APU Compressor Cleaning (APS3200)
TASK 49-20-00-100-807-A
APU Compressor Cleaning (APS3200)
High EGT as a result of compressor contamination.
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 49-20-00-860-116-A ** ON A/C NOT FOR ALL
Subtask 49-20-00-860-117-A ** ON A/C NOT FOR ALL
1KD.. APU/ECB/SPLY .... 41L;
2KD.. APU/APU/CTL ..... 42L.
(2) On the overhead panel 25VU:
(5) Wait 15 minutes to allow cleaning fluid solution to soak.
(6) Do steps 1 thru 4 again.
(7) Flush the engine with WATER - DEIONIZED, if not available use WATER - DISTILLED.
(8) Wait 5 minutes and flush engine again with deionized water, if not available use clean clear water.
Subtask 49-20-00-860-118-A ** ON A/C NOT FOR ALL
Subtask 49-20-00-410-084-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:28:43 UTC
APU Compressor Cleaning (APS3200)
WARNING:
WAIT A MINIMUM OF 1 HOUR AFTER THE APU SHUTDOWN TO LET THE INTERNAL TEMPERATURE DECREASE TO BETWEEN 55 AND 60 DEG. THERE IS A RISK OF BURNS IF YOU APPLY CLEANING FLUID WHEN THE APU IS TOO HOT.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobHigh EGT as a result of compressor contamination.
NOTE: This procedure will not correct all APU problems. You must do the correct trouble-shooting procedures before the compressor is cleaned.
Complete these tasks after contamination of the engine with:
2. Job Set-up InformationComplete these tasks after contamination of the engine with:
- fuel,
- corrosive materials.
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| No specific | AR | CAP - BLANKING |
| No specific | AR | CONTAINER 1 L (1/4 USGAL) |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | AR | WATER - DEIONIZED |
| No specific | AR | WATER - DISTILLED |
| No specific | Torque wrench: range to between 0.495 and 0.405 m.daN (43.81 and 35.84 lbf.in ) ![]() | |
| No specific | Torque wrench: range to between 1.13 and 1.02 m.daN (100.00 and 90.27 lbf.in ) ![]() | |
| 98A28007570000 | 1 | ADAPTER - VENT AND DRAIN VALVE, APU |
| 98A49007625001 | 1 | DEVICE - CLEANING, APU |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.03ABA1) | Synthetic base Lubricating Oil-Turbine Engine - - |
| (Material No.03ABB1) | Synthetic base Lubricating Oil-Turbine Engine Low Temp. - |
| (Material No.03FAB1) | Mineral Oil base Grease-- Vaseline or Petrolatum - |
| (Material No.08AJA1) | Aqueous Cleaner-Turbine Engine Gas Path - - |
| (Material No.08AJA9) | Aqueous Cleaner-Turbine Engine Gas Path - Legacy |
| (Material No.08BBD1) | Non Aqueous Cleaner-- Isopropyl Alcohol - |
| (Material No.14QFC1) | Wire-Locking Dia: 0.8 mm CRES - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 315AL, 316AR |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 20 | O-RING | AIPC 49-21-04-53-030 |
| 22 | O-RING | AIPC 49-21-04-54-030 |
| 20 | O-RING | AIPC 49-21-84-20-470 |
| 22 | O-RING | AIPC 49-21-84-20-470 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 23-44-00-700-001-A | Operational Test of the Service Interphone |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 49-00-00-710-008-A | Operational Test of the APU |
| TASK 52-41-00-010-001-A | Open the APU Doors for Access |
| TASK 52-41-00-410-001-A | Close the APU Doors after Access |
Subtask 49-20-00-860-116-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration.
(1) Make sure that the hydraulic systems are depressurized (Ref. AMM TASK 29-14-00-614-001).
(2) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(3) Make sure that the electronic racks are correctly ventilated.
(4) Connect the service interphone to the aircraft (Ref. AMM TASK 23-44-00-700-001).
Subtask 49-20-00-865-115-A ** ON A/C NOT FOR ALL (1) Make sure that the hydraulic systems are depressurized (Ref. AMM TASK 29-14-00-614-001).
(2) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(3) Make sure that the electronic racks are correctly ventilated.
(4) Connect the service interphone to the aircraft (Ref. AMM TASK 23-44-00-700-001).
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 49-20-00-010-083-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | APU/FUEL/BLOW OFF/PUMP | 2QC | B14 |
| 121VU | APU/FUEL/BLOW OFF/CTL | 1QC | K39 |
| 121VU | APU/FUEL/LP VALVE/CTL | 1QF | M40 |
| 121VU | APU/FUEL/LP VALVE/SPLY | 2QF | M39 |
| 121VU | APU/FUEL/PUMP/CTL | 3QC | M38 |
C. Get Access
(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE below the APU access doors 316AR and 315AL.
(2) Open the APU access doors 315AL 316AR (Ref. AMM TASK 52-41-00-010-001).
(3) Set the LIGHT control switch 11LJ to the ON position.
4. Procedure(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE below the APU access doors 316AR and 315AL.
(2) Open the APU access doors 315AL 316AR (Ref. AMM TASK 52-41-00-010-001).
(3) Set the LIGHT control switch 11LJ to the ON position.
Subtask 49-20-00-860-117-A ** ON A/C NOT FOR ALL
A. APU System Maintenance Configuration
(1) Disconnect the electrical connector P19 from the Fuel Control Unit.
(2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(3) Drain and disconnect the Fuel Inlet Line
(b) Remove the blanking cap (13) from the LP fuel inlet vent and drain valve (12).
(c) Install the 98A28007570000 ADAPTER - VENT AND DRAIN VALVE, APU to the vent and drain valve (12).
(d) Drain the unwanted fuel into the container.
(e) Remove the 98A28007570000 ADAPTER - VENT AND DRAIN VALVE, APU from the vent and drain valve.
(f) Install the blanking cap (13).
(g) Remove and discard the lockwire and disconnect the fuel inlet line (14) from the vent and drain valve (12).
(h) Put the PLUG-BLANKING in each disconnected line end.
(i) Put the main fuel inlet-pipe in the stowage bracket attached to the firewall of the APU compartment.
(j) Remove the container below the vent and drain valve (12).
(4) Move the IGV Actuator Rod at the IGV position indicator from the closed end to the open end, to provide maximum access to load compressor for the cleaning mixture.
(5) Disconnect the Power Compressor Discharge (PCD) lines as follows:
(a) Remove the tube assembly (Pneu - Sensor PCD) (17) (Ref. AIPC 49-21-04-53-120).
(b) Disconnect the tube assembly (Pneu - Duct to Sensor PCD) (23) (Ref. AIPC 49-21-04-54-170) from the Bleed Control Valve (BCV) port.
(c) Put the PLUG-BLANKING in each disconnected line end.
(d) Disconnect the tube assembly (Pneu - PCD to Gearbox) (18) (Ref. AIPC 49-21-04-53-010), from the combustor side.
(e) Put the PLUG-BLANKING in each disconnected line end.
(6) Disconnect the electrical connector P10 (16) from the Ignition Unit (15).
(7) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(8) Install the 98A49007625001 DEVICE - CLEANING, APU:
(a) Install the mounting plate (1) on the APU rear lower mount boss with the knurled screw (2).
(b) Attach the tube support assembly (10) to the mount plate (1) with the knurled screws (3).
(c) Clamp the sprayer unit (11) to the support assembly (10) with the clamp plate (9), the screws (4), the washers (5) and (6) and the nuts (7).
(d) Position the sprayer unit nozzles in the APU air intake as required.
(9) Prepare the cleaning mixture:
(a) In the cleaning device container, prepare a mixture as follows:
Use Non Aqueous Cleaner-- Isopropyl Alcohol - (Material No.08BBD1) with Aqueous Cleaner-Turbine Engine Gas Path - Legacy (Material No.08AJA9) or Aqueous Cleaner-Turbine Engine Gas Path - - (Material No.08AJA1)
(b) Close the container and pressurize with compressed air as needed.
Subtask 49-20-00-160-052-A ** ON A/C NOT FOR ALL (1) Disconnect the electrical connector P19 from the Fuel Control Unit.
(2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(3) Drain and disconnect the Fuel Inlet Line
WARNING:
OBEY THE FUEL SAFETY PROCEDURES.
CAUTION:
PUT PLASTIC CAPS OR PLUGS ON ALL FUEL AND/OR LUBRICATION SYSTEM COMPONENTS AND LINES. IF YOU USE TAPE, CLOTH, OR METAL CAPS ON THEM, YOU CAN DAMAGE THE APU.
CAUTION:
YOU MUST USE TWO WRENCHES AND HOLD THE COMPONENT WHEN YOU REMOVE/INSTALL THE PIPE COUPLINGS AND/OR UNIONS. THIS PREVENTS DAMAGE TO THE COMPONENT.
(a) Put the CONTAINER 1 L (1/4 USGAL) in position below the fuel control unit and the vent and drain valve (12). (b) Remove the blanking cap (13) from the LP fuel inlet vent and drain valve (12).
(c) Install the 98A28007570000 ADAPTER - VENT AND DRAIN VALVE, APU to the vent and drain valve (12).
(d) Drain the unwanted fuel into the container.
(e) Remove the 98A28007570000 ADAPTER - VENT AND DRAIN VALVE, APU from the vent and drain valve.
(f) Install the blanking cap (13).
(g) Remove and discard the lockwire and disconnect the fuel inlet line (14) from the vent and drain valve (12).
(h) Put the PLUG-BLANKING in each disconnected line end.
(i) Put the main fuel inlet-pipe in the stowage bracket attached to the firewall of the APU compartment.
(j) Remove the container below the vent and drain valve (12).
(4) Move the IGV Actuator Rod at the IGV position indicator from the closed end to the open end, to provide maximum access to load compressor for the cleaning mixture.
(5) Disconnect the Power Compressor Discharge (PCD) lines as follows:
(a) Remove the tube assembly (Pneu - Sensor PCD) (17) (Ref. AIPC 49-21-04-53-120).
(b) Disconnect the tube assembly (Pneu - Duct to Sensor PCD) (23) (Ref. AIPC 49-21-04-54-170) from the Bleed Control Valve (BCV) port.
(c) Put the PLUG-BLANKING in each disconnected line end.
(d) Disconnect the tube assembly (Pneu - PCD to Gearbox) (18) (Ref. AIPC 49-21-04-53-010), from the combustor side.
(e) Put the PLUG-BLANKING in each disconnected line end.
(6) Disconnect the electrical connector P10 (16) from the Ignition Unit (15).
(7) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(8) Install the 98A49007625001 DEVICE - CLEANING, APU:
(a) Install the mounting plate (1) on the APU rear lower mount boss with the knurled screw (2).
(b) Attach the tube support assembly (10) to the mount plate (1) with the knurled screws (3).
(c) Clamp the sprayer unit (11) to the support assembly (10) with the clamp plate (9), the screws (4), the washers (5) and (6) and the nuts (7).
(d) Position the sprayer unit nozzles in the APU air intake as required.
(9) Prepare the cleaning mixture:
(a) In the cleaning device container, prepare a mixture as follows:
Use Non Aqueous Cleaner-- Isopropyl Alcohol - (Material No.08BBD1) with Aqueous Cleaner-Turbine Engine Gas Path - Legacy (Material No.08AJA9) or Aqueous Cleaner-Turbine Engine Gas Path - - (Material No.08AJA1)
| AMBIENT TEMPERATURE | CLEANING PRODUCT | WATER | ISOPROPYL ALCOHOL |
|---|---|---|---|
| over +5 deg C. (+41 deg F). | 20% | 80% | 0% |
| -8 to +5 deg C. (+18 to +41 deg F). | 16% | 66% | 18% |
| -24 to -8 deg C. (-11 to +18 deg F). | 13% | 54% | 33% |
CAUTION:
MAKE SURE THAT YOU HAVE THE CORRECT FIRE FIGHTING EQUIPMENT AVAILABLE.
THE APU FIRE EXTINGUISHING SYSTEM IS NOT SUFFICIENT TO EXTINGUISH A FIRE IF THE ACCESS DOORS 315AL AND 316AR ARE OPEN/ REMOVED.
KEEP OPERATION OF THE APU TO A MINIMUM WHEN THE ACCESS DOORS ARE OPEN/REMOVED.
B. Compressor wash NOTE: APU run with open doors
(1) On the C/B panel 121VU, make sure that these C/Bs are closed: - make sure that the access platform can not move.
- make sure that the fire fighting equipment and the necessary persons to monitor the start and operation of the APU are available.
- make sure that no persons or loose equipment are in the danger areas.
1KD.. APU/ECB/SPLY .... 41L;
2KD.. APU/APU/CTL ..... 42L.
(2) On the overhead panel 25VU:
- push the APU MASTER SW p/bsw,
- push the APU START SW p/bsw to on.
NOTE: The recommended spray nozzle pressure is 2.8 bar (40.6106 psi) to 4.1 bar (59.4655 psi) at the recommended flow rate.
NOTE: The APU will crank to approx 15% speed and then decelerate to 0% speed.
(4) Stop to apply the cleaning fluid solution at 0% speed. (5) Wait 15 minutes to allow cleaning fluid solution to soak.
(6) Do steps 1 thru 4 again.
(7) Flush the engine with WATER - DEIONIZED, if not available use WATER - DISTILLED.
(8) Wait 5 minutes and flush engine again with deionized water, if not available use clean clear water.
C. Put the system back to the serviceable condition.
(1) Remove the cleaning device:
(a) Disconnect and remove the sprayer (11) from the support assembly (10).
(b) Remove the knurled screws (3) and remove the cleaning device.
(c) Remove the knurled screw (2) and the mount plate (1) from the APU rear lower mount boss.
(2) Remove any blanking plugs from the disconnect line ends.
(3) Connect the electrical connector P10 (16) to the ignition exciter (15).
(4) Apply a thin layer of Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) on the new AIPC 49-21-04-53-030 O-RING (20) or AIPC 49-21-84-20-470 O-RING (20).
(5) Install the new o-ring (20) at the tube assembly (18).
(6) Apply a thin layer of Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) on the screws (19).
(7) Install the tube assembly (18) at the combustors side.
(8) TORQUE the screws (19) with to between 0.495 and 0.405 m.daN (43.81 and 35.84 lbf.in )
.
(9) Apply a thin layer of Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) on the new AIPC 49-21-04-54-030 O-RING (22) or AIPC 49-21-84-20-470 O-RING (22).
(10) Install the new o-ring (22) at the tube assembly (23).
(11) Apply a thin layer of Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) on the screws (21).
(12) Install the tube assembly (23) at BCV port.
(13) TORQUE the screws (21) to between 0.495 and 0.405 m.daN (43.81 and 35.84 lbf.in )
.
(14) Install the tube assembly (17), and TORQUE to between 1.13 and 1.02 m.daN (100.00 and 90.27 lbf.in )
.
(15) Safety the fuel inlet line (14):
14QFC1 Wire-Locking Dia: 0.8 mm CRES - .
(16) Push the IGV Actuator Rod to close the IGV's.
(17) Reconnect the electrical connector P19 to the fuel control unit.
Subtask 49-20-00-710-070-A ** ON A/C NOT FOR ALL (1) Remove the cleaning device:
(a) Disconnect and remove the sprayer (11) from the support assembly (10).
(b) Remove the knurled screws (3) and remove the cleaning device.
(c) Remove the knurled screw (2) and the mount plate (1) from the APU rear lower mount boss.
(2) Remove any blanking plugs from the disconnect line ends.
(3) Connect the electrical connector P10 (16) to the ignition exciter (15).
(4) Apply a thin layer of Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) on the new AIPC 49-21-04-53-030 O-RING (20) or AIPC 49-21-84-20-470 O-RING (20).
(5) Install the new o-ring (20) at the tube assembly (18).
(6) Apply a thin layer of Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) on the screws (19).
(7) Install the tube assembly (18) at the combustors side.
(8) TORQUE the screws (19) with to between 0.495 and 0.405 m.daN (43.81 and 35.84 lbf.in )
. (9) Apply a thin layer of Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) on the new AIPC 49-21-04-54-030 O-RING (22) or AIPC 49-21-84-20-470 O-RING (22).
(10) Install the new o-ring (22) at the tube assembly (23).
(11) Apply a thin layer of Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) on the screws (21).
(12) Install the tube assembly (23) at BCV port.
(13) TORQUE the screws (21) to between 0.495 and 0.405 m.daN (43.81 and 35.84 lbf.in )
. (14) Install the tube assembly (17), and TORQUE to between 1.13 and 1.02 m.daN (100.00 and 90.27 lbf.in )
. (15) Safety the fuel inlet line (14):
WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(a) Reconnect the fuel inlet line (14), and safety it with (16) Push the IGV Actuator Rod to close the IGV's.
(17) Reconnect the electrical connector P19 to the fuel control unit.
D. Operational Test
(1) Do the operational test of the APU (Ref. AMM TASK 49-00-00-710-008), and run the APU for 5 minutes to make sure the APU is dry.
5. Close-up(1) Do the operational test of the APU (Ref. AMM TASK 49-00-00-710-008), and run the APU for 5 minutes to make sure the APU is dry.
NOTE: During the wash procedure the following FAULT MESSAGES will be stored in ECB BITE Memory:
- FUEL CTL UNIT P19
- IGNITION UNIT P10
- NO FLAME APU AUTO SHUTDOWN
Subtask 49-20-00-410-084-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Disconnect and remove the service interphone.
(4) Close the APU access doors 315AL, 316AR (Ref. AMM TASK 52-41-00-410-001).
(5) Remove the access platform(s).
Subtask 49-20-00-860-119-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Disconnect and remove the service interphone.
NOTE: During the wash procedure the following FAULT MESSAGES will be stored in ECB BITE Memory:
(3) Set the LIGHT control switch 11LJ to the OFF position. - FUEL CTL UNIT P19
- IGNITION UNIT P10
- NO FLAME APU AUTO SHUTDOWN
(4) Close the APU access doors 315AL, 316AR (Ref. AMM TASK 52-41-00-410-001).
(5) Remove the access platform(s).
B. Aircraft Maintenance Configuration
(1) Put the related hydraulic system in the pressurized configuration (Ref. AMM TASK 29-00-00-864-001).
(2) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(1) Put the related hydraulic system in the pressurized configuration (Ref. AMM TASK 29-00-00-864-001).
(2) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
Cleaning Device - Installation