Cleaning of EWIS Installed in the Air Conditioning Compartment and Fairings (Only If Contaminated)(EWIS)
TASK 24-92-00-100-027-A
Cleaning of EWIS Installed in the Air Conditioning Compartment and Fairings (Only If Contaminated)(EWIS)
1. Reason for the Job
Refer to the MPD TASK: 200191-01
CLEANING OF EWIS INSTALLED IN THE AIR CONDITIONING COMPARTMENT AND FAIRINGS (ONLY IF CONTAMINATED) (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 24-92-00-010-145-A
Subtask 24-92-00-160-075-A
Subtask 24-92-00-410-143-A
[Rev.10 from 2021]
2026.03.31 23:27:25 UTC
Cleaning of EWIS Installed in the Air Conditioning Compartment and Fairings (Only If Contaminated)(EWIS)
1. Reason for the Job
Refer to the MPD TASK: 200191-01
CLEANING OF EWIS INSTALLED IN THE AIR CONDITIONING COMPARTMENT AND FAIRINGS (ONLY IF CONTAMINATED) (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 191 | AIR CONDITIONING COMPT AND FAIRINGS |
| 192 | AIR CONDITIONING COMPT AND FAIRINGS |
| 191AB, 191AT, 191BT, 191CT, 191DT, 191EB, 191ET, 191GB, 191HB, 191JB, 191KB, 191LB, 192AB, 192AT, 192BT, 192CT, 192DT, 192EB, 192ET, 192FB, 192KB, 192LB, 192MB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 52-42-18-000-001-A | Removal of the Fuel Panel Access-Door |
| TASK 52-42-18-400-001-A | Installation of the Fuel Panel Access-Door |
| TASK 53-25-11-000-001-A | Removal of the Forward Belly Fairing Panels (191AT, 192AT, 191AB, 192AB) |
| TASK 53-25-11-400-001-A | Installation of Forward Belly Fairing Panels (191AT, 191AB, 192AT, 192AB) |
| TASK 53-35-11-000-001-A | Removal of the Wing-to-Fuselage Fairings |
| TASK 53-35-11-400-001-A | Installation of the Wing-to-Fuselage Fairings |
| TASK 53-35-13-000-001-A | Removal of the Belly Fairing Access Panels |
| TASK 53-35-13-000-002-A | Removal of the Quick-Release Access Panels from the Belly Fairing Structure |
| TASK 53-35-13-400-001-A | Installation of the Belly Fairing Access Panels |
| TASK 53-35-13-400-002-A | Installation of the Quick-Release Access Panels on the Belly Fairing Structure |
| ESPM 2055000 | |
Subtask 24-92-00-010-145-A
A. Get Access
(1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.
(2) Remove the access panels:
Subtask 24-92-00-862-133-A 4. Procedure(1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.
(2) Remove the access panels:
- For the left side:
- 191AB 191AT (Ref. AMM TASK 53-25-11-000-001)
- 191GB 191JB (Ref. AMM TASK 53-35-13-000-001)
- 191BT 191CT 191DT 191ET 191LB (Ref. AMM TASK 53-35-11-000-001)
- 191EB 191HB 191KB (Ref. AMM TASK 53-35-13-000-002).
- For the right side:
- 192AB 192AT (Ref. AMM TASK 53-25-11-000-001)
- 192BT 192CT 192DT 192ET 192LB (Ref. AMM TASK 53-35-11-000-001)
- 192EB 192FB 192KB (Ref. AMM TASK 53-35-13-000-002)
- 192MB (Ref. AMM TASK 52-42-18-000-001).
Subtask 24-92-00-160-075-A
A. Cleaning of All Wiring Installed in the Air Conditioning Compartment and Fairings (Only Contaminated Wiring)
(1) Clean the wiring if there is dust or lint contamination ESPM 2055000.
(a) On the AC/DC power-distribution routes: 1P and 2P.
(b) On the other routes: 1M and 2M.
(c) On the overheat detection.
5. Close-up(1) Clean the wiring if there is dust or lint contamination ESPM 2055000.
(a) On the AC/DC power-distribution routes: 1P and 2P.
(b) On the other routes: 1M and 2M.
(c) On the overheat detection.
Subtask 24-92-00-410-143-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels:
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels:
- For the left side:
- 191AB 191AT (Ref. AMM TASK 53-25-11-400-001)
- 191GB 191JB (Ref. AMM TASK 53-35-13-400-001)
- 191BT 191CT 191DT 191ET 191LB (Ref. AMM TASK 53-35-11-400-001)
- 191EB 191HB 191KB (Ref. AMM TASK 53-35-13-400-002).
- For the right side:
- 192AB 192AT (Ref. AMM TASK 53-25-11-400-001)
- 192BT 192CT 192DT 192ET 192LB (Ref. AMM TASK 53-35-11-400-001)
- 192EB 192FB 192KB (Ref. AMM TASK 53-35-13-400-002)
- 192MB (Ref. AMM TASK 52-42-18-400-001).
Air Conditioning Compartment and Fairings - Access Panels on the Left Side