Installation of the Pylon Fire-Detector Ramp-Assembly
TASK 26-12-16-400-802-A
Installation of the Pylon Fire-Detector Ramp-Assembly
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 26-12-16-861-053-A ** ON A/C NOT FOR ALL Subtask 26-12-16-860-059-A ** ON A/C NOT FOR ALL
Subtask 26-12-16-420-055-A ** ON A/C NOT FOR ALL
Subtask 26-12-16-420-056-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:42:50 UTC
Installation of the Pylon Fire-Detector Ramp-Assembly
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE AFTER SHUTDOWN. THE ENGINE CAN STAY HOT FOR A LONG TIME. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY CAN OCCUR.
WARNING:
ALWAYS USE APPLICABLE GLOVES TO TOUCH HOT PARTS. HOT PARTS CAN CAUSE INJURY TO PERSONS.
ZONE: 415
ZONE: 425
FIN: 3WD1 ** ON A/C NOT FOR ALL
FIN: 3WD2 ** ON A/C NOT FOR ALL
FIN: 4WD1 ** ON A/C NOT FOR ALL
FIN: 4WD2 ** ON A/C NOT FOR ALL
1. Reason for the JobZONE: 425
FIN: 3WD1 ** ON A/C NOT FOR ALL
FIN: 3WD2 ** ON A/C NOT FOR ALL
FIN: 4WD1 ** ON A/C NOT FOR ALL
FIN: 4WD2 ** ON A/C NOT FOR ALL
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 415 | LOWER PYLON |
| 425 | LOWER PYLON |
| FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2) | |
| 447AL, 448AR, 461AL, 462AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 26-12-00-710-001-A | Operational Check of Loop/Squib |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 36-11-49-000-824-A | Removal of the Environmental Control System (ECS) Interface Duct |
| TASK 36-11-49-400-824-A | Installation of the Environmental Control System (ECS) Interface Duct |
| TASK 36-11-53-000-802-A | Removal of the Overpressure Valve |
| TASK 36-11-53-400-802-A | Installation of the Overpressure Valve |
| TASK 71-00-00-860-833-A | Procedure to Prevent Engine Motoring |
| TASK 71-13-00-010-802-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-802-A | Closing of the Fan Cowl Doors |
| TASK 75-25-49-000-802-A | Removal of the Turbine Cooling Air System |
| TASK 75-25-49-400-802-A | Installation of the Turbine Cooling Air System |
| TASK 78-30-00-040-805-A | Deactivation of the Thrust Reverser System for Ground Maintenance |
| TASK 78-30-00-440-805-A | Reactivation of the Thrust Reverser System after Ground Maintenance |
| TASK 78-36-00-010-802-A | Opening of the Thrust Reverser Cowl-Doors |
| TASK 78-36-00-410-802-A | Closing of the Thrust Reverser Cowl-Doors |
Subtask 26-12-16-861-053-A ** ON A/C NOT FOR ALL Subtask 26-12-16-860-059-A ** ON A/C NOT FOR ALL
B. Safety Precautions
(1) Make sure that you did the procedure to prevent engine motoring
(Ref. AMM TASK 71-00-00-860-833).
Subtask 26-12-16-865-059-A ** ON A/C NOT FOR ALL (1) Make sure that you did the procedure to prevent engine motoring
(Ref. AMM TASK 71-00-00-860-833).
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 26-12-16-010-062-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 4020KM1 (POWER PLANTDEMOUNTABLE, ENG 1) | |||
| 49VU | ENGINE/1/FIRE DET/LOOP A | 7WD1 | A06 |
| 121VU | ENGINE/ENG1/FIRE DET/LOOP B | 8WD1 | Q38 |
| FOR FIN: 4020KM2 (POWER PLANTDEMOUNTABLE, ENG 2) | |||
| 49VU | ENGINE/2/FIRE DET/LOOP B | 8WD2 | A07 |
| 121VU | ENGINE/ENG2/FIRE DET/LOOP A | 7WD2 | Q39 |
D. Get Access
(1) Make sure that these fan cowl doors are open (Ref. AMM TASK 71-13-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR
(2) Make sure that an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position.
Subtask 26-12-16-040-056-A ** ON A/C NOT FOR ALL (1) Make sure that these fan cowl doors are open (Ref. AMM TASK 71-13-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR
(2) Make sure that an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position.
E. Deactivation of the Thrust Reverser for Maintenance
Subtask 26-12-16-010-063-A ** ON A/C NOT FOR ALL WARNING:
YOU MUST DEACTIVATE THE THRUST REVERSER BEFORE YOU DO WORK ON OR AROUND IT. IF YOU DO NOT, THE THRUST REVERSER CAN OPERATE ACCIDENTALLY AND CAUSE AN INJURY AND/OR DAMAGE.
(1) Make sure that the thrust reverser system is deactivated for maintenance (Ref. AMM TASK 78-30-00-040-805). F. Get Access
(1) Make sure that the thrust reverser cowl-doors are open (Ref. AMM TASK 78-36-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL 462AR
Subtask 26-12-16-020-056-A ** ON A/C NOT FOR ALL (1) Make sure that the thrust reverser cowl-doors are open (Ref. AMM TASK 78-36-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL 462AR
G. Removal of the Components
(1) Make sure that the OPV is removed (Ref. AMM TASK 36-11-53-000-802).
(2) Make sure that the Environmental Control System (ECS) L-duct is removed (Ref. AMM TASK 36-11-49-000-824).
(3) If necessary, remove the turbine cooling air-system-pipe (Ref. AMM TASK 75-25-49-000-802).
4. Procedure(1) Make sure that the OPV is removed (Ref. AMM TASK 36-11-53-000-802).
(2) Make sure that the Environmental Control System (ECS) L-duct is removed (Ref. AMM TASK 36-11-49-000-824).
(3) If necessary, remove the turbine cooling air-system-pipe (Ref. AMM TASK 75-25-49-000-802).
Subtask 26-12-16-420-055-A ** ON A/C NOT FOR ALL
A. Installation of the Pylon Fire-Detector Ramp-Assembly
(2) Install the washers (2) and the screws (1) on the ramp assembly (4) and tighten then.
(3) Remove the CAP-BLANKING from each electrical connector and receptacle.
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Install the two electrical connectors (7).
(a) Put the two electrical connectors (7) in position on the two responders (5) and the two clamps (10).
(b) Install the two nuts (6) on the two responders (5).
1 TORQUE the two nuts (6) to between 0.28 and 0.23 m.daN (24.78 and 20.35 lbf.in )
.
(6) Install the two electrical connectors (9)
(a) Put the two electrical connectors (9) in position on the two responders (5) and the two clamps (10).
(b) Install the two nuts (8) on the two responders (5).
1 TORQUE the two nuts (8) to between 0.4 and 0.34 m.daN (35.40 and 30.09 lbf.in )
.
(7) Close the four clamps (10).
Subtask 26-12-16-865-060-A ** ON A/C NOT FOR ALL CAUTION:
DO NOT BEND THE MANIFOLD OF THE SENSING ELEMENT. IF YOU BEND IT, YOU CAN CAUSE DAMAGE TO THE WELDING.
(1) Carefully put the ramp assembly (4) in position on the structure (3). (2) Install the washers (2) and the screws (1) on the ramp assembly (4) and tighten then.
(3) Remove the CAP-BLANKING from each electrical connector and receptacle.
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Install the two electrical connectors (7).
(a) Put the two electrical connectors (7) in position on the two responders (5) and the two clamps (10).
(b) Install the two nuts (6) on the two responders (5).
1 TORQUE the two nuts (6) to between 0.28 and 0.23 m.daN (24.78 and 20.35 lbf.in )
. (6) Install the two electrical connectors (9)
(a) Put the two electrical connectors (9) in position on the two responders (5) and the two clamps (10).
(b) Install the two nuts (8) on the two responders (5).
1 TORQUE the two nuts (8) to between 0.4 and 0.34 m.daN (35.40 and 30.09 lbf.in )
. (7) Close the four clamps (10).
CAUTION:
DO NOT USE ELECTRICAL OR PNEUMATIC TOOLS TO LOOSEN OR TIGHTEN THE QUARTER-TURN FASTENER ON THE FIRE DETECTOR CLAMP. ONLY USE A MANUAL SCREWDRIVER. ELECTRICAL OR PNEUMATIC TOOLS WILL CAUSE THE FASTENER TO TURN TOO MUCH AND POSSIBLY TO BREAK.
(a) Close the clamps (10) and lock them with the quarter-turn fasteners (11). B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 26-12-16-860-060-A ** ON A/C NOT FOR ALL Subtask 26-12-16-710-053-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 4020KM1 (POWER PLANTDEMOUNTABLE, ENG 1) | |||
| 49VU | ENGINE/1/FIRE DET/LOOP A | 7WD1 | A06 |
| 121VU | ENGINE/ENG1/FIRE DET/LOOP B | 8WD1 | Q38 |
| FOR FIN: 4020KM2 (POWER PLANTDEMOUNTABLE, ENG 2) | |||
| 49VU | ENGINE/2/FIRE DET/LOOP B | 8WD2 | A07 |
| 121VU | ENGINE/ENG2/FIRE DET/LOOP A | 7WD2 | Q39 |
D. Do this test.
(1) On the upper ECAM DU, make sure that the FIRE ENG1(2) LOOP A (B) FAULT message is out of view.
(2) Do an operational test of the engine-fire detection system (Ref. AMM TASK 26-12-00-710-001).
Subtask 26-12-16-860-061-A ** ON A/C NOT FOR ALL 5. Close-up(1) On the upper ECAM DU, make sure that the FIRE ENG1(2) LOOP A (B) FAULT message is out of view.
(2) Do an operational test of the engine-fire detection system (Ref. AMM TASK 26-12-00-710-001).
Subtask 26-12-16-420-056-A ** ON A/C NOT FOR ALL
A. Installation of the Components
(1) Install the ECS L-duct (Ref. AMM TASK 36-11-49-400-824).
(2) Install the OPV (Ref. AMM TASK 36-11-53-400-802).
(3) If removed, install the turbine cooling air-system-pipe (Ref. AMM TASK 75-25-49-400-802).
Subtask 26-12-16-410-059-A ** ON A/C NOT FOR ALL (1) Install the ECS L-duct (Ref. AMM TASK 36-11-49-400-824).
(2) Install the OPV (Ref. AMM TASK 36-11-53-400-802).
(3) If removed, install the turbine cooling air-system-pipe (Ref. AMM TASK 75-25-49-400-802).
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser cowl-doors (Ref. AMM TASK 78-36-00-410-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL 462AR
Subtask 26-12-16-440-053-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser cowl-doors (Ref. AMM TASK 78-36-00-410-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL 462AR
C. Do the reactivation of the thrust reverser system after maintenance (Ref. AMM TASK 78-30-00-440-805).
Subtask 26-12-16-410-060-A ** ON A/C NOT FOR ALL D. Close Access
(1) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR
(2) Remove the access platform(s).
(3) Remove the WARNING NOTICE(S).
Subtask 26-12-16-862-051-A ** ON A/C NOT FOR ALL (1) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR
(2) Remove the access platform(s).
(3) Remove the WARNING NOTICE(S).
Pylon Fire-Detectors Ramp-Assembly