-001).
(6) Make sure that the CONTAINER 2 L (0.53 USGAL) is in position below the pressure switch (4).
(7) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position.
Subtask 32-45-17-865-051-A ** ON A/C NOT FOR ALL (1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the PTU isolation coupling is disconnected (Ref. AMM TASK 29-23-00-860-001).
(3) Make sure that the Yellow hydraulic system is depressurized (Ref. AMM TASK 29-10-00-864-002).
(4) Make sure that the reservoir of the Yellow hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
(5) Make sure that the right MLG door is open (Ref. AMM TASK 32-12-00-010-001).
(6) Make sure that the CONTAINER 2 L (0.53 USGAL) is in position below the pressure switch (4).
(7) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 32-45-17-941-051-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | L/G/Y BRK/PRESS/IND | 61GG | C10 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY | 4GG | M36 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/CTL | 3GG | M35 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/CTL | 1GG | M34 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY | 2GG | M33 |
| 121VU | HYDRAULIC/PARK BRK/CTL/STBY | 71GG | N37 |
| 121VU | HYDRAULIC/PARK BRK/CTL/NORM | 70GG | N36 |
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| 121VU | HYDRAULIC/Y HYD/PUMP ENG2/MONG | 3700GD | Q37 |
| 121VU | HYDRAULIC/Y HYD/PUMP ENG2/CTL | 3701GD | Q36 |
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
C. Safety Precautions
(1) Make sure that the WARNING NOTICE(S) are in position to tell persons not to pressurize the Yellow hydraulic system:
4. Procedure(1) Make sure that the WARNING NOTICE(S) are in position to tell persons not to pressurize the Yellow hydraulic system:
- On panel 40VU in the cockpit,
- On the ground service panel of the Yellow hydraulic system.
Subtask 32-45-17-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Park Brake-Pressure Switch 86GG
(1) Remove the PLUG-BLANKING from each disconnected line end.
(2) Make sure that the hydraulic line end-fittings are serviceable.
(3) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
(4) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the new packing (11) and to the threads of the park brake-pressure switch (4).
(5) Install the new AIPC 32-45-03-03-340 PACKING (11) on the park brake-pressure switch (4).
(6) Install the park brake-pressure switch (4) in the union (1).
(7) TORQUE the park brake-pressure switch (4) to between 7.95 and 7.85 m.daN (58.63 and 57.89 lbf.ft )
.
(8) Put the bonding strap (8) in position on the clamp (9) and install the:
(10) Make sure that all the electrical connections are clean and in the correct condition.
14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - (10).
Subtask 32-45-17-860-052-A ** ON A/C NOT FOR ALL (1) Remove the PLUG-BLANKING from each disconnected line end.
(2) Make sure that the hydraulic line end-fittings are serviceable.
(3) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
(4) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the new packing (11) and to the threads of the park brake-pressure switch (4).
(5) Install the new AIPC 32-45-03-03-340 PACKING (11) on the park brake-pressure switch (4).
(6) Install the park brake-pressure switch (4) in the union (1).
(7) TORQUE the park brake-pressure switch (4) to between 7.95 and 7.85 m.daN (58.63 and 57.89 lbf.ft )
. (8) Put the bonding strap (8) in position on the clamp (9) and install the:
- washer (7), bolt (6), washer (3) and the nut (2) (Ref. AMM TASK 20-28-00-912-802).
(10) Make sure that all the electrical connections are clean and in the correct condition.
CAUTION:
MAKE SURE THAT THE BONDING STRAP(S) IS(ARE) CONNECTED BEFORE YOU CONNECT THE ELECTRICAL CONNECTOR(S).
(11) Install the electrical connector (5). WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(12) Safety the park brake-pressure switch (4) with B. Preparation for Test
(1) Remove the WARNING NOTICE(S).
(2) Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
Subtask 32-45-17-865-052-A ** ON A/C NOT FOR ALL (1) Remove the WARNING NOTICE(S).
(2) Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 32-45-17-870-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | L/G/Y BRK/PRESS/IND | 61GG | C10 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY | 4GG | M36 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/CTL | 3GG | M35 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/CTL | 1GG | M34 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY | 2GG | M33 |
| 121VU | HYDRAULIC/PARK BRK/CTL/STBY | 71GG | N37 |
| 121VU | HYDRAULIC/PARK BRK/CTL/NORM | 70GG | N36 |
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| 121VU | HYDRAULIC/Y HYD/PUMP ENG2/MONG | 3700GD | Q37 |
| 121VU | HYDRAULIC/Y HYD/PUMP ENG2/CTL | 3701GD | Q36 |
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
D. Bleeding of the Braking System
(1) Bleed the high-pressure alternate braking system (Ref. AMM TASK 32-43-00-870-002).
Subtask 32-45-17-710-050-A ** ON A/C NOT FOR ALL (1) Bleed the high-pressure alternate braking system (Ref. AMM TASK 32-43-00-870-002).
E. Test
(1) Do the operational check of the parking brake system (Ref. AMM TASK 32-45-00-710-001).
(2) Do the operational check of the alternate braking with anti skid (Ref. AMM TASK 32-43-00-710-001).
(3) Make sure that there is no hydraulic fluid leakage from the dual shuttle valve 2578GM and the pressure switch (1).
5. Close-up(1) Do the operational check of the parking brake system (Ref. AMM TASK 32-45-00-710-001).
(2) Do the operational check of the alternate braking with anti skid (Ref. AMM TASK 32-43-00-710-001).
(3) Make sure that there is no hydraulic fluid leakage from the dual shuttle valve 2578GM and the pressure switch (1).
Subtask 32-45-17-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Apply corrosion protection to the heads of the bolts, the connectors and the adjacent areas of the pressure switch (Ref. AMM TASK 51-75-13-916-002).
(2) Remove the CONTAINER.
(3) Remove the access platform(s).
(4) Make sure that the work area is clean and clear of tools and other items.
(5) Close the right MLG door (Ref. AMM TASK 32-12-00-410-001).
(6) If necessary fill the reservoir of the Yellow hydraulic system to the correct level (Ref. AMM TASK 12-12-29-611-001).
(7) De-energize the ground service network (Ref. AMM TASK 24-42-00-862-001).
(8) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Apply corrosion protection to the heads of the bolts, the connectors and the adjacent areas of the pressure switch (Ref. AMM TASK 51-75-13-916-002).
(2) Remove the CONTAINER.
(3) Remove the access platform(s).
(4) Make sure that the work area is clean and clear of tools and other items.
(5) Close the right MLG door (Ref. AMM TASK 32-12-00-410-001).
(6) If necessary fill the reservoir of the Yellow hydraulic system to the correct level (Ref. AMM TASK 12-12-29-611-001).
(7) De-energize the ground service network (Ref. AMM TASK 24-42-00-862-001).
(8) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Park Brake-Pressure Switch