Functional Check of Parking/Emergency Brake Accumulator by Reading the Charge Pressure on the Accumulator Gauge
TASK 32-44-11-200-001-A
Functional Check of Parking/Emergency Brake Accumulator by Reading the Charge Pressure on the Accumulator Gauge
Refer to the MPD TASK: 324411-01
FUNCTIONAL CHECK OF PARKING/EMERGENCY BRAKE ACCUMULATOR BY READING THE CHARGE PRESSURE ON THE ACCUMULATOR GAUGE
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 32-44-11-860-054-A
Subtask 32-44-11-210-050-A ** ON A/C NOT FOR ALL
Subtask 32-44-11-942-053-A
[Rev.10 from 2021]
2026.04.01 00:49:31 UTC
Functional Check of Parking/Emergency Brake Accumulator by Reading the Charge Pressure on the Accumulator Gauge
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobRefer to the MPD TASK: 324411-01
FUNCTIONAL CHECK OF PARKING/EMERGENCY BRAKE ACCUMULATOR BY READING THE CHARGE PRESSURE ON THE ACCUMULATOR GAUGE
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 1 | THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) |
| No specific | AR | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.14CCB6) | Testing Medium-Leak Detection - Oxygen System |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 148 | MAIN GEAR WELL AND HYDRAULIC COMPARTMENT |
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| 744 | MAIN DOOR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-14-32-614-002-A | Nitrogen Filling of the Yellow Hydraulic System, Brake Pressure Accumulator |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-00-00-870-007-A | Bleeding Procedure of the Yellow Hydraulic System Downstream of the Engine Pump |
| TASK 29-10-00-864-004-A | Depressurize the Brake System |
| TASK 29-24-00-863-001-A | Pressurize the Yellow Hydraulic System with the Electric Pump |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
| TASK 32-43-00-710-001-A | Operational Check of Alternate Braking System |
| TASK 32-44-11-000-001-A | Removal of the Accumulator |
| TASK 32-44-11-400-001-A | Installation of the Accumulator |
| TASK 32-44-13-000-001-A | Removal of the Charging Valve |
| TASK 32-44-13-400-001-A | Installation of the Charging Valve |
| TASK 32-44-14-000-001-A | Removal of the Accumulator Pressure Gage |
| TASK 32-44-14-400-001-A | Installation of the Accumulator Pressure Gage |
Subtask 32-44-11-860-054-A
A. Aircraft Maintenance Configuration
(1) Make sure that the wheel chocks are in position.
(2) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
(3) On the parking brake panel 110VU, make sure that the PARKING BRK control-switch (73GG) is in the OFF position.
(4) Make sure that the Yellow hydraulic system is depressurized.
(Ref. AMM TASK 29-00-00-864-001).
Subtask 32-44-11-865-055-A (1) Make sure that the wheel chocks are in position.
(2) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
(3) On the parking brake panel 110VU, make sure that the PARKING BRK control-switch (73GG) is in the OFF position.
(4) Make sure that the Yellow hydraulic system is depressurized.
(Ref. AMM TASK 29-00-00-864-001).
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 32-44-11-941-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY | 4GG | M36 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/CTL | 3GG | M35 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/CTL | 1GG | M34 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY | 2GG | M33 |
C. Safety Precaution
(1) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the yellow hydraulic
Subtask 32-44-11-010-052-A (1) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the yellow hydraulic
- on the panel 40 VU in the cockpit
- on the Ground Service Panel of the yellow hydraulic system, access door 198CB
D. Get Access
(1) Open the main door of the right main landing gear (Ref. AMM TASK 32-12-00-010-001).
(2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position in zone 148.
4. Procedure(1) Open the main door of the right main landing gear (Ref. AMM TASK 32-12-00-010-001).
(2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position in zone 148.
Subtask 32-44-11-210-050-A ** ON A/C NOT FOR ALL
A. Check of the Nitrogen Fill Pressure
(1) Depressurize the brake system (Ref. AMM TASK 29-10-00-864-004).
(2) Wait for a minimum of ten minutes before you read the brake accumulator pressure-gage (2585GM).
(a) Use a THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) to measure and record the temperature of the brake accumulator (2582GM).
1 When you measure the temperature, make sure that the THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) touches the gas interface/neck of the brake accumulator (2582GM).
(4) Read the nitrogen pressure value of the brake accumulator (2582GM) on the brake accumulator pressure-gage (2585GM). Compare the nitrogen pressure value on the brake accumulator pressure-gage (2585GM) with the graph of the accumulator nitrogen fill-pressure.
(a) If the value on the brake accumulator pressure-gage (2585GM) is correct (value "P" plus or minus 50 psi (3.45 bar)):
1 Adjust the nitrogen pressure as necessary (Ref. AMM TASK 12-14-32-614-002).
2 Pressurize and depressurize the brake accumulator (2582GM) as follows:
a Pressurize the Yellow hydraulic system with the electric pump (Ref. AMM TASK 29-24-00-863-001).
b In the cockpit, do a check of the brake accumulator pressure on the triple pressure-indicator (60GG).
d On the brake manifold (3016GM), operate the manual depressurization button on the brake relief-valve (3067GM) to depressurize the brake accumulator (2582GM) (Ref. AMM TASK 29-10-00-864-004).
3 After 10 minutes, do the check of the value again on the brake accumulator pressure-gage (2585GM).
a If the accumulator pressure value is correct, "P" plus or minus 102 psi (7 bar):
b If you cannot stop the nitrogen leaks, replace the defective component(s) as necessary:
Subtask 32-44-11-210-050-B ** ON A/C NOT FOR ALL (1) Depressurize the brake system (Ref. AMM TASK 29-10-00-864-004).
(2) Wait for a minimum of ten minutes before you read the brake accumulator pressure-gage (2585GM).
NOTE: This gives time for the temperature of the gas to become stable. The pressure can increase during this time.
NOTE: If you do this check immediately after the aircraft landing, let the pressure become stable for 30 minutes to get a more accurate value (temperature compensation of the brake accumulator (2582GM)).
(3) Do a check of the charge pressure of the brake accumulator (2582GM) as follows: (a) Use a THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) to measure and record the temperature of the brake accumulator (2582GM).
1 When you measure the temperature, make sure that the THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) touches the gas interface/neck of the brake accumulator (2582GM).
(4) Read the nitrogen pressure value of the brake accumulator (2582GM) on the brake accumulator pressure-gage (2585GM). Compare the nitrogen pressure value on the brake accumulator pressure-gage (2585GM) with the graph of the accumulator nitrogen fill-pressure.
(a) If the value on the brake accumulator pressure-gage (2585GM) is correct (value "P" plus or minus 50 psi (3.45 bar)):
- No other maintenance is necessary, go to Para. 4.B.
- Adjust the nitrogen pressure as necessary (Ref. AMM TASK 12-14-32-614-002).
- Adjust the nitrogen pressure as necessary (Ref. AMM TASK 12-14-32-614-002).
1 Adjust the nitrogen pressure as necessary (Ref. AMM TASK 12-14-32-614-002).
2 Pressurize and depressurize the brake accumulator (2582GM) as follows:
a Pressurize the Yellow hydraulic system with the electric pump (Ref. AMM TASK 29-24-00-863-001).
b In the cockpit, do a check of the brake accumulator pressure on the triple pressure-indicator (60GG).
- Let the pressure increase to between 2800 psi (193 bar) and 3200 psi (221 bar) and become stable.
d On the brake manifold (3016GM), operate the manual depressurization button on the brake relief-valve (3067GM) to depressurize the brake accumulator (2582GM) (Ref. AMM TASK 29-10-00-864-004).
3 After 10 minutes, do the check of the value again on the brake accumulator pressure-gage (2585GM).
a If the accumulator pressure value is correct, "P" plus or minus 102 psi (7 bar):
- No other maintenance is necessary, go to Para. 4.B.
- Decrease the accumulator pressure to the correct value "P".
- Do the next step.
- The charging valve (2586GM)
- The brake accumulator pressure-gage (2585GM)
- The adapter at the top end of the brake accumulator (2582GM).
b If you cannot stop the nitrogen leaks, replace the defective component(s) as necessary:
- Replace the brake accumulator (2582GM) and/or its adapter (Ref. AMM TASK 32-44-11-000-001) and (Ref. AMM TASK 32-44-11-400-001).
- Replace the brake accumulator pressure-gage (2585GM) (Ref. AMM TASK 32-44-14-000-001) and (Ref. AMM TASK 32-44-14-400-001).
- Replace the charging valve (2586GM) (Ref. AMM TASK 32-44-13-000-001) and (Ref. AMM TASK 32-44-13-400-001).
- Replace the brake accumulator (2582GM) (Ref. AMM TASK 32-44-11-000-001) and (Ref. AMM TASK 32-44-11-400-001).
- Bleed the Yellow hydraulic system downstream of the engine pump to remove the nitrogen that can be in the hydraulic system (because of the brake accumulator (2582GM)) (Ref. AMM TASK 29-00-00-870-007).
A. Check of the Nitrogen Fill Pressure
(1) Depressurize the brake system (Ref. AMM TASK 29-10-00-864-004).
(2) Wait for a minimum of ten minutes before you read the brake accumulator pressure-gage (2585GM).
(a) Use a THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) to measure and record the temperature of the brake accumulator (2582GM).
1 When you measure the temperature, make sure that the THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) touches the gas interface/neck of the brake accumulator (2582GM).
(4) Read the nitrogen pressure value of the brake accumulator (2582GM) on the brake accumulator pressure-gage (2585GM). Compare the nitrogen pressure value on the brake accumulator pressure-gage (2585GM) with the graph of the accumulator nitrogen fill-pressure.
(a) If the value on the brake accumulator pressure-gage (2585GM) is correct ("P" plus or minus 50 psi (3.45 bar)):
1 Adjust the nitrogen pressure as necessary (Ref. AMM TASK 12-14-32-614-002).
2 Pressurize and depressurize the brake accumulator (2582GM) as follows:
a Pressurize the Yellow hydraulic system with the electric pump (Ref. AMM TASK 29-24-00-863-001).
b In the cockpit, do a check of the brake accumulator pressure on the triple pressure-indicator (60GG).
d On the brake manifold (3016GM), operate the manual depressurization button on the brake relief-valve (3067GM) to depressurize the brake accumulator (2582GM) (Ref. AMM TASK 29-10-00-864-004).
3 After 10 minutes, do the check of the value again on the brake accumulator pressure-gage (2585GM).
a If the accumulator pressure value is correct, "P" plus or minus 102 psi (7 bar):
b If you cannot stop the nitrogen leaks, replace the defective component(s) as necessary:
Subtask 32-44-11-210-050-C ** ON A/C NOT FOR ALL (1) Depressurize the brake system (Ref. AMM TASK 29-10-00-864-004).
(2) Wait for a minimum of ten minutes before you read the brake accumulator pressure-gage (2585GM).
NOTE: This gives time for the temperature of the gas to become stable. The pressure can increase during this time.
NOTE: If you do this check immediately after the aircraft landing, let the pressure become stable for 30 minutes to get a more accurate value (temperature compensation of the brake accumulator (2582GM)).
(3) Do a check of the charge pressure of the brake accumulator (2582GM) as follows: (a) Use a THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) to measure and record the temperature of the brake accumulator (2582GM).
1 When you measure the temperature, make sure that the THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) touches the gas interface/neck of the brake accumulator (2582GM).
(4) Read the nitrogen pressure value of the brake accumulator (2582GM) on the brake accumulator pressure-gage (2585GM). Compare the nitrogen pressure value on the brake accumulator pressure-gage (2585GM) with the graph of the accumulator nitrogen fill-pressure.
(a) If the value on the brake accumulator pressure-gage (2585GM) is correct ("P" plus or minus 50 psi (3.45 bar)):
- No other maintenance is necessary, go to Para. 4.B.
- Adjust the nitrogen pressure as necessary (Ref. AMM TASK 12-14-32-614-002).
- Adjust the nitrogen pressure as necessary (Ref. AMM TASK 12-14-32-614-002).
1 Adjust the nitrogen pressure as necessary (Ref. AMM TASK 12-14-32-614-002).
2 Pressurize and depressurize the brake accumulator (2582GM) as follows:
a Pressurize the Yellow hydraulic system with the electric pump (Ref. AMM TASK 29-24-00-863-001).
b In the cockpit, do a check of the brake accumulator pressure on the triple pressure-indicator (60GG).
- Let the pressure increase to between 2800 psi (193 bar) and 3200 psi (221 bar) and become stable.
d On the brake manifold (3016GM), operate the manual depressurization button on the brake relief-valve (3067GM) to depressurize the brake accumulator (2582GM) (Ref. AMM TASK 29-10-00-864-004).
3 After 10 minutes, do the check of the value again on the brake accumulator pressure-gage (2585GM).
a If the accumulator pressure value is correct, "P" plus or minus 102 psi (7 bar):
- No other maintenance is necessary, go to Para. 4.B.
- Decrease the accumulator pressure to the correct value "P".
- Do the next step.
- The charging valve (2586GM)
- The brake accumulator pressure-gage (2585GM)
- The adapter at the top end of the brake accumulator (2582GM).
b If you cannot stop the nitrogen leaks, replace the defective component(s) as necessary:
- Replace the brake accumulator (2582GM) and/or its adapter (Ref. AMM TASK 32-44-11-000-001) and (Ref. AMM TASK 32-44-11-400-001).
- Replace the brake accumulator pressure-gage (2585GM) (Ref. AMM TASK 32-44-14-000-001) and (Ref. AMM TASK 32-44-14-400-001).
- Replace the charging valve (2586GM) (Ref. AMM TASK 32-44-13-000-001) and (Ref. AMM TASK 32-44-13-400-001).
- Replace the brake accumulator (2582GM) (Ref. AMM TASK 32-44-11-000-001) and (Ref. AMM TASK 32-44-11-400-001).
- Bleed the Yellow hydraulic system downstream of the engine pump to remove the nitrogen that can be in the hydraulic system (because of the brake accumulator (2582GM)) (Ref. AMM TASK 29-00-00-870-007).
A. Check of the Nitrogen Fill Pressure
(1) Depressurize the brake system (Ref. AMM TASK 29-10-00-864-004).
(2) Wait for a minimum of ten minutes before you read the brake accumulator pressure-gage (2585GM).
(a) Use a THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) to measure and record the temperature of the brake accumulator (2582GM).
1 When you measure the temperature, make sure that the THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) touches the gas interface/neck of the brake accumulator (2582GM).
(4) Read the nitrogen pressure value of the brake accumulator (2582GM) on the brake accumulator pressure-gage (2585GM). Compare the nitrogen pressure value on the brake accumulator pressure-gage (2585GM) with the graph of the accumulator nitrogen fill-pressure.
(a) If the value on the brake accumulator pressure-gage (2585GM) is correct ("P" plus or minus 50 psi (3.45 bar)):
1 Adjust the nitrogen pressure as necessary (Ref. AMM TASK 12-14-32-614-002).
2 Pressurize and depressurize the brake accumulator (2582GM) as follows:
a Pressurize the Yellow hydraulic system with the electric pump (Ref. AMM TASK 29-24-00-863-001).
b In the cockpit, do a check of the brake accumulator pressure on the triple pressure-indicator (60GG).
d On the brake manifold (3016GM), operate the manual depressurization button on the brake relief-valve (3067GM) to depressurize the brake accumulator (2582GM) (Ref. AMM TASK 29-10-00-864-004).
3 After 10 minutes, do the check of the value again on the brake accumulator pressure-gage (2585GM).
a If the accumulator pressure value is correct, "P" plus or minus 102 psi (7 bar):
b If you cannot stop the nitrogen leaks, replace the defective component(s) as necessary:
Subtask 32-44-11-865-060-A (1) Depressurize the brake system (Ref. AMM TASK 29-10-00-864-004).
(2) Wait for a minimum of ten minutes before you read the brake accumulator pressure-gage (2585GM).
NOTE: This gives time for the temperature of the gas to become stable. The pressure can increase during this time.
NOTE: If you do this check immediately after the aircraft landing, let the pressure become stable for 30 minutes to get a more accurate value (temperature compensation of the brake accumulator (2582GM)).
(3) Do a check of the charge pressure of the brake accumulator (2582GM) as follows: (a) Use a THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) to measure and record the temperature of the brake accumulator (2582GM).
1 When you measure the temperature, make sure that the THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) touches the gas interface/neck of the brake accumulator (2582GM).
(4) Read the nitrogen pressure value of the brake accumulator (2582GM) on the brake accumulator pressure-gage (2585GM). Compare the nitrogen pressure value on the brake accumulator pressure-gage (2585GM) with the graph of the accumulator nitrogen fill-pressure.
(a) If the value on the brake accumulator pressure-gage (2585GM) is correct ("P" plus or minus 50 psi (3.45 bar)):
- No other maintenance is necessary, go to Para. 4.B.
- Adjust the nitrogen pressure as necessary (Ref. AMM TASK 12-14-32-614-002).
- Adjust the nitrogen pressure as necessary (Ref. AMM TASK 12-14-32-614-002).
1 Adjust the nitrogen pressure as necessary (Ref. AMM TASK 12-14-32-614-002).
2 Pressurize and depressurize the brake accumulator (2582GM) as follows:
a Pressurize the Yellow hydraulic system with the electric pump (Ref. AMM TASK 29-24-00-863-001).
b In the cockpit, do a check of the brake accumulator pressure on the triple pressure-indicator (60GG).
- Let the pressure increase to between 2800 psi (193 bar) and 3200 psi (221 bar) and become stable.
d On the brake manifold (3016GM), operate the manual depressurization button on the brake relief-valve (3067GM) to depressurize the brake accumulator (2582GM) (Ref. AMM TASK 29-10-00-864-004).
3 After 10 minutes, do the check of the value again on the brake accumulator pressure-gage (2585GM).
a If the accumulator pressure value is correct, "P" plus or minus 102 psi (7 bar):
- No other maintenance is necessary, go to Para. 4.B.
- Decrease the accumulator pressure to the correct value "P".
- Do the next step.
- The charging valve (2586GM)
- The brake accumulator pressure-gage (2585GM)
- The adapter at the top end of the brake accumulator (2582GM).
b If you cannot stop the nitrogen leaks, replace the defective component(s) as necessary:
- Replace the brake accumulator (2582GM) and/or its adapter (Ref. AMM TASK 32-44-11-000-001) and (Ref. AMM TASK 32-44-11-400-001).
- Replace the brake accumulator pressure-gage (2585GM) (Ref. AMM TASK 32-44-14-000-001) and (Ref. AMM TASK 32-44-14-400-001).
- Replace the charging valve (2586GM) (Ref. AMM TASK 32-44-13-000-001) and (Ref. AMM TASK 32-44-13-400-001).
- Replace the brake accumulator (2582GM) (Ref. AMM TASK 32-44-11-000-001) and (Ref. AMM TASK 32-44-11-400-001).
- Bleed the Yellow hydraulic system downstream of the engine pump to remove the nitrogen that can be in the hydraulic system (because of the brake accumulator (2582GM)) (Ref. AMM TASK 29-00-00-870-007).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 32-44-11-710-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY | 4GG | M36 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/CTL | 3GG | M35 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/CTL | 1GG | M34 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY | 2GG | M33 |
C. Test(s)
(1) Do the operational check of the alternate braking system (Ref. AMM TASK 32-43-00-710-001).
5. Close-up(1) Do the operational check of the alternate braking system (Ref. AMM TASK 32-43-00-710-001).
Subtask 32-44-11-942-053-A
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the warning notice(s).
(3) Remove the access platform.
Subtask 32-44-11-410-050-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the warning notice(s).
(3) Remove the access platform.
B. Close Access
(1) Close the main door of the right main landing gear (Ref. AMM TASK 32-12-00-410-001)
Subtask 32-44-11-862-050-A (1) Close the main door of the right main landing gear (Ref. AMM TASK 32-12-00-410-001)
C. Aircraft Maintenance Configuration
(1) Put the aircraft back to its initial configuration.
(2) De-energize the Ground Service Network (Ref. AMM TASK 24-42-00-862-001).
(1) Put the aircraft back to its initial configuration.
(2) De-energize the Ground Service Network (Ref. AMM TASK 24-42-00-862-001).
Accumulator Nitrogen Fill-Pressure