Return to Operation of an Aircraft Parked without Air Supply and with Electrical Supply
TASK 12-31-10-554-001-A
Return to Operation of an Aircraft Parked without Air Supply and with Electrical Supply
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 12-31-10-941-050-A ** ON A/C NOT FOR ALL
Subtask 12-31-10-860-057-B ** ON A/C NOT FOR ALL
(a) Move the CAPT (F/O) side stick from stop to stop in pitch. On the lower ECAM display unit, on the FLT CTL page, make sure that the elevators move.
(b) Move the CAPT (F/O) side stick from stop to stop in roll. On the lower ECAM display unit, on the FLT CTL page, make sure that the ailerons move and that the spoilers (2, 3, 4, 5) extend.
(c) On the nosewheel steering handwheel, push the pedal disconnection pushbutton and push the rudder pedals from right stop to left stop. On the lower ECAM display unit, on the FLT CTL page, make sure that the rudder moves.
(4) On the overhead panel 24VU:
(6) On the overhead panel 24VU:
(9) On the overhead panel 23VU:
(11) On the overhead panel 23VU, release and push the FLT CTL/ELAC 1 pushbutton switch to do a reset of the pitch trim.
(12) On the nosewheel steering handwheel, push the pedal disconnection pushbutton and move the rudder trim from 5 degrees to -5 degrees. On the center pedestal, on the panel 408VU, push the RUD TRIM/RESET pushbutton switch to set the rudder to neutral.
(13) On the center pedestal, move the speedbrake control lever from the 0 position to the 1/2 position. Move the speedbrake control lever from the 1/2 position to the FULL position, then back to the 0 position.
(15) Operate again the CAPT (F/O) side stick in pitch and roll at full speed:
(a) Move the CAPT (F/O) side stick from stop to stop in pitch for 2 minutes. On the lower ECAM display unit, on the FLT CTL page, make sure that the elevators move.
(b) Move the CAPT (F/O) side stick from stop to stop in roll for 2 minutes. On the lower ECAM display unit, on the FLT CTL page, make sure that the ailerons move and that the spoilers (2, 3, 4, 5) extend.
(17) On the center pedestal, set the slat and flap control lever to positions FULL, 3, 2, 1+F and 0. Stop at each notch until the flaps stop at each position selected.
(18) Do the operational test of the Green and Yellow yaw dampers (Ref. AMM TASK 22-63-00-710-001).
(19) Do the operational test of the travel limitation unit (Ref. AMM TASK 22-61-00-710-001).
(20) Make sure that the FLT CLT/ELAC 1, FLT CTL/ ELAC 2, FLT CTL/SEC 1, FLT CTL/SEC 2, FLT CTL/SEC 3, FAC 1 and FAC 2 pushbutton switches are pushed. Do a BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001) and make sure that there is no warning.
(21) Do a BITE test of the Electrical Flight Control System (EFCS) (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001) and make sure that there is no warning.
Subtask 12-31-10-660-066-B ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 04:41:44 UTC
Return to Operation of an Aircraft Parked without Air Supply and with Electrical Supply
CAUTION:
DO NOT MOVE PARTS OF THE CABIN FURNISHINGS UNTIL THE CABIN IS WARM.
CAUTION:
DO NOT OPERATE THE WINDOW HEAT UNTIL THE PROCEDURE TELLS YOU.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | HOT AIR BLOWER MAX OPERATING 55DEG C (131 DEG F) |
| 98D32000005000 | 2 | COVER-MAIN LANDING GEAR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-31-23-554-801-A | Cold Weather Maintenance - Aircraft Return to Service at very low outside temperatures - Communications |
| TASK 12-31-32-660-001-A | Cold Weather Maintenance - Landing Gear |
| TASK 12-31-70-660-002-A | Engine Start Procedure after Engine Cold Soak (with OAT below -40 DEG.C (-40 DEG.F)) |
| TASK 22-61-00-710-001-A | Operational Test of the Rudder-Travel Limiting Function |
| TASK 22-63-00-710-001-A | Operational Test of the Yaw Damper Function |
| TASK 27-96-00-740-001-A | BITE Test of the EFCS (Ground Scanning) |
| TASK 29-00-00-790-001-A | Check of the External Leaks of the Hydraulic Components |
| TASK 29-10-00-863-003-A-01 | Pressurize the Blue Hydraulic System with the Blue Electric Pump |
| TASK 29-23-00-863-001-A | Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump |
| TASK 29-24-00-863-001-A | Pressurize the Yellow Hydraulic System with the Electric Pump |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
| TASK 32-22-00-010-001-A | Nose Gear Doors - Ground Doors Opening |
| TASK 32-22-00-410-001-A | Nose Gear Doors - Ground Doors Closing |
| TASK 32-42-27-000-001-A | Removal of the Brake |
| TASK 32-44-11-200-001-A | Functional Check of Parking/Emergency Brake Accumulator by Reading the Charge Pressure on the Accumulator Gauge |
| TASK 35-12-41-400-002-A | Installation of the Full-Face/Quick-donning Oxygen-Mask |
| TASK 49-00-00-860-008-A | APU Start by External Power |
| TASK 49-00-00-860-008-A-01 | APU Start by Batteries |
| TASK 49-61-34-400-002-A | Installation of the Electronic Control Box (ECB) (APS 3200) |
| TASK 49-61-34-400-003-A | Installation of the Electronic Control Box (ECB) (131-9(A)) |
| TASK 71-00-00-860-826-A | Start the Engine - (Cold Weather) |
| TSM 32-42-00-810-849 | Failure of the Two Hydraulic Pipes (Green System) on the Same Landing Gear (Normal Brake System Inoperative) |
Subtask 12-31-10-941-050-A ** ON A/C NOT FOR ALL
A. Not Applicable
4. ProcedureSubtask 12-31-10-860-057-B ** ON A/C NOT FOR ALL
A. Aircraft Configuration
(1) Reset of computers
(a) On the ELEC panel 35VU:
(3) On the ADIRS MSU:
Subtask 12-31-10-660-061-A ** ON A/C NOT FOR ALL (1) Reset of computers
(a) On the ELEC panel 35VU:
- Release the BAT 1 and 2 pushbutton switches (the OFF legends comes on) and the EXT PWR pushbutton switch (the AVAIL legend comes on)
- Push the BAT 1 and 2 pushbutton switches (the OFF legends go off) and the EXT PWR pushbutton switch (the ON legend comes on).
(3) On the ADIRS MSU:
- Set the OFF/NAV/ATT selector switches related to IR 1, 2, 3 to NAV.
- Set the PFD and the ND potentiometers to ON.
- Set the UPPER DISPLAY and LOWER DISPLAY potentiometers to ON.
B. APU Start
(1) On the AIR COND panel 30VU:
(4) Remove the HOT AIR BLOWER MAX OPERATING 55DEG C (131 DEG F) if applicable and close the APU access door (315AL).
(5) On the ELEC panel 35VU:
(7) On the ELEC panel 35VU:
Subtask 12-31-10-660-062-B ** ON A/C NOT FOR ALL (1) On the AIR COND panel 30VU:
- Release the APU BLEED pushbutton switch (the OFF legend comes on).
- 131-9A with oil type I.
(4) Remove the HOT AIR BLOWER MAX OPERATING 55DEG C (131 DEG F) if applicable and close the APU access door (315AL).
(5) On the ELEC panel 35VU:
- Push the APU GEN pushbutton switch (the OFF legend comes on).
(7) On the ELEC panel 35VU:
- Release the APU GEN pushbutton switch (the OFF legend goes off).
- Set the X BLEED selector switch to AUTO.
- Push the APU BLEED pushbutton switch (the OFF legend goes off).
C. Air Conditioning Start
(1) On panel 30VU:
(2) Five minutes after pack 2 start, on AIR COND panel 30VU, push the HOT AIR pushbutton switch (the OFF legend goes off).
(3) Ignore the HOT AIR FAULT ECAM warning and, on circuit breaker panel 122VU, open these circuit breakers:
(6) On circuit breaker panel 122VU, close the AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/SPLY circuit breaker (6HU).
(7) On the VENTILATION section of panel 22VU:
Subtask 12-31-10-420-050-A ** ON A/C NOT FOR ALL (1) On panel 30VU:
- Push the PACK 1 pushbutton switch (the OFF legend goes off).
- Ignore the pack discharge temperature shown as an "XX" value on system display.
NOTE: In very cold weather conditions (OAT below -30 DEG.C (-22.00 DEG.F)), the pack discharge temperature can be temporarily shown as an amber "XX" for a short time after pack start.
(a) After three minutes, push the PACK 2 pushbutton switch (the OFF legend goes off). (2) Five minutes after pack 2 start, on AIR COND panel 30VU, push the HOT AIR pushbutton switch (the OFF legend goes off).
(3) Ignore the HOT AIR FAULT ECAM warning and, on circuit breaker panel 122VU, open these circuit breakers:
- AIR COND/ZONE TEMP (47HK)
- AIR COND/ZONE TEMP (57HK).
- AIR COND/ZONE TEMP (47HK)
- AIR COND/ZONE TEMP (57HK).
(6) On circuit breaker panel 122VU, close the AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/SPLY circuit breaker (6HU).
(7) On the VENTILATION section of panel 22VU:
- Push the CABIN FANS pushbutton switch (the OFF legend goes off).
D. Installation of Equipment
(1) Install these items of equipment:
Subtask 12-31-10-865-054-A ** ON A/C NOT FOR ALL (1) Install these items of equipment:
- The floppy disks or the Compact Disks (CD) or the Universal Serial Bus (USB) keys in the cockpit
- Portable fire-extinguisher bottles
- Megaphone
- Emergency Locator Transmitter (ELT)
- Flashlights
- Full-Face Quick-Donning Mask (Ref. AMM TASK 35-12-41-400-002)
- First aid kits
- Medical kits
- Defibrillator
- All the items of equipment removed in the cabin
- Cabin Intercommunication Data System (CIDS) components (Ref. AMM TASK 12-31-23-554-801).
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 12-31-10-860-058-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/CIDS/DIR ESS/2 | 157RH | G02 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/CIDS/DEU B/ESS | 153RH | G03 |
| 49VU | COM/CIDS/DIR ESS/1 | 150RH | G01 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/CIDS/SDF/DIR2 ESS | 18WH | C06 |
| 49VU | AIR COND/CIDS/SDF/DIR1 ESS | 15WH | C05 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/CARGO FIRE/EXTIG/BTL1 | 1WX | C03 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/CARGO FIRE/EXTIG/BTL2 | 8WX | C04 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM DIR ESS/2 | 157RH | G02 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/CARGO/FIRE/EXTIG/BTL1 | 1WX | C03 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM NAV/CIDS/DIR2 ESS | 157RH | G02 |
| 49VU | COM NAV/CIDS/DIR1 ESS | 150RH | G01 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM CIDS FWD ATTND PNL | 170RH | Q14 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU A NORM/R AFT | 168RH | M12 |
| 121VU | COM NAV/CIDS/DEU A NORM/L AFT | 167RH | M11 |
| 121VU | COM NAV/CIDS/DEU A NORM/R FWD | 164RH | M10 |
| 121VU | COM NAV/CIDS/DEU A NORM/L FWD | 163RH | M09 |
| 121VU | COM NAV/CIDS/DEU B/NORM | 162RH | M08 |
| 121VU | COM NAV/CIDS/DIR NORM/2 | 156RH | M06 |
| 121VU | COM NAV/CIDS/DIR NORM/1 | 151RH | M05 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/RAD ALTM/2 | 1SA2 | K12 |
| 121VU | COM NAV/RAD ALTM/1 | 1SA1 | K11 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM/FAP1/NORM | 170RH | Q14 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU A NORM/R FWD | 164RH | M11 |
| 121VU | COM NAV/CIDS/DEU A NORM/L FWD | 163RH | M10 |
| 121VU | COM NAV/CIDS/DIR NORM/2 | 156RH | M07 |
| 121VU | COM NAV/CIDS/DIR NORM/1 | 151RH | M06 |
| 121VU | COM NAV/CIDS/FWD ATTND/PNL | 170RH | Q14 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DIR2 NORM | 156RH | M06 |
| 121VU | COM NAV/CIDS/DIR1 NORM | 151RH | M05 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/CARGO/FIRE/EXTIG | 1WX | T19 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/CIDS/SDF/DIR NORM/2 | 14WH | T18 |
| 122VU | AIR COND/CIDS/SDF/DIR NORM/1 | 17WH | T17 |
F. System Configuration
(1) On the ELEC panel 35VU:
Subtask 12-31-10-660-067-A ** ON A/C NOT FOR ALL (1) On the ELEC panel 35VU:
- Push the GALLEY pushbutton switch (the OFF legend goes off).
- Push the FWD ISOL VALVE pushbutton switch (if installed) (the OFF legend goes off).
- Push the AFT ISOL VALVE pushbutton switch (if installed) (the OFF legend goes off).
- Push the PROBE/WINDOW HEAT pushbutton switch (the OFF legend goes off).
- Push the COMMERCIAL pushbutton switch (the OFF legend goes off).
G. Brake and Hydraulic System Preparation
(2) After 45 minutes, open the right MLG door (Ref. AMM TASK 32-12-00-010-001).
(3) Blow air at 30 DEG.C (86.00 DEG.F) on the brake accumulator 2582GM for 10 minutes with the HOT AIR BLOWER MAX OPERATING 55DEG C (131 DEG F).
(4) Read the gauge on the accumulator to do a check of the nitrogen charge pressure (Ref. AMM TASK 32-44-11-200-001).
(5) Close the right MLG door (Ref. AMM TASK 32-12-00-410-001) and blow air at 30 DEG.C (86.00 DEG.F) in the space between the closed MLG doors and the wing.
(9) Pressurize the Yellow hydraulic system (Ref. AMM TASK 29-24-00-863-001).
(11) Remove the 98D32000005000 COVER-MAIN LANDING GEAR from the MLG wheels.
(12) On the panel 400VU, make sure that the A/SKID & N/W STRG control switch is in the ON position (normal braking mode).
(13) Slowly operate the brake pedals ten times.
(a) If the braking system changes to alternate during the test:
1 Open the right MLG door (Ref. AMM TASK 32-12-00-010-001).
2 With the HOT AIR BLOWER MAX OPERATING 55DEG C (131 DEG F) blow air at 30 DEG.C (86.00 DEG.F) on the brake selector valve 23GG for 10 minutes.
3 Close the right MLG door (Ref. AMM TASK 32-12-00-410-001).
4 On the panel 400VU, set the A/SKID & N/W STRG control switch to OFF.
5 On the panel 400VU, set the A/SKID & N/W STRG control switch to ON.
6 Operate the brake pedals ten times.
7 If the braking system changes to alternate, do the trouble shooting procedure TSM 32-42-00-810-849.
(14) Remove hydraulic fluid that can be on the brakes.
(15) Measure the leakage rate of the brake unit (Ref. AMM TASK 29-00-00-790-001). Remove hydraulic fluid from the brakes.
(16) If the measured leakage rate is more than the maximum leakage rate permitted:
(a) Slowly operate the brake pedals ten times.
(b) Measure the leakage rate of the brake unit (Ref. AMM TASK 29-00-00-790-001).
(17) After the second leak test, if the measured leakage rate is more than the maximum leakage rate permitted, replace the brake unit (Ref. AMM TASK 32-42-27-000-001).
(19) Slowly operate the brake pedals ten times.
(20) Measure the leakage rate of the brake unit (Ref. AMM TASK 29-00-00-790-001). Remove hydraulic fluid from the brakes.
(21) If the measured leakage rate is more than the maximum leakage rate permitted:
(a) Slowly operate the brake pedals ten times.
(b) Measure the leakage of the brake unit (Ref. AMM TASK 29-00-00-790-001).
(22) After the second leak test, if the measured leakage rate is more than the maximum leakage rate permitted, replace the brake unit (Ref. AMM TASK 32-42-27-000-001).
(24) At 30 minute intervals until the aircraft departure, slowly operate the brake pedals ten times in normal and alternate braking mode.
(25) Before aircraft departure, on the panel 400VU, make sure that the A/SKID & N/W STRG control switch is in ON position.
Subtask 12-31-10-660-079-A ** ON A/C NOT FOR ALL CAUTION:
MAKE SURE THAT HYDRAULIC POWER IS IN OPERATION A MINIMUM OF 10 MINUTES BEFORE YOU OPERATE COMPONENTS THAT USE HYDRAULIC POWER.
CAUTION:
DO NOT BLEED THE NORMAL AND ALTERNATE BRAKING SYSTEMS WHEN THE TEMPERATURE OF THE BRAKING-EQUIPMENT SAFETY VALVE IS LESS THAN -40 DEG.C (-40 DEG.F). THIS CAN CAUSE THE SAFETY VALVE TO CLOSE.
(1) On each side of the aircraft, install the HOT AIR BLOWER MAX OPERATING 55DEG C (131 DEG F) in the space between the closed Main Landing Gear (MLG) doors and the wing. Blow air at 30 DEG.C (86.00 DEG.F) for 45 minutes. (2) After 45 minutes, open the right MLG door (Ref. AMM TASK 32-12-00-010-001).
(3) Blow air at 30 DEG.C (86.00 DEG.F) on the brake accumulator 2582GM for 10 minutes with the HOT AIR BLOWER MAX OPERATING 55DEG C (131 DEG F).
(4) Read the gauge on the accumulator to do a check of the nitrogen charge pressure (Ref. AMM TASK 32-44-11-200-001).
(5) Close the right MLG door (Ref. AMM TASK 32-12-00-410-001) and blow air at 30 DEG.C (86.00 DEG.F) in the space between the closed MLG doors and the wing.
NOTE: Blow air at 30 DEG.C (86.00 DEG.F) in the MLG compartment until you start the engine.
(6) On the overhead panel 23VU: - Release the FLT CTL/ELAC 1, FLT CTL/SEC 1 and FAC 1 pushbutton switches (the OFF and FAULT legends of these pushbutton switches come on).
- Release the FLT CTL/ELAC 2, FLT CTL/SEC 2, FLT CTL/SEC 3 and FAC 2 pushbutton switches (the OFF and FAULT legends of these pushbutton switches come on).
(9) Pressurize the Yellow hydraulic system (Ref. AMM TASK 29-24-00-863-001).
NOTE: If during pressurization of the Blue and the Yellow hydraulic systems, circuit breakers 2701CJ and 3802GX open, start the pumps again after 5 minutes. If the pumps do not start, blow warm air in the Blue and Yellow electric pump compartments.
(10) Pressurize the Green hydraulic system (Ref. AMM TASK 29-23-00-863-001). (11) Remove the 98D32000005000 COVER-MAIN LANDING GEAR from the MLG wheels.
(12) On the panel 400VU, make sure that the A/SKID & N/W STRG control switch is in the ON position (normal braking mode).
(13) Slowly operate the brake pedals ten times.
(a) If the braking system changes to alternate during the test:
1 Open the right MLG door (Ref. AMM TASK 32-12-00-010-001).
2 With the HOT AIR BLOWER MAX OPERATING 55DEG C (131 DEG F) blow air at 30 DEG.C (86.00 DEG.F) on the brake selector valve 23GG for 10 minutes.
3 Close the right MLG door (Ref. AMM TASK 32-12-00-410-001).
4 On the panel 400VU, set the A/SKID & N/W STRG control switch to OFF.
5 On the panel 400VU, set the A/SKID & N/W STRG control switch to ON.
6 Operate the brake pedals ten times.
7 If the braking system changes to alternate, do the trouble shooting procedure TSM 32-42-00-810-849.
(14) Remove hydraulic fluid that can be on the brakes.
(15) Measure the leakage rate of the brake unit (Ref. AMM TASK 29-00-00-790-001). Remove hydraulic fluid from the brakes.
(16) If the measured leakage rate is more than the maximum leakage rate permitted:
(a) Slowly operate the brake pedals ten times.
(b) Measure the leakage rate of the brake unit (Ref. AMM TASK 29-00-00-790-001).
(17) After the second leak test, if the measured leakage rate is more than the maximum leakage rate permitted, replace the brake unit (Ref. AMM TASK 32-42-27-000-001).
NOTE: Airbus recommends to replace the brake unit at a temperature above -40 DEG.C (-40.00 DEG.F).
(18) On the panel 400VU, set the A/SKID & N/W STRG control switch to OFF (alternate breaking mode). (19) Slowly operate the brake pedals ten times.
(20) Measure the leakage rate of the brake unit (Ref. AMM TASK 29-00-00-790-001). Remove hydraulic fluid from the brakes.
(21) If the measured leakage rate is more than the maximum leakage rate permitted:
(a) Slowly operate the brake pedals ten times.
(b) Measure the leakage of the brake unit (Ref. AMM TASK 29-00-00-790-001).
(22) After the second leak test, if the measured leakage rate is more than the maximum leakage rate permitted, replace the brake unit (Ref. AMM TASK 32-42-27-000-001).
NOTE: Airbus recommends to replace the brake unit at a temperature above -40 DEG.C (-40.00 DEG.F).
(23) On the panel 400VU, set the A/SKID & N/W STRG control switch to ON. (24) At 30 minute intervals until the aircraft departure, slowly operate the brake pedals ten times in normal and alternate braking mode.
(25) Before aircraft departure, on the panel 400VU, make sure that the A/SKID & N/W STRG control switch is in ON position.
H. Landing Gear and Landing Gear Bay Preparation
(1) Open the nose landing gear doors (Ref. AMM TASK 32-22-00-010-001).
(2) Blow air at 30 DEG.C (86.00 DEG.F) in the NLG bay at the NLG actuating cylinder and NLG door actuating cylinder for 45 minutes with the HOT AIR BLOWER MAX OPERATING 55DEG C (131 DEG F).
(3) Close the nose landing gear doors (Ref. AMM TASK 32-22-00-410-001).
(4) Blow air at 30 DEG.C (86.00 DEG.F) at the MLG actuating cylinder for 45 minutes with the HOT AIR BLOWER MAX OPERATING 55DEG C (131 DEG F).
(5) Remove ice and/or snow from the landing gears (Ref. AMM TASK 12-31-32-660-001).
(6) Do a check of the tire pressure. If necessary inflate the tire (Ref. AMM TASK 12-31-32-660-001).
Subtask 12-31-10-660-063-B ** ON A/C NOT FOR ALL (1) Open the nose landing gear doors (Ref. AMM TASK 32-22-00-010-001).
(2) Blow air at 30 DEG.C (86.00 DEG.F) in the NLG bay at the NLG actuating cylinder and NLG door actuating cylinder for 45 minutes with the HOT AIR BLOWER MAX OPERATING 55DEG C (131 DEG F).
(3) Close the nose landing gear doors (Ref. AMM TASK 32-22-00-410-001).
(4) Blow air at 30 DEG.C (86.00 DEG.F) at the MLG actuating cylinder for 45 minutes with the HOT AIR BLOWER MAX OPERATING 55DEG C (131 DEG F).
(5) Remove ice and/or snow from the landing gears (Ref. AMM TASK 12-31-32-660-001).
(6) Do a check of the tire pressure. If necessary inflate the tire (Ref. AMM TASK 12-31-32-660-001).
CAUTION:
MAKE SURE THAT HYDRAULIC POWER IS IN OPERATION A MINIMUM OF 10 MINUTES BEFORE YOU OPERATE COMPONENTS THAT USE HYDRAULIC POWER.
I. Flight Controls Preparation NOTE: The time between the end of the flight controls preparation and the flight departure must not be more than 1.5 hours with the electric pumps and the PTU in operation. If the time is more than 1.5 hours, you must do the flight controls preparation again.
(1) On the overhead panel 23VU: - Push the FLT CTL/ELAC 1, FLT CTL/SEC 1 and FAC 1 pushbutton switches (the OFF and FAULT legends of these pushbutton switches go off).
- Push the FLT CTL/ELAC2, FLT CTL/SEC 2, FLT CTL/SEC 3 and FAC 2 pushbutton switches (the OFF and FAULT legends of these pushbutton switches go off).
NOTE: The time necessary for the computer start is 2 minutes.
(3) Slowly move the flight controls from stop to stop for at least 5 minutes in each axis, in this sequence: (a) Move the CAPT (F/O) side stick from stop to stop in pitch. On the lower ECAM display unit, on the FLT CTL page, make sure that the elevators move.
(b) Move the CAPT (F/O) side stick from stop to stop in roll. On the lower ECAM display unit, on the FLT CTL page, make sure that the ailerons move and that the spoilers (2, 3, 4, 5) extend.
(c) On the nosewheel steering handwheel, push the pedal disconnection pushbutton and push the rudder pedals from right stop to left stop. On the lower ECAM display unit, on the FLT CTL page, make sure that the rudder moves.
(4) On the overhead panel 24VU:
- Release the FLT CTL/ELAC 2 pushbutton switch (the OFF legend of this pushbutton switch comes on).
(6) On the overhead panel 24VU:
- Push the FLT CTL/ELAC 2 pushbutton switch (the OFF and FAULT legends of this pushbutton switch go off).
- Release the FLT CTL/ELAC 1 pushbutton switch (the OFF legend of this pushbutton switch comes on).
(9) On the overhead panel 23VU:
- Push the FLT CTL/ELAC 1 pushbutton switch (the OFF and FAULT legends of this pushbutton switch go off).
(11) On the overhead panel 23VU, release and push the FLT CTL/ELAC 1 pushbutton switch to do a reset of the pitch trim.
(12) On the nosewheel steering handwheel, push the pedal disconnection pushbutton and move the rudder trim from 5 degrees to -5 degrees. On the center pedestal, on the panel 408VU, push the RUD TRIM/RESET pushbutton switch to set the rudder to neutral.
(13) On the center pedestal, move the speedbrake control lever from the 0 position to the 1/2 position. Move the speedbrake control lever from the 1/2 position to the FULL position, then back to the 0 position.
CAUTION:
MAKE SURE THAT YOU MOVE THE SLAT/FLAP CONTROL LEVER ONE NOTCH AT A TIME.
(14) On the center pedestal, move the slat and flap control lever from the 0 position to the first notch position. Make sure that the flaps stop at the first position selected (1+F). (15) Operate again the CAPT (F/O) side stick in pitch and roll at full speed:
(a) Move the CAPT (F/O) side stick from stop to stop in pitch for 2 minutes. On the lower ECAM display unit, on the FLT CTL page, make sure that the elevators move.
(b) Move the CAPT (F/O) side stick from stop to stop in roll for 2 minutes. On the lower ECAM display unit, on the FLT CTL page, make sure that the ailerons move and that the spoilers (2, 3, 4, 5) extend.
CAUTION:
MAKE SURE THAT YOU MOVE THE SLAT/FLAP CONTROL LEVER ONE NOTCH AT A TIME.
(16) On the center pedestal, set the slat and flap control lever to positions 2, 3 and FULL. Stop at each notch until the flaps stop at each position selected. (17) On the center pedestal, set the slat and flap control lever to positions FULL, 3, 2, 1+F and 0. Stop at each notch until the flaps stop at each position selected.
(18) Do the operational test of the Green and Yellow yaw dampers (Ref. AMM TASK 22-63-00-710-001).
(19) Do the operational test of the travel limitation unit (Ref. AMM TASK 22-61-00-710-001).
(20) Make sure that the FLT CLT/ELAC 1, FLT CTL/ ELAC 2, FLT CTL/SEC 1, FLT CTL/SEC 2, FLT CTL/SEC 3, FAC 1 and FAC 2 pushbutton switches are pushed. Do a BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001) and make sure that there is no warning.
(21) Do a BITE test of the Electrical Flight Control System (EFCS) (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001) and make sure that there is no warning.
J. Power Plant
(1) Remove the HOT AIR BLOWER MAX OPERATING 55DEG C (131 DEG F) from the aircraft.
(2) Do the engine start procedure after the engine cold soak (Ref. AMM TASK 12-31-70-660-002).
Subtask 12-31-10-660-066-C ** ON A/C NOT FOR ALL (1) Remove the HOT AIR BLOWER MAX OPERATING 55DEG C (131 DEG F) from the aircraft.
(2) Do the engine start procedure after the engine cold soak (Ref. AMM TASK 12-31-70-660-002).
J. Power Plant
(1) Remove the HOT AIR BLOWER MAX OPERATING 55DEG C (131 DEG F) from the aircraft.
(2) Do the engine start procedure after the engine cold soak (Ref. AMM TASK 71-00-00-860-826).
(1) Remove the HOT AIR BLOWER MAX OPERATING 55DEG C (131 DEG F) from the aircraft.
(2) Do the engine start procedure after the engine cold soak (Ref. AMM TASK 71-00-00-860-826).