Installation of the Toilet Flush Switch
TASK 38-31-19-400-001-A
Installation of the Toilet Flush Switch
Self explanatory
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 38-31-19-860-050-A
Subtask 38-31-19-420-050-A ** ON A/C NOT FOR ALL
Subtask 38-31-19-862-050-A
[Rev.10 from 2021]
2026.04.01 01:20:20 UTC
Installation of the Toilet Flush Switch
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 38-10-00-614-001-A | Pressurization of the Potable Water System from a Ground Air Supply |
| TASK 38-10-00-614-002-A | Depressurization of the Potable Water System |
| TASK 38-10-00-614-003-A | Pressurization of the Potable Water System with the Compressor |
Subtask 38-31-19-860-050-A
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
Subtask 38-31-19-865-054-A (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-E | 34MG | A04 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-D | 39MG | A03 |
| ** ON A/C ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-A | 32MG | A01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-G | 34MG | A04 |
| 2001VU | VACU TOIL SYS-LAV PWR-F | 39MG | A03 |
| 2001VU | VACU TOIL SYS-LAV PWR-D | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 23MG | A05 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-M | 34MG | A04 |
Subtask 38-31-19-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Toilet Flush Switch
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Put the microswitch (13) in position on the bushes (6).
(4) Install the washers (7) and the screws (8).
(5) Adjust the microswitch if necessary.
(a) Move the microswitch so that the roller of the switch just touches the activation lever of the push plate assembly (3).
(b) Tighten the screws (8)
(c) Operate the push plate and make sure that the microswitch engages.
(6) Refer to the identification and put the electrical wires (9) and (12) in position.
(7) Install and tighten the screws (10) and (11).
(8) Put the plate assembly (3) in position.
(9) Install the washers (5) and the screws (4).
(10) Put the frame (2) in position and install the screws (1).
Subtask 38-31-19-420-050-B ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Put the microswitch (13) in position on the bushes (6).
(4) Install the washers (7) and the screws (8).
(5) Adjust the microswitch if necessary.
(a) Move the microswitch so that the roller of the switch just touches the activation lever of the push plate assembly (3).
(b) Tighten the screws (8)
(c) Operate the push plate and make sure that the microswitch engages.
(6) Refer to the identification and put the electrical wires (9) and (12) in position.
(7) Install and tighten the screws (10) and (11).
(8) Put the plate assembly (3) in position.
(9) Install the washers (5) and the screws (4).
(10) Put the frame (2) in position and install the screws (1).
A. Installation of the Toilet Flush Switch
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Put the housing (2) in position and install the screws (1).
(4) Remove the CAP-BLANKING from each electrical connector and receptacle.
(6) Put the front plate (4) in position and push it on the housing (2), make sure that it engages with a click.
Subtask 38-31-19-865-055-A (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Put the housing (2) in position and install the screws (1).
(4) Remove the CAP-BLANKING from each electrical connector and receptacle.
CAUTION:
MAKE SURE THAT THE ELECTRICAL CONNECTORS ARE CLEAN BEFORE YOU DISCONNECT OR CONNECT THEM. CONTAMINATION ON THE ELECTRICAL CONNECTORS CAN CAUSE DAMAGE TO EQUIPMENT.
(5) Refer to the identification and connect the electrical connectors (3). (6) Put the front plate (4) in position and push it on the housing (2), make sure that it engages with a click.
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 38-31-19-614-050-B | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-E | 34MG | A04 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-D | 39MG | A03 |
| ** ON A/C ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-A | 32MG | A01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-G | 34MG | A04 |
| 2001VU | VACU TOIL SYS-LAV PWR-F | 39MG | A03 |
| 2001VU | VACU TOIL SYS-LAV PWR-D | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 23MG | A05 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-M | 34MG | A04 |
C. Pressurize the potable water system (Ref. AMM TASK 38-10-00-614-001) (Ref. AMM TASK 38-10-00-614-003).
Subtask 38-31-19-710-050-A D. Test of the Toilet Flush Switch
Subtask 38-31-19-614-051-B 5. Close-up| ACTION | RESULT |
|---|---|
1.In the lavatory:
| In the lavatory:
|
Subtask 38-31-19-862-050-A
A. Put the aircraft back to its initial configuration.
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Toilet Flush Switch