Installation of the Load Compressor-Discharge Temperature-Sensor (APS 3200)
TASK 49-23-16-400-002-A
Installation of the Load Compressor-Discharge Temperature-Sensor (APS 3200)
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 49-23-16-860-053-A ** ON A/C NOT FOR ALL
Subtask 49-23-16-420-051-A ** ON A/C NOT FOR ALL
Subtask 49-23-16-410-052-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:29:04 UTC
Installation of the Load Compressor-Discharge Temperature-Sensor (APS 3200)
WARNING:
DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | Torque wrench: range to between 44 and 36 lbf.in (0.50 and 0.41 m.daN ) ![]() |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.03FAB1) | Mineral Oil base Grease-- Vaseline or Petrolatum - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 315AL, 316AR |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 1 | PACKING | AIPC 49-23-04-50-020 |
| 1 | PACKING | AIPC 49-23-84-20-020 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 49-00-00-710-005-A | Self-Test of the ECB |
| TASK 52-41-00-010-001-A | Open the APU Doors for Access |
| TASK 52-41-00-410-001-A | Close the APU Doors after Access |
Subtask 49-23-16-860-053-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) On the panel 25VU, make sure that the APU MASTER SW pushbutton switch is off.
(3) Make sure that there is a warning notice in the cockpit to tell persons not to start the APU.
(4) Make sure that the hydraulic systems are depressurized
(Ref. AMM TASK 29-00-00-864-001).
(5) Make sure that the access platform is in position below the APU compartment.
(6) Make sure that the APU access doors are open (Ref. AMM TASK 52-41-00-010-001).
(7) Make sure that the LIGHT control switch 11LJ is set to the on position.
Subtask 49-23-16-865-055-A ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) On the panel 25VU, make sure that the APU MASTER SW pushbutton switch is off.
(3) Make sure that there is a warning notice in the cockpit to tell persons not to start the APU.
(4) Make sure that the hydraulic systems are depressurized
(Ref. AMM TASK 29-00-00-864-001).
(5) Make sure that the access platform is in position below the APU compartment.
(6) Make sure that the APU access doors are open (Ref. AMM TASK 52-41-00-010-001).
(7) Make sure that the LIGHT control switch 11LJ is set to the on position.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | APU/APU/CTL | 2KD | L42 |
| 121VU | APU/ECB/SPLY | 1KD | L41 |
Subtask 49-23-16-420-051-A ** ON A/C NOT FOR ALL
A. Installation of the Sensor
(1) Apply Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) to the new AIPC 49-23-04-50-020 PACKING (1) or AIPC 49-23-84-20-020 PACKING (1).
(2) Install the new seal (1) on the sensor (2).
(3) Put the sensor (2) in position on the APU compressor discharge duct.
(4) Install the sensor (2) with one of the bolts (4).
(5) Install the bonding lead (5) with the remaining bolt (4) (Ref. AMM TASK 20-28-00-912-802).
(6) TORQUE the bolts (4) to between 44 and 36 lbf.in (0.50 and 0.41 m.daN )
.
(7) Remove the CAP-BLANKING from each electrical connector and receptacle.
(8) Make sure that all the electrical connections are clean and in the correct condition.
(9) Connect the electrical connector P29 (3) to the sensor (2).
Subtask 49-23-16-865-056-A ** ON A/C NOT FOR ALL (1) Apply Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) to the new AIPC 49-23-04-50-020 PACKING (1) or AIPC 49-23-84-20-020 PACKING (1).
(2) Install the new seal (1) on the sensor (2).
(3) Put the sensor (2) in position on the APU compressor discharge duct.
(4) Install the sensor (2) with one of the bolts (4).
(5) Install the bonding lead (5) with the remaining bolt (4) (Ref. AMM TASK 20-28-00-912-802).
(6) TORQUE the bolts (4) to between 44 and 36 lbf.in (0.50 and 0.41 m.daN )
. (7) Remove the CAP-BLANKING from each electrical connector and receptacle.
(8) Make sure that all the electrical connections are clean and in the correct condition.
(9) Connect the electrical connector P29 (3) to the sensor (2).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 49-23-16-740-051-A ** ON A/C NOT FOR ALL 5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | APU/APU/CTL | 2KD | L42 |
| 121VU | APU/ECB/SPLY | 1KD | L41 |
Subtask 49-23-16-410-052-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Set the LIGHT control switch 11LJ to the off position.
(3) Close the APU access doors 315AL 316AR (Ref. AMM TASK 52-41-00-410-001).
(4) Remove the access platform(s).
(5) Remove the WARNING NOTICE(S).
Subtask 49-23-16-860-051-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Set the LIGHT control switch 11LJ to the off position.
(3) Close the APU access doors 315AL 316AR (Ref. AMM TASK 52-41-00-410-001).
(4) Remove the access platform(s).
(5) Remove the WARNING NOTICE(S).
B. Aircraft Maintenance Configuration
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).