W DOC AIRBUS | AMM A320F

Installation of the Galley Equipment


TASK 25-35-00-410-001-A
Installation of the Galley Equipment


1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
TASK 25-35-15-400-001-A
Installation of the Coffee Maker(s)
TASK 25-35-15-400-002-A
Installation of the Espresso Maker
TASK 25-35-19-400-001-A
Installation of the Oven(s)
TASK 25-35-19-400-003-A
Installation of the Steam Oven(s)
TASK 25-35-19-400-004-A
Installation of the Oven Control Module
TASK 25-35-21-400-001-A
Installation of the Beverage Maker(s)
TASK 25-35-27-400-001-A
Installation of the Water Boiler(s)/Heater(s)
TASK 25-35-34-400-001-A
Installation of the Galley Control Panel
TASK 25-35-36-400-001-A
Installation of the Hot-Plate
3. Procedure
Subtask 25-35-00-410-071-A ** ON A/C NOT FOR ALL
A. Install the coffee maker(s) (Ref. AMM TASK 25-35-15-400-001).
Subtask 25-35-00-410-072-A ** ON A/C NOT FOR ALL
B. Install the coffee maker(s) (Ref. AMM TASK 25-35-15-400-001).
Subtask 25-35-00-410-073-A ** ON A/C NOT FOR ALL
C. Install the espresso maker(s) (Ref. AMM TASK 25-35-15-400-002).
Subtask 25-35-00-410-069-A ** ON A/C NOT FOR ALL
D. Install the oven(s) (Ref. AMM TASK 25-35-19-400-001).
Subtask 25-35-00-410-075-A ** ON A/C NOT FOR ALL
E. Install the steam oven(s) (Ref. AMM TASK 25-35-19-400-003).
Subtask 25-35-00-410-076-B ** ON A/C NOT FOR ALL
F. Installation of the Oven Control Module(s) (Ref. AMM TASK 25-35-19-400-004).
Subtask 25-35-00-410-077-A ** ON A/C NOT FOR ALL
G. Install the beverage maker(s) (Ref. AMM TASK 25-35-21-400-001).
Subtask 25-35-00-410-077-C ** ON A/C NOT FOR ALL
G. Install the beverage maker(s) (Ref. AMM TASK 25-35-21-400-001).
Subtask 25-35-00-410-084-A ** ON A/C NOT FOR ALL
H. Install the water boiler(s)/heater(s) (Ref. AMM TASK 25-35-27-400-001).
Subtask 25-35-00-410-084-E ** ON A/C NOT FOR ALL
H. Installation of the Water Boiler/Heater(s) (Ref. AMM TASK 25-35-27-400-001).
Subtask 25-35-00-410-084-L ** ON A/C NOT FOR ALL
H. Install the water boiler/heater(s) (Ref. AMM TASK 25-35-27-400-001).
Subtask 25-35-00-410-088-A ** ON A/C NOT FOR ALL
I. Install the galley control panel(s) (Ref. AMM TASK 25-35-34-400-001).
Subtask 25-35-00-410-090-A ** ON A/C NOT FOR ALL
J. Installation of the Hot-Plate(s) (Ref. AMM TASK 25-35-36-400-001).
[Rev.10 from 2021] 2026.04.01 06:12:16 UTC