Removal of the APU Substitution Kit (APS 3200)
TASK 49-11-00-000-003-A
Removal of the APU Substitution Kit (APS 3200)
1. Reason for the Job
Removal of the APU Substitution Kit
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 49-11-00-860-061-A ** ON A/C NOT FOR ALL
Subtask 49-11-00-020-054-A ** ON A/C NOT FOR ALL
Subtask 49-11-00-410-057-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:26:38 UTC
Removal of the APU Substitution Kit (APS 3200)
1. Reason for the Job
Removal of the APU Substitution Kit
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| No specific | AR | COVER - PROTECTION |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | AR | THREAD PROTECTION |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 315AL, 316AR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 49-11-11-400-003-A | Installation of the Power Plant (APU) (APS 3200) |
| TASK 52-41-00-010-001-A | Open the APU Doors for Access |
| TASK 52-41-00-410-001-A | Close the APU Doors after Access |
| TASK 52-41-18-000-001-A | Removal of the APU Exhaust Access-Fairing |
| TASK 52-41-18-400-001-A | Installation of the APU Exhaust Access-Fairing |
Subtask 49-11-00-860-061-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) On the panel 25VU make sure that the APU MASTER SW pushbutton switch is off.
(3) Make sure that the hydraulic systems are depressurized
(Ref. AMM TASK 29-00-00-864-001).
(4) Put a warning notice in the cockpit to tell persons not to start the APU.
Subtask 49-11-00-010-057-A ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) On the panel 25VU make sure that the APU MASTER SW pushbutton switch is off.
(3) Make sure that the hydraulic systems are depressurized
(Ref. AMM TASK 29-00-00-864-001).
(4) Put a warning notice in the cockpit to tell persons not to start the APU.
B. Get Access
(1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below APU access doors 315AL and 316AR.
(2) Open APU access doors 315AL and 316AR (Ref. AMM TASK 52-41-00-010-001).
(3) Remove the APU exhaust access-fairing (Ref. AMM TASK 52-41-18-000-001).
(4) Set LIGHT control switch 11LJ to the ON position.
Subtask 49-11-00-865-059-A ** ON A/C NOT FOR ALL (1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below APU access doors 315AL and 316AR.
(2) Open APU access doors 315AL and 316AR (Ref. AMM TASK 52-41-00-010-001).
(3) Remove the APU exhaust access-fairing (Ref. AMM TASK 52-41-18-000-001).
(4) Set LIGHT control switch 11LJ to the ON position.
C. Open, safety and tag this(these) circuit breaker(s):
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | APU/FIRE AND OVHT/DET/LOOP B | 2WG | L44 |
| 121VU | APU/FIRE AND OVHT/DET/LOOP A | 1WG | L43 |
| 121VU | APU/FIRE/EXTIG/SQUIB/B | 2WF | L39 |
| 121VU | APU/FIRE/EXTIG/SQUIB/A | 1WF | L38 |
Subtask 49-11-00-020-054-A ** ON A/C NOT FOR ALL
A. Removal of the APU Substitution Kit
(1) Remove the oil-cooler outlet-duct plug (31) on the door 315AL.
(2) Remove the bleed-air duct plug (35) from the bleed air duct (24).
(3) Install the COVER - PROTECTION to the bleed air duct (24).
(4) Remove the blanking plug (27) from the exhaust muffler drain (30).
(5) Remove the exhaust muffler plug (32) from the APU exhaust outlet (33).
(6) Remove the blanking plugs (38) on the APU access door 316AR drain interfaces.
(7) Support the rear suspension assembly (18) and remove the nut (17), the washers (16) and the bolt (14).
(8) Continue to support the rear suspension assembly (18) and remove the nut (13). Install the THREAD PROTECTION and remove the assembly (18).
(9) Remove the generator cables (7) from the cross member assembly (3) and attach temporarily to the bulkhead.
(10) Remove the starter cables (20) from the cross member assembly (3) and attach temporarily to the bulkhead.
(11) Support the cross member assembly (3) and remove the nuts (1) the washers (2) and fit the thread protectors.
(12) Remove the blanking plug (28) from the APU fuel feed pipe (29).
(13) Remove the blanking caps (19) from the connector sockets 7120VC, 7138VC and 7118VC.
(14) Remove the cross member assembly (3).
Subtask 49-11-00-420-053-A ** ON A/C NOT FOR ALL 5. Close-up(1) Remove the oil-cooler outlet-duct plug (31) on the door 315AL.
(2) Remove the bleed-air duct plug (35) from the bleed air duct (24).
(3) Install the COVER - PROTECTION to the bleed air duct (24).
(4) Remove the blanking plug (27) from the exhaust muffler drain (30).
(5) Remove the exhaust muffler plug (32) from the APU exhaust outlet (33).
(6) Remove the blanking plugs (38) on the APU access door 316AR drain interfaces.
(7) Support the rear suspension assembly (18) and remove the nut (17), the washers (16) and the bolt (14).
(8) Continue to support the rear suspension assembly (18) and remove the nut (13). Install the THREAD PROTECTION and remove the assembly (18).
(9) Remove the generator cables (7) from the cross member assembly (3) and attach temporarily to the bulkhead.
(10) Remove the starter cables (20) from the cross member assembly (3) and attach temporarily to the bulkhead.
(11) Support the cross member assembly (3) and remove the nuts (1) the washers (2) and fit the thread protectors.
(12) Remove the blanking plug (28) from the APU fuel feed pipe (29).
(13) Remove the blanking caps (19) from the connector sockets 7120VC, 7138VC and 7118VC.
(14) Remove the cross member assembly (3).
Subtask 49-11-00-410-057-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Set LIGHT control switch 11LJ to the OFF position.
(3) Close APU access doors 315AL and 316AR (Ref. AMM TASK 52-41-00-410-001).
(4) Install the APU exhaust access-fairing (Ref. AMM TASK 52-41-18-400-001).
(5) Remove the access platform(s).
Subtask 49-11-00-860-051-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Set LIGHT control switch 11LJ to the OFF position.
(3) Close APU access doors 315AL and 316AR (Ref. AMM TASK 52-41-00-410-001).
(4) Install the APU exhaust access-fairing (Ref. AMM TASK 52-41-18-400-001).
(5) Remove the access platform(s).
B. Aircraft Maintenance Configuration
(1) Put the related hydraulic system in the pressurized configuration (Ref. AMM TASK 29-00-00-864-001).
(2) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
(3) Remove the WARNING NOTICE(S).
(1) Put the related hydraulic system in the pressurized configuration (Ref. AMM TASK 29-00-00-864-001).
(2) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
(3) Remove the WARNING NOTICE(S).
Suspension and electrical Connections