Installation of the Electronic Control Box (ECB) (APS 3200)
TASK 49-61-34-400-002-A
Installation of the Electronic Control Box (ECB) (APS 3200)
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 49-61-34-860-050-A ** ON A/C NOT FOR ALL
Subtask 49-61-34-420-052-A ** ON A/C NOT FOR ALL
Subtask 49-61-34-410-052-B ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:31:42 UTC
Installation of the Electronic Control Box (ECB) (APS 3200)
FIN: 59KD ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 162EW |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 25-55-12-000-003-A | Removal of the Sidewall Panels in the Aft Cargo Compartment - FR59/FR65 |
| TASK 25-55-12-400-003-A | Installation of the Sidewall Panels in the Aft Cargo Compartment - FR59/FR65 |
| TASK 31-32-00-860-001-A | Procedure to Get Access to the SYSTEM REPORT/TEST Menu Page |
| TASK 31-36-00-740-013-A | Update of the APU Hours and Cycles in the FDIMU after APU, ECB or FDIMU Replacement |
| TASK 49-00-00-860-011-A | Update of APU Data (hours/cycles) |
| TASK 52-30-00-860-008-A | Close the Bulk Cargo-Compartment Door |
Subtask 49-61-34-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration.
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) On the panel 25VU, make sure that the APU MASTER SW pushbutton switch is off.
(3) Make sure there is a warning notice in the cockpit to tell persons not to start the APU.
Subtask 49-61-34-865-059-A ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) On the panel 25VU, make sure that the APU MASTER SW pushbutton switch is off.
(3) Make sure there is a warning notice in the cockpit to tell persons not to start the APU.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 49-61-34-010-057-B ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | APU/APU/CTL | 2KD | L42 |
| 121VU | APU/ECB/SPLY | 1KD | L41 |
C. Get Access
(1) Make sure that the BULK cargo-compartment door 827 is open.
(2) Make sure that the ACCESS PLATFORM 2M (6 FT) is at the BULK cargo-compartment door 827.
(3) Make sure that the access panel 162EW is removed (Ref. AMM TASK 25-55-12-000-003).
4. Procedure(1) Make sure that the BULK cargo-compartment door 827 is open.
(2) Make sure that the ACCESS PLATFORM 2M (6 FT) is at the BULK cargo-compartment door 827.
(3) Make sure that the access panel 162EW is removed (Ref. AMM TASK 25-55-12-000-003).
Subtask 49-61-34-420-052-A ** ON A/C NOT FOR ALL
A. Install the Electronic Control Box (ECB)
(2) Put the ECB (3) in position on the tray (1).
(3) Carefully push the ECB (3) to engage the electrical connection (4).
(4) Make sure that the ECB (3) and the electrical connection (4) are fully engaged.
(5) Move the fluted knobs (2) upwards to engage the feet (5) on the front face of the ECB (3).
(6) Turn the fluted knobs (2) clockwise to tighten the ECB (3) in position on the rack (1). When the fluted knobs (2) are correctly tightened, the red marks on the threads are no longer seen.
Subtask 49-61-34-865-060-A ** ON A/C NOT FOR ALL WARNING:
SUPPORT THE UNIT/ASSEMBLY. THE UNIT/ASSEMBLY IS HEAVY. IF YOU DO NOT SUPPORT IT, IT WILL FALL. THIS CAN CAUSE INJURY TO PERSONS, AND/OR DAMAGE TO EQUIPMENT.
(1) Remove the blanking cap from the electrical connection (4). (2) Put the ECB (3) in position on the tray (1).
(3) Carefully push the ECB (3) to engage the electrical connection (4).
(4) Make sure that the ECB (3) and the electrical connection (4) are fully engaged.
(5) Move the fluted knobs (2) upwards to engage the feet (5) on the front face of the ECB (3).
(6) Turn the fluted knobs (2) clockwise to tighten the ECB (3) in position on the rack (1). When the fluted knobs (2) are correctly tightened, the red marks on the threads are no longer seen.
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 49-61-34-740-071-B ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | APU/APU/CTL | 2KD | L42 |
| 121VU | APU/ECB/SPLY | 1KD | L41 |
C. Update the ECB with the APU HOURS/CYCLES and the ECB self-test:
(1) On panel 25VU, set the APU MASTER SW pushbutton to ON.
(2) Make sure that the APU offsets are set to zero (Ref. AMM TASK 31-36-00-740-004).
(3) Update the APU hours and cycles with:
(5) Do this test.
5. Close-up(1) On panel 25VU, set the APU MASTER SW pushbutton to ON.
(2) Make sure that the APU offsets are set to zero (Ref. AMM TASK 31-36-00-740-004).
(3) Update the APU hours and cycles with:
- The DMU (Ref. AMM D/O 31-36-00-74), or
- The Flight Data Interface and Management Unit (FDIMU) (Ref. AMM TASK 31-36-00-740-013), or
- The ECB (Ref. AMM TASK 49-00-00-860-011).
(5) Do this test.
| ACTION | RESULT |
|---|---|
1.On the MCDU:
| On the MCDU:
|
| |
|
| |
|
|
|
|
|
|
|
Subtask 49-61-34-410-052-B ** ON A/C NOT FOR ALL
A. Close Access
(1) Set the APU MASTER SW pushbutton switch to the OFF position.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Install the access panel 162EW (Ref. AMM TASK 25-55-12-400-003).
(4) Close the BULK cargo-compartment door 827 (Ref. AMM TASK 52-30-00-860-008)
(5) Remove the access platform(s).
Subtask 49-61-34-860-053-A ** ON A/C NOT FOR ALL (1) Set the APU MASTER SW pushbutton switch to the OFF position.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Install the access panel 162EW (Ref. AMM TASK 25-55-12-400-003).
(4) Close the BULK cargo-compartment door 827 (Ref. AMM TASK 52-30-00-860-008)
(5) Remove the access platform(s).
B. Aircraft Maintenance Configuration.
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
ECB - Removal/Installation