Installation of Forward Belly Fairing Panels (191AT, 191AB, 192AT, 192AB)
TASK 53-25-11-400-001-A
Installation of Forward Belly Fairing Panels (191AT, 191AB, 192AT, 192AB)
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 53-25-11-869-050-A
Subtask 53-25-11-390-050-B
Subtask 53-25-11-865-056-A
[Rev.10 from 2021]
2026.04.01 03:47:36 UTC
Installation of Forward Belly Fairing Panels (191AT, 191AB, 192AT, 192AB)
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | SCRAPER - NON METALLIC |
| No specific | Torque wrench: range to between 0.45 and 0.35 m.daN (39.82 and 30.97 lbf.in ) ![]() |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.06ABB1) | Polysulfide Sealant-Fuel Tank Fillet - |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 191 | AIR CONDITIONING COMPT AND FAIRINGS |
| 192 | AIR CONDITIONING COMPT AND FAIRINGS |
| REFERENCE | DESIGNATION |
|---|---|
Subtask 53-25-11-869-050-A
A. Aircraft Maintenance Configuration
(1) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in position at zones 191 and 192.
Subtask 53-25-11-865-055-A (1) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in position at zones 191 and 192.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 53-25-11-210-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | AIR COND/RAM/AIR/INLET | 1HZ | D10 |
| 106VU | CSM/G /EV/MAN/SPLY | 6XE | B04 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
C. Inspection of the Structure.
(1) Examine the seals on the panels you removed. If necessary, replace them.
(2) Examine the support structure and make sure that the riveted seals are attached correctly.
Subtask 53-25-11-110-050-A (1) Examine the seals on the panels you removed. If necessary, replace them.
(2) Examine the support structure and make sure that the riveted seals are attached correctly.
D. Cleaning of Component.
4. ProcedureWARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(1) Clean and degrease the washers (2) (to the bare metal) with Non Aqueous Cleaner-General - - (Material No.08BAA9) .Subtask 53-25-11-390-050-B
A. Sealing
(1) Remove the old sealants along FR34 with a SCRAPER - NON METALLIC.
Subtask 53-25-11-420-050-A (1) Remove the old sealants along FR34 with a SCRAPER - NON METALLIC.
B.
Forward Belly Fairing Panels - Typical Installation
Fairing - Left Access Panels ** ON A/C NOT FOR ALL
Fairing - Right Access Panels ** ON A/C NOT FOR ALL
Fairing - Left Access Panels ** ON A/C NOT FOR ALL
Fairing - Right Access Panels ** ON A/C NOT FOR ALL
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Put the fairings (3) in position.
(3) Temporarily attach the fairings (3) with four screws (1) and washers (2) at the locating holes (4).
(4) TORQUE the four screws to between 0.45 and 0.35 m.daN (39.82 and 30.97 lbf.in )
(5) Install the remaining screws (1) and washers (2) in position.
(6) Do a visual check to make sure that the seals touch the fuselage and/or the edges of the wings.
(7) TORQUE all the screws (1) to between 0.45 and 0.35 m.daN (39.82 and 30.97 lbf.in )
Subtask 53-25-11-914-050-B
Forward Belly Fairing Panels - Typical Installation
Fairing - Left Access Panels ** ON A/C NOT FOR ALL
Fairing - Right Access Panels ** ON A/C NOT FOR ALL
Fairing - Left Access Panels ** ON A/C NOT FOR ALL
Fairing - Right Access Panels ** ON A/C NOT FOR ALL (2) Put the fairings (3) in position.
(3) Temporarily attach the fairings (3) with four screws (1) and washers (2) at the locating holes (4).
(4) TORQUE the four screws to between 0.45 and 0.35 m.daN (39.82 and 30.97 lbf.in )

(5) Install the remaining screws (1) and washers (2) in position.
(6) Do a visual check to make sure that the seals touch the fuselage and/or the edges of the wings.
(7) TORQUE all the screws (1) to between 0.45 and 0.35 m.daN (39.82 and 30.97 lbf.in )

C. Application of Sealant
(2) Let the sealant becomes dry.
5. Close-upWARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(1) Apply a fillet of Polysulfide Sealant-Fuel Tank Fillet - (Material No.06ABB1) to get a smooth contour.(2) Let the sealant becomes dry.
Subtask 53-25-11-865-056-A
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 53-25-11-942-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | AIR COND/RAM/AIR/INLET | 1HZ | D10 |
| 106VU | CSM/G /EV/MAN/SPLY | 6XE | B04 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).