W DOC AIRBUS | AMM A320F

Installation of the Electronic Engine Control (EEC) Wiring Harness (WC11) [PW11]


TASK 73-21-70-400-802-A
Installation of the Electronic Engine Control (EEC) Wiring Harness (WC11)


WARNING: BE CAREFUL WHEN YOU DO WORK ON THE ENGINE AFTER SHUTDOWN. THE ENGINE CAN STAY HOT FOR A LONG TIME. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY CAN OCCUR.
CAUTION: DO NOT BEND OR TWIST THE HARNESS TOO MUCH. IF YOU DO, DAMAGE TO THE HARNESS CAN OCCUR.
FIN: 4072KS ** ON A/C NOT FOR ALL
1. Reason for the Job
Use this procedure to install the harness (WC11).
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE
No specific
1
PLIERS - JAWED, SOFT
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL, 438AR, 451AL
FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL, 448AR, 461AL
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 71-00-00-860-832-A
Procedure to Prevent Engine Motoring and to Stop the Electrical Supply to the EEC
TASK 71-13-00-010-802-A
Opening of the Fan Cowl Doors
TASK 71-13-00-410-802-A
Closing of the Fan Cowl Doors
TASK 73-21-00-710-806-A
Test No.7 - EEC Operation Test (Self Test)
TASK 73-25-34-400-802-A
Installation of the Engine Interface Unit (EIU)
TASK 78-30-00-040-805-A
Deactivation of the Thrust Reverser System for Ground Maintenance
TASK 78-30-00-440-805-A
Reactivation of the Thrust Reverser System after Ground Maintenance
TASK 78-36-00-010-802-A
Opening of the Thrust Reverser Cowl-Doors
TASK 78-36-00-410-802-A
Closing of the Thrust Reverser Cowl-Doors
3. Job Set-up
Subtask 73-21-70-941-053-A ** ON A/C NOT FOR ALL
A. Safety Precautions
   (1) Make sure that you did the procedure to prevent engine motoring and to stop the electrical supply to the Electronic Engine Control (EEC)
(Ref. AMM TASK 71-00-00-860-832).
Subtask 73-21-70-010-058-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-802):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL, 438AR
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL, 448AR
Subtask 73-21-70-040-055-A ** ON A/C NOT FOR ALL
C. Deactivation of the Thrust Reverser System for Maintenance
WARNING: YOU MUST DEACTIVATE THE THRUST REVERSER BEFORE YOU DO WORK ON OR AROUND IT. IF YOU DO NOT, THE THRUST REVERSER CAN OPERATE ACCIDENTALLY AND CAUSE AN INJURY AND/OR DAMAGE.
   (1) Make sure that you did the deactivation of the thrust reverser system for maintenance (Ref. AMM TASK 78-30-00-040-805).
Subtask 73-21-70-010-059-A ** ON A/C NOT FOR ALL
D. Get Access
   (1) Make sure that the left thrust reverser cowl-doors are open (Ref. AMM TASK 78-36-00-010-802):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL
   (2) Make sure that the ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE is in position.
4. Procedure
Subtask 73-21-70-420-052-A ** ON A/C NOT FOR ALL
A. Installation of the EEC Wiring Harness WC11
CAUTION: WIPE CLEAN ALL PARTS AND TOOLS AS NECESSARY TO REMOVE UNWANTED DEBRIS AND PREVENT DAMAGE TO THE ENGINE.
   (1) Removal of the protection covers
CAUTION: REMOVE THE PROTECTION COVERS FROM THE OPENINGS AS NECESSARY TO PREVENT ENGINE DAMAGE.
     (a) Make sure that you remove all the necessary COVER - PROTECTION to prevent damage to the engine.
   (2) Route the harness (WC11) (1) along the engine. See sheet 1 of the figure.
   (3) Connect the harness (WC11) (1) connectors to the engine as follows:
     (a) Connect the connector (P105) to the harness (W04) receptacle (J105) as follows: See the sheet 2 of the figure.
       1 Examine, align and engage the connector.
       2 Push lightly in on the connector while you tighten the coupling ring.
       3 Use the PLIERS - JAWED, SOFT to tighten the connector against the receptacle.
       4 Make sure that you can feel the ratchet feature.
       5 While you tighten, push the connector in and from side to side.
       6 Tighten the connector until the PLIERS - JAWED, SOFT slip on the connector ring.
     (b) Connect the connector (P37) to the fuel differential pressure sensor receptacle (J37) as follows: See the sheet 3 of the figure.
       1 Examine, align and engage the connector.
       2 Push lightly in on the connector while you tighten the coupling ring.
       3 Use the PLIERS - JAWED, SOFT to tighten the connector against the receptacle.
       4 Make sure that you can feel the ratchet feature.
       5 While you tighten, push the connector in and from side to side.
       6 Tighten the connector until the PLIERS - JAWED, SOFT slip on the connector ring.
     (c) Connect the connector (P68) to the fuel return to tank valve receptacle (J68) as follows:
       1 Examine, align and engage the connector.
       2 Push lightly in on the connector while you tighten the coupling ring.
       3 Use the PLIERS - JAWED, SOFT to tighten the connector against the receptacle.
       4 Make sure that you can feel the ratchet feature.
       5 While you tighten, push the connector in and from side to side.
       6 Tighten the connector until the PLIERS - JAWED, SOFT slip on the connector ring.
   (4) Install the harness (WC11) (1) to the eight spring clips as follows: See the sheet 4 of the figure.
     (a) Start at the middle of the harness (WC11) (1).
     (b) Position and press the harness (WC11) (1) into the eight spring clips.
     (c) Make sure that all the spring clips engage with the harness (WC11) (1).
     (d) Make sure that the tension in the harness (WC11) (1) is sufficient to prevent loose or tight conditions.
   (5) Examine the harness (WC11) (1) for contact with the engine hardware which can cause chafing.
   (6) Examine the assembly for foreign objects, damage and correct assembly.
5. Close-up
Subtask 73-21-70-942-052-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the WARNING NOTICE(S).
Subtask 73-21-70-710-052-A ** ON A/C NOT FOR ALL
B. Test
   (1) Make sure that all the circuit breakers shown in the paragraph Procedure of the engine interface unit installation are closed. If they are not, close them in the recommended sequence
(Ref. AMM TASK 73-25-34-400-802)
   (2) Do the Test No. 7 - FADEC System - EEC - Self-Test (Ref. AMM TASK 73-21-00-710-806).
Subtask 73-21-70-410-054-A ** ON A/C NOT FOR ALL
C. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the left thrust reverser cowl-doors (Ref. AMM TASK 78-36-00-410-802):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL
Subtask 73-21-70-440-052-A ** ON A/C NOT FOR ALL
D. Do the reactivation of the thrust reverser system after maintenance (Ref. AMM TASK 78-30-00-440-805).
Subtask 73-21-70-410-055-A ** ON A/C NOT FOR ALL
E. Close Access
   (1) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-802):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR
   (2) Remove the access platform(s).