Pressurization of the Potable Water System with the Compressor
TASK 38-10-00-614-003-A
Pressurization of the Potable Water System with the Compressor
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 38-10-00-861-054-A ** ON A/C NOT FOR ALL Subtask 38-10-00-010-056-A ** ON A/C NOT FOR ALL
Subtask 38-10-00-614-059-A ** ON A/C NOT FOR ALL
Subtask 38-10-00-862-053-A ** ON A/C NOT FOR ALL Subtask 38-10-00-410-062-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 04:23:09 UTC
Pressurization of the Potable Water System with the Compressor
FIN: 8MD ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 171AL |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-15-38-613-001-A | Fill the Potable Water Tank System (Aircraft Electrical Power Available) |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
Subtask 38-10-00-861-054-A ** ON A/C NOT FOR ALL Subtask 38-10-00-010-056-A ** ON A/C NOT FOR ALL
B. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) in position at Zone 171.
(2) Open the service door 171AL.
Subtask 38-10-00-865-055-A ** ON A/C NOT FOR ALL (1) Put the ACCESS PLATFORM 2M (6 FT) in position at Zone 171.
(2) Open the service door 171AL.
C. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 38-10-00-613-055-A ** ON A/C NOT FOR ALL 4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER-SYSTEM-DEPRESS | 1MD | F03 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER SYS-AIR-COMPRESSOR | 19MD | F01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER-SYSTEM-DEPRESS | 1MD | D05 |
Subtask 38-10-00-614-059-A ** ON A/C NOT FOR ALL
A. Pressurization of the Potable Water System
(1) Close the service door 171AL.
5. Close-up(1) Close the service door 171AL.
NOTE: The air pressure boost system automatically operates and pressurizes the potable water system when you close the service door 171AL.
Subtask 38-10-00-862-053-A ** ON A/C NOT FOR ALL Subtask 38-10-00-410-062-A ** ON A/C NOT FOR ALL
B. Close Access
(1) Remove the access platform(s).
(1) Remove the access platform(s).