Installation of the De-Oil Solenoid (131-9(A))


TASK 49-91-49-400-003-A
Installation of the De-Oil Solenoid (131-9(A))


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 6.21 and 5.65 m.N (54.96 and 50.00 lbf.in ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.03ABA1)
Synthetic base Lubricating Oil-Turbine Engine - -
(Material No.03ABB1)
Synthetic base Lubricating Oil-Turbine Engine Low Temp. -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
315AL, 316AR
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
3
O-RING
AIPC 49-91-45-70-120
2
O-RING
AIPC 49-91-45-70-130
3
O-RING
AIPC 49-91-84-32-120
2
O-RING
AIPC 49-91-84-32-130
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 49-00-00-710-009-A
Self-Test of the ECB
TASK 49-00-00-860-008-A
APU Start by External Power
TASK 49-00-00-860-008-A-01
APU Start by Batteries
TASK 49-00-00-860-009-A
APU Shutdown by External Power (131-9(A))
TASK 49-00-00-860-009-A-01
APU Shutdown by Batteries (131-9(A))
TASK 49-90-00-600-007-A
Check Oil Level and Replenish (131-9(A))
TASK 52-41-00-010-001-A
Open the APU Doors for Access
TASK 52-41-00-410-001-A
Close the APU Doors after Access
3. Job Set-up
Subtask 49-91-49-860-056-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
   (2) On overhead panel 25VU, make sure that the APU MASTER SW pushbutton switch is released (the ON legend is OFF).
   (3) Make sure that the WARNING NOTICE(S) is (are) in position in the cockpit to tell persons not to start the APU.
   (4) Make sure that the hydraulic systems are depressurized
(Ref. AMM TASK 29-00-00-864-001).
   (5) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in position below the APU compartment.
   (6) Make sure that APU access doors 315AL and 316AR are open (Ref. AMM TASK 52-41-00-010-001).
   (7) Make sure that the light switch 11LJ is in the ON position.
Subtask 49-91-49-865-059-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
4. Procedure
Subtask 49-91-49-420-053-A ** ON A/C NOT FOR ALL Subtask 49-91-49-210-051-A ** ON A/C NOT FOR ALL Subtask 49-91-49-865-062-A ** ON A/C NOT FOR ALL
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
Subtask 49-91-49-740-051-A ** ON A/C NOT FOR ALL
D. Do the BITE test of the De-Oiling Solenoid Valve via the ECB-Self Test (Ref. AMM TASK 49-00-00-710-009).
Subtask 49-91-49-710-053-A ** ON A/C NOT FOR ALL
E. Start and Operate the APU.
   (1) Close the APU access doors (Ref. AMM TASK 52-41-00-410-001).
   (2) Start the APU (Ref. AMM TASK 49-00-00-860-008).
   (3) Let the APU run for 5 minutes.
   (4) Shut down the APU (Ref. AMM TASK 49-00-00-860-009).
   (5) Open the APU access doors 315AL and 316AR (Ref. AMM TASK 52-41-00-010-001).
   (6) Do a leak check of the De-Oil Solenoid.
NOTE: No leaks are permitted.
5. Close-up
Subtask 49-91-49-410-053-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close APU access doors 315AL and 316AR (Ref. AMM TASK 52-41-00-410-001).
   (3) Set the light switch 11LJ to the OFF position.
   (4) Remove the access platform(s).
Subtask 49-91-49-860-057-A ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) Remove the WARNING NOTICE(S).
   (2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
   (3) Put the related hydraulic system in the pressurized configuration (Ref. AMM TASK 29-00-00-864-001).
   (4) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).