Installation of the Thermal Blankets between RIB1 and RIB5
TASK 54-51-61-400-801-A
Installation of the Thermal Blankets between RIB1 and RIB5
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 54-51-61-941-051-A ** ON A/C NOT FOR ALL
Subtask 54-51-61-420-052-A ** ON A/C NOT FOR ALL
Subtask 54-51-61-410-052-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 06:43:22 UTC
Installation of the Thermal Blankets between RIB1 and RIB5
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 410 | ENG 1 PYLON BOX AND FORWARD FAIRING |
| 420 | ENG 2 PYLON BOX AND FORWARD FAIRING |
| FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2) | |
| 447AL, 448AR, 461AL, 462AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 26-12-16-400-802-A | Installation of the Pylon Fire-Detector Ramp-Assembly |
| TASK 26-21-49-400-803-A | Installation of the Engine Fire-Extinguishing Pipe (Aft Part) |
| TASK 71-00-00-860-833-A | Procedure to Prevent Engine Motoring |
| TASK 71-13-00-010-802-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-802-A | Closing of the Fan Cowl Doors |
| TASK 78-30-00-040-805-A | Deactivation of the Thrust Reverser System for Ground Maintenance |
| TASK 78-30-00-440-805-A | Reactivation of the Thrust Reverser System after Ground Maintenance |
| TASK 78-36-00-010-802-A | Opening of the Thrust Reverser Cowl-Doors |
| TASK 78-36-00-410-802-A | Closing of the Thrust Reverser Cowl-Doors |
Subtask 54-51-61-941-051-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) Make sure that you did the procedure to prevent engine motoring
(Ref. AMM TASK 71-00-00-860-833).
Subtask 54-51-61-040-051-A ** ON A/C NOT FOR ALL (1) Make sure that you did the procedure to prevent engine motoring
(Ref. AMM TASK 71-00-00-860-833).
B. Deactivation of the Thrust Reverser
Subtask 54-51-61-010-053-A ** ON A/C NOT FOR ALL WARNING:
MAKE SURE THAT THE THRUST REVERSER IS LOCKED. IF NOT, THE THRUST REVERSER CAN OPERATE ACCIDENTALLY AND CAUSE INJURY TO PERSONNEL AND/OR DAMAGE TO THE REVERSER.
(1) Make sure that the thrust reverser is unserviceable for maintenance (Ref. AMM TASK 78-30-00-040-805). C. Get access
(1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR.
(2) Make sure that the thrust-reverser cowl doors are open (Ref. AMM TASK 78-36-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL 462AR.
(3) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position:
(a) For the left pylon, in zone 415
(b) For the right pylon, in zone 425.
Subtask 54-51-61-110-050-A ** ON A/C NOT FOR ALL (1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR.
(2) Make sure that the thrust-reverser cowl doors are open (Ref. AMM TASK 78-36-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL 462AR.
(3) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position:
(a) For the left pylon, in zone 415
(b) For the right pylon, in zone 425.
D. Preparation for Installation
(1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) If they are not sufficiently clean, clean the parts retained from the removed component with Non Aqueous Cleaner-General - - (Material No.08BAA9) and Textile-Lint free Cotton - (Material No.14SBA1) .
(3) Do an inspection of the component interfaces and the adjacent area.
4. Procedure(1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) If they are not sufficiently clean, clean the parts retained from the removed component with Non Aqueous Cleaner-General - - (Material No.08BAA9) and Textile-Lint free Cotton - (Material No.14SBA1) .
(3) Do an inspection of the component interfaces and the adjacent area.
Subtask 54-51-61-420-052-A ** ON A/C NOT FOR ALL
A. Installation of the Thermal Blankets between RIB1 and RIB5
(1) Put and hold the thermal blankets (1) and (3) in position.
(2) Install the washers (4) and the bolts (5).
(3) Tighten the bolts (5).
(4) Put the fire ramp bracket (2) in position.
(5) Install the washers (7) and the bolts (6).
(6) Tighten the bolts (6).
(7) Remove the blanking plug from the disconnected pipe end.
(8) Connect the engine fire-extinguishing pipe (8) to its connection between RIB3 and RIB4 (Ref. AMM TASK 26-21-49-400-803).
5. Close-up(1) Put and hold the thermal blankets (1) and (3) in position.
(2) Install the washers (4) and the bolts (5).
(3) Tighten the bolts (5).
(4) Put the fire ramp bracket (2) in position.
(5) Install the washers (7) and the bolts (6).
(6) Tighten the bolts (6).
(7) Remove the blanking plug from the disconnected pipe end.
(8) Connect the engine fire-extinguishing pipe (8) to its connection between RIB3 and RIB4 (Ref. AMM TASK 26-21-49-400-803).
Subtask 54-51-61-410-052-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Install the pylon fire-detector ramp-assembly (Ref. AMM TASK 26-12-16-400-802).
(2) Close the thrust-reverser cowl doors (Ref. AMM TASK 78-36-00-410-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL 462AR.
(3) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR.
Subtask 54-51-61-440-050-A ** ON A/C NOT FOR ALL (1) Install the pylon fire-detector ramp-assembly (Ref. AMM TASK 26-12-16-400-802).
(2) Close the thrust-reverser cowl doors (Ref. AMM TASK 78-36-00-410-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL 462AR.
(3) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR.
B. Reactivation of the Thrust Reverser
(1) Make the thrust reverser serviceable after maintenance (Ref. AMM TASK 78-30-00-440-805).
Subtask 54-51-61-942-050-A ** ON A/C NOT FOR ALL (1) Make the thrust reverser serviceable after maintenance (Ref. AMM TASK 78-30-00-440-805).
C. Aircraft Maintenance Configuration
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
(3) Remove the WARNING NOTICE(S).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
(3) Remove the WARNING NOTICE(S).
Thermal Blankets between RIB1 and RIB5