W DOC AIRBUS | AMM A320F

Installation of the Green Engine-1 Thrust-Reverser Check-Valve


TASK 29-11-35-400-804-A
Installation of the Green Engine-1 Thrust-Reverser Check-Valve


WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
WARNING: DO NOT TOUCH THE HYDRAULIC SYSTEM COMPONENTS FOR A SHORT TIME AFTER THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS STAY HOT FOR SOME TIME AND CAN CAUSE INJURY.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION: DO NOT LET HYDRAULIC FLUID FALL ON THE ENGINE. UNWANTED HYDRAULIC FLUID MUST BE REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH. THE FLUID CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME PARTS.
ZONE: 413
FIN: 3010KM1
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
No specific
AR
CAP - PROTECTION
No specific
1
CONTAINER 20L (5 USGAL)
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 83 and 75 m.N (61.21 and 55.31 lbf.ft ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.02ABA1)
Phosphate Ester Hydraulic Fluid-General Power - -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
413
UPPER FWD PYLON
195BB, 197CB
FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL, 438AR
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
5
PACKING
AIPC 29-11-86-51-060
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 12-12-29-611-001-A
Fill the Hydraulic Fluid Reservoir with a Hand Pump
TASK 20-23-22-910-001-A
Marking of the Unions after Application of Standard or Specific Tightening Torque
TASK 29-10-00-864-001-A
Depressurize the Green Hydraulic System
TASK 29-11-00-710-001-A
Operational Test of the Green Hydraulic System
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 71-13-00-010-803-A
Opening of the Fan Cowl Doors
TASK 71-13-00-410-803-A
Closing of the Fan Cowl Doors
TASK 78-30-00-040-807-A
Deactivation of the Thrust Reverser System for Nacelle Maintenance (ICU)
TASK 78-30-00-440-807-A
Reactivation of the Thrust Reverser System after Nacelle Maintenance (ICU)
TASK 78-31-49-400-815-A
Installation of the Pylon Tubes and Hoses
3. Job Set-up
Subtask 29-11-35-860-057-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the Green hydraulic system is depressurized
(Ref. AMM TASK 29-10-00-864-001)
   (2) Make sure that the reservoir of the Green hydraulic system is depressurized
(Ref. AMM TASK 29-14-00-614-001)
Subtask 29-11-35-941-058-A
B. Safety Precautions
   (1) On AIR COND panel 30VU:
  • Make sure that the APU BLEED pushbutton switch is released (ON legend off).
  • Make sure that a WARNING NOTICE(S) is in position to tell persons not to operate this pushbutton switch.
   (2) Make sure that a WARNING NOTICE(S) is in position to tell persons not to pressurize the Green hydraulic system:
  • On the HYD section of panel 40VU
  • On the ground service panel of the Green hydraulic system.
   (3) Make sure that a WARNING NOTICE(S) is in position on access door 195BB to tell persons not to pressurize the reservoir of the Green hydraulic system.
   (4) On the center pedestal, on ENG panel 115VU:
  • Make sure that the ENG/MODE selector switch is in the NORM position.
  • Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
  • Make sure that WARNING NOTICE(S) are in position to tell persons not to operate the ENG/MODE selector switch and the ENG/MASTER 1(2) control switch.
   (5) On the ENG section of maintenance panel 50VU:
  • Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
  • Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize FADEC 1(2).
Subtask 29-11-35-010-061-A
C. Get Access
   (1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-803):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL 438AR
Subtask 29-11-35-040-056-A
D. Deactivation of the Thrust Reverser System for Maintenance
WARNING: YOU MUST DEACTIVATE THE THRUST REVERSER BEFORE YOU DO WORK ON OR AROUND IT. IF YOU DO NOT, THE THRUST REVERSER CAN OPERATE ACCIDENTALLY AND CAUSE AN INJURY AND/OR DAMAGE.
   (1) Make sure that you did the deactivation of the thrust reverser system for maintenance (Ref. AMM TASK 78-30-00-040-807).
Subtask 29-11-35-010-062-A
E. Get Access
   (1) Make sure that an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position at the pylon.
4. Procedure
Subtask 29-11-35-420-053-C
A. Installation of the Green Engine-1 Thrust-Reverser Check-Valve
CAUTION: USE TWO WRENCHES TO REMOVE OR INSTALL THE TUBE COUPLING NUTS:
  • ONE WRENCH TO HOLD THE UNION, AND
  • ONE TO LOOSEN OR TIGHTEN THE COUPLING NUT.
THIS PREVENTS DAMAGE TO THE PARTS.
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Make sure that the hydraulic line end-fittings are serviceable.
   (4) Make sure that the CONTAINER 20L (5 USGAL) is in position below the check valve (6).
   (5) Remove the CAP - PROTECTION from the check-valve (6).
   (6) Remove the PLUG-BLANKING from each disconnected line end.
   (7) Apply hydraulic fluid:
CAUTION: DO NOT USE HIGH-DENSITY FLUID SKYDROL 500B-4 FOR A320NEO FAMILY. THE FLUID CAN CAUSE DAMAGE TO THE HYDRAULIC SYSTEM COMPONENTS.
     (a) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) on the new packing (5).
   (8) Install the new AIPC 29-11-86-51-060 PACKING (5) on the check valve (6).
   (9) Install the check valve (6) on the tube (1).
   (10) TORQUE the check valve (6) to between 83 and 75 m.N (61.21 and 55.31 lbf.ft )
T.
   (11) Install the anti-rotate key (2) to the check valve (6).
   (12) Install the washers (3) and the screws (4) to the anti-rotate key (2).
   (13) Tighten the screws (4).
   (14) Apply hydraulic fluid:
CAUTION: DO NOT USE HIGH-DENSITY FLUID SKYDROL 500B-4 FOR A320NEO FAMILY. THE FLUID CAN CAUSE DAMAGE TO THE HYDRAULIC SYSTEM COMPONENTS.
     (a) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.
02ABA1) on the threads of the coupling nut of the pylon tube (7).
   (15) Install the pylon tube (7) to the check valve (6) (Ref. AMM TASK 78-31-49-400-815).
   (16) Identify the tightened union nuts with a red line
(Ref. AMM TASK 20-23-22-910-001).
Subtask 29-11-35-710-051-A
B. Operational Test
   (1) Do the operational test of the Green hydraulic system (Ref. AMM TASK 29-11-00-710-001).
   (2) After the dry-motoring, make sure that there were no leaks from the hydraulic connections.
   (3) Make sure that the level of the hydraulic fluid in the Green reservoir is correct. If necessary, fill the reservoir (Ref. AMM TASK 12-12-29-611-001).
5. Close-up
Subtask 29-11-35-410-055-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the CONTAINER 20L (5 USGAL).
Subtask 29-11-35-440-053-A
B. Do the reactivation of the thrust reverser system after maintenance (Ref. AMM TASK 78-30-00-440-807).
Subtask 29-11-35-410-056-A
C. Close Access
   (1) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-803):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL 438AR
   (2) Close access doors 197CB and 195BB.
   (3) Remove the WARNING NOTICE(S).
   (4) Remove the access platform(s).
[Rev.10 from 2021] 2026.04.01 00:15:04 UTC