Installation of the MLG Proximity-Sensors
TASK 32-31-73-400-001-A
Installation of the MLG Proximity-Sensors
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 32-31-73-941-056-A
Subtask 32-31-73-420-068-A
(a) Attach the bracket (3) to the applicable proximity sensor (4) with the capscrews (8), the washers (7) and the nuts (5).
(b) Install the shim (17), the bracket (3) and the proximity sensor (4) to the MLG uplock with the capscrews (1) and the washers (2).
(c) Make sure that the shim (17), the bracket (3) and the proximity sensor (4) are in the positions identified before removal.
(d) TORQUE the capscrews (8) and (1) to between 0.57 and 0.51 m.daN (50.44 and 45.13 lbf.in )
.
(e) Safety the capscrews (1) with14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
(f) Remove the CAP-BLANKING from each electrical connector and receptacle.
(g) Make sure that all the electrical connections are clean and in the correct condition.
(h) Connect the electrical connector (6) to the applicable proximity sensor (4).
(2) Install MLG door-uplock proximity-sensors 27GA (26GA) and 29GA (28GA) as follows:
(a) Attach the bracket (10) to the applicable proximity sensor (9) with the capscrews (13), the washers (14) and the nuts (16).
(b) Install the shim (18), the bracket (10) and the proximity sensor (9) to the door uplock with the capscrews (12) and the washers (11).
(c) Make sure that the shim (18), the bracket (10) and the proximity sensor (9) are in the positions identified before removal.
(d) TORQUE the capscrews (13) and (12) to between 0.57 and 0.51 m.daN (50.44 and 45.13 lbf.in )
.
(e) Safety the capscrews (12) with14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
(f) Remove the CAP-BLANKING from each electrical connector and receptacle.
(g) Make sure that all the electrical connections are clean and in the correct condition.
(h) Connect the electrical connector (15) to the applicable proximity sensor (9).
(3) Install MLG downlock proximity-sensors 15GA (14GA) as follows:
(a) Install the proximity sensor (37) on the lockstay with the capscrews (36).
(b) If you removed the target (31) during the removal procedure, do the steps that follow:
1 Put the spacer (32) if applicable, and the target (31) in position on the target mounting bracket.
2 Install the capscrews (30), the washers (35) and the nuts (34).
(c) Make sure that the target (31), the proximity sensor (37) and the spacer (32) if applicable, are in the positions identified before removal.
(d) TORQUE the capscrews (36) and if necessary, the capscrews (30) to between 0.192 and 0.124 m.daN (16.99 and 10.97 lbf.in )
.
(e) Safety the capscrews (36) with14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
(f) Remove the CAP-BLANKING from each electrical connector and receptacle.
(g) Make sure that all the electrical connections are clean and in the correct condition.
(h) Connect the electrical connector (29) to the applicable proximity sensor (37).
(4) Install MLG downlock proximity-sensors 17GA (16GA) as follows:
(a) Install the proximity sensor (55) on the sensor mounting bracket with the capscrews (59), the washers (56) and the nuts (57).
(b) If you removed the target (51) during the removal procedure, do the steps that follow:
1 Put the target spacer (52) if applicable, and the target (51) in position on the target mounting bracket.
2 Install the capscrews (50), the washers (53) and the nuts (54).
(c) Make sure that the proximity sensor (55), the target (51) and the spacer (52) if applicable, are in the positions identified before removal.
(d) TORQUE the nuts (57) and if necessary, the nuts (54) to between 0.45 and 0.4 m.daN (39.82 and 35.40 lbf.in )
.
(e) Remove the CAP-BLANKING from each electrical connector and receptacle.
(f) Make sure that all the electrical connections are clean and in the correct condition.
(g) Connect the electrical connector (60) to the applicable proximity sensor (55).
(5) Install MLG extension proximity-sensors 21GA (20GA) as follows:
(a) Install the spacer if applicable (72) and the proximity sensor (73) on the sensor mounting bracket with:
1 Put the spacer (79) if applicable, and the target (78) in position on the target mounting bracket.
2 Install the capscrews (77), the washers (80) and the nuts (81).
(c) Make sure that these items are in the positions identified before removal:
.
(e) Remove the CAP-BLANKING from each electrical connector and receptacle.
(f) Make sure that all the electrical connections are clean and in the correct condition.
(g) Connect the electrical connector (76) to the applicable proximity sensor (73).
(6) Install MLG extension proximity-sensors 23GA (22GA) as follows:
(a) Install the spacer (90) if applicable and the proximity sensor (99) on the sensor mounting bracket with:
1 The capscrews (91)
2 The washers (98)
3 The nuts (97).
(b) If you removed the target (92) during the removal procedure, do the steps that follow:
1 Put the spacer (94) if applicable, and the target (92) in position on the target mounting bracket.
2 Install the capscrews (93), the washers (95) and the nuts (96).
(c) Make sure that these items are in the positions identified before removal:
.
(e) Remove the CAP-BLANKING from each electrical connector and receptacle.
(f) Make sure that all the electrical connections are clean and in the correct condition.
(g) Connect the electrical connector (100) to the applicable proximity sensor (99).
(7) Install MLG door-open proximity-sensors 33GA (32GA) and 35GA (34GA) as follows:
(a) Put the spacer (115) if applicable, and the proximity sensor (114) in position on the sensor mounting bracket.
(b) Install the screws (113), the washers (104) and the nuts (103).
(c) If you removed the target (108) during the removal procedure, do the steps that follow:
1 Install the spacer (109) if applicable, and the target (108) in position on the target mounting bracket.
2 Install the screws (107), the washers (112) and the nuts (111).
(d) Make sure that the target (108), the proximity sensor (114) and the spacer (109) if applicable, are in the positions identified before removal.
(e) TORQUE the nuts (103) and if necessary, the nuts (111) to between 0.192 and 0.124 m.daN (16.99 and 10.97 lbf.in )
.
(f) Remove the CAP-BLANKING from each electrical connector and receptacle.
(g) Make sure that all the electrical connections are clean and in the correct condition.
(h) Connect the electrical connector (106) to the applicable proximity sensor (114).
(8) For MLG uplock proximity-sensors 9GA (8GA) and 11GA (10GA), apply Polysulfide Sealant-General Purpose Interfay Landing Gear (Material No.06AAC5) or Coating_- Flexible Structure (Material No.04QAB2) to:
Subtask 32-31-73-420-064-E ** ON A/C NOT FOR ALL
(a) Attach the bracket (3) to the applicable proximity sensor (4) with the washers (9), the cap screws (10) and the nuts (6).
(b) Put the shim (5), the bracket (3) and the applicable proximity sensor (4) in position on the MLG uplock.
(c) Install the washers (2) and the cap screws (1).
(d) Make sure that the items that follow are in the same position identified in the removal procedure:
.
(f) Safety the cap screws (1) with14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
(g) Remove the CAP-BLANKING from each electrical connector and receptacle.
(h) Make sure that all the electrical connections are clean and in the correct condition.
(i) For MLG uplock proximity-sensor 9GA (8GA):
1 Connect the electrical connector (7) to the proximity sensor (4).
(j) For MLG uplock proximity-sensor 11GA (10GA):
1 Connect the electrical connector (8) to the proximity sensor (4).
(2) Install MLG door-uplock proximity-sensors 27GA (26GA) and 29GA (28GA) as follows:
(a) Install the proximity sensor (11) as follows:
1 Put the proximity sensor (11) in position on the switch bracket (17).
2 Install the washers (16), the cap screws (15) and the nuts (23).
3 TORQUE the cap screws (15) to between 5.33 and 4.83 m.N (47.17 and 42.74 lbf.in )
.
4 Put the items that follow on the MLG door uplock in the same position identified in the removal procedure:
6 TORQUE the cap screws (14) to between 5.65 and 5.08 m.N (50.0 and 45.0 lbf.in )
.
(b) Install the proximity sensor (27) as follows:
1 Put the proximity sensor (27) in position on the switch bracket (34).
2 Install the washers (35), the cap screws (36) and the nuts (28).
3 TORQUE the cap screws (36) to between 5.33 and 4.83 m.N (47.17 and 42.74 lbf.in )
.
4 Put the items that follow on the MLG door uplock in the same position identified in the removal procedure:
6 TORQUE the cap screws (24) to between 5.65 and 5.08 m.N (50.0 and 45.0 lbf.in )
.
(c) Put the shim(s) (39) in position between the switch brackets (17) and (34).
(d) Install the cap screw (40), the washer (38) and the nut (37).
(e) TORQUE the nut (37) to between 5.33 and 4.83 m.N (47.17 and 42.74 lbf.in )
.
(f) Connect the electrical connector (20) to the proximity sensor (11) as follows:
1 Remove the CAP-BLANKING from each electrical connector and receptacle.
2 Make sure that the electrical connector (20) is clean and in the correct condition.
3 Before you connect the electrical connector (20) to the proximity sensor (11):
5 Remove tape from the surface of the switch bracket (17).
6 Put the clamp blocks (18) in position and install the cap screws (19), the washers (21) and the nuts (22). Do not tighten the nuts (22) at this step.
.
(g) Connect the electrical connector (32) to the proximity sensor (27) as follows:
1 Remove the CAP-BLANKING from each electrical connector and receptacle.
2 Make sure that the electrical connector (32) is clean and in the correct condition.
3 Before you connect the electrical connector (32) to the proximity sensor (27):
5 Remove the tape from the surface of the switch bracket (34).
6 Put the clamp blocks (31) in position and install the cap screws (33), the washers (30) and the nuts (29). Do not tighten the nuts (29) at this step.
.
(3) Install MLG downlock proximity-sensor 15GA (14GA) as follows:
(a) Install the proximity sensor (37) on the lock stay with the cap screws (36).
(b) If you removed the target (31) during the removal procedure, do the steps that follow:
1 Put the spacer (32) (if applicable) and the target (31) in position on the target mounting bracket.
2 Install the cap screws (30), the washers (35) and the nuts (34).
(c) Make sure that the items that follow are in the same position identified in the removal procedure:
.
(e) Safety the cap screws (36) with14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
(f) Remove the CAP-BLANKING from each electrical connector and receptacle.
(g) Make sure that all the electrical connections are clean and in the correct condition.
(h) Connect the electrical connector (29) to the applicable proximity sensor (37).
(4) Install MLG downlock proximity-sensor 17GA (16GA) as follows:
(a) Install the proximity sensor (55) on the sensor mounting bracket with the cap screws (59), the washers (56) and the nuts (57).
(b) If the target (51) is removed, do the steps that follow:
1 Put the target spacer (52) (if applicable) and the target (51) in position on the target mounting bracket.
2 Install the cap screws (50), the washers (53) and the nuts (54).
(c) Make sure that the items that follow are in the same position identified in the removal procedure:
.
(e) Remove the CAP-BLANKING from each electrical connector and receptacle.
(f) Make sure that all the electrical connections are clean and in the correct condition.
(g) Connect the electrical connector (60) to the applicable proximity sensor (55).
(5) Install MLG extension proximity-sensor 21GA (20GA) as follows:
(a) Put the spacer (72) (if applicable) and the proximity sensor (73) in position on the sensor mounting bracket.
(b) Install the cap screws (71), the washers (74) and the nuts (75).
(c) If you removed the target (78) during the removal procedure, do the steps that follow:
1 Put the spacer (79) (if applicable) and the target (78) in position on the target mounting bracket.
2 Install the cap screws (77), the washers (80) and the nuts (81).
(d) Make sure that the items that follow are in the same position identified in the removal procedure:
.
(f) Remove the CAP-BLANKING from each electrical connector and receptacle.
(g) Make sure that all the electrical connections are clean and in the correct condition.
(h) Connect the electrical connector (76) to the applicable proximity sensor (73).
(6) Install MLG extension proximity-sensor 23GA (22GA) as follows:
(a) Put the spacer (90) (if applicable) and the proximity sensor (99) in position on the sensor mounting bracket.
(b) Install the cap screws (91), the washers (98) and the nuts (97).
(c) If you removed the target (92) during the removal, do the steps that follow:
1 Put the spacer (94) (if applicable) and the target (92) in position on the target mounting bracket.
2 Install the cap screws (93), the washers (95) and the nuts (96).
(d) Make sure that the items that follow are in the same position identified in the removal procedure:
.
(f) Remove the CAP-BLANKING from each electrical connector and receptacle.
(g) Make sure that all the electrical connections are clean and in the correct condition.
(h) Connect the electrical connector (100) to the applicable proximity sensor (99).
(7) Install MLG door-open proximity-sensors 33GA (32GA) and 35GA (34GA) as follows:
(a) Put the spacer (115) (if applicable) and the proximity sensor (114) in position on the sensor mounting bracket.
(b) Install the screws (113), the washers (104) and the nuts (103).
(c) If you removed the target (108) during the removal, do the steps that follow:
1 Install the spacer (109) (if applicable) and the target (108) in position on the target mounting bracket.
2 Install the screws (107), the washers (112) and the nuts (111).
(d) Make sure that the items that follow are in the same position identified in the removal procedure:
.
(f) Remove the CAP-BLANKING from each electrical connector and receptacle.
(g) Make sure that all the electrical connections are clean and in the correct condition.
(h) Connect the electrical connector (106) to the applicable proximity sensor (114).
(8) For MLG uplock proximity-sensors 9GA (8GA) and 11GA (10GA), apply Polysulfide Sealant-General Purpose Interfay Landing Gear (Material No.06AAC5) or Coating_- Flexible Structure (Material No.04QAB2) to:
Subtask 32-31-73-865-060-A
Subtask 32-31-73-942-050-A
[Rev.10 from 2021]
2026.04.01 12:30:04 UTC
Installation of the MLG Proximity-Sensors
WARNING:
MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING NOTICES ARE IN POSITION.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 734
ZONE: 744
FIN: 10GA ** ON A/C NOT FOR ALL
FIN: 11GA ** ON A/C NOT FOR ALL
FIN: 14GA
FIN: 15GA
FIN: 16GA
FIN: 17GA ** ON A/C NOT FOR ALL
FIN: 20GA
FIN: 21GA
FIN: 22GA
FIN: 23GA
FIN: 26GA ** ON A/C NOT FOR ALL
FIN: 27GA ** ON A/C NOT FOR ALL
FIN: 28GA ** ON A/C NOT FOR ALL
FIN: 29GA ** ON A/C NOT FOR ALL
FIN: 32GA ** ON A/C NOT FOR ALL
FIN: 33GA ** ON A/C NOT FOR ALL
FIN: 34GA ** ON A/C NOT FOR ALL
FIN: 35GA ** ON A/C NOT FOR ALL
FIN: 8GA ** ON A/C NOT FOR ALL
FIN: 9GA ** ON A/C NOT FOR ALL
1. Reason for the JobZONE: 744
FIN: 10GA ** ON A/C NOT FOR ALL
FIN: 11GA ** ON A/C NOT FOR ALL
FIN: 14GA
FIN: 15GA
FIN: 16GA
FIN: 17GA ** ON A/C NOT FOR ALL
FIN: 20GA
FIN: 21GA
FIN: 22GA
FIN: 23GA
FIN: 26GA ** ON A/C NOT FOR ALL
FIN: 27GA ** ON A/C NOT FOR ALL
FIN: 28GA ** ON A/C NOT FOR ALL
FIN: 29GA ** ON A/C NOT FOR ALL
FIN: 32GA ** ON A/C NOT FOR ALL
FIN: 33GA ** ON A/C NOT FOR ALL
FIN: 34GA ** ON A/C NOT FOR ALL
FIN: 35GA ** ON A/C NOT FOR ALL
FIN: 8GA ** ON A/C NOT FOR ALL
FIN: 9GA ** ON A/C NOT FOR ALL
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.04QAB2) | Coating_- Flexible Structure |
| (Material No.06AAB1) | Polysulfide Sealant-General Purpose Fillet - |
| (Material No.06AAC5) | Polysulfide Sealant-General Purpose Interfay Landing Gear |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14QFB1) | Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 734 | MAIN DOOR |
| 744 | MAIN DOOR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 32-00-00-481-001-A | Installation of the Safety Devices on the Landing Gears |
| TASK 32-00-00-481-002-A | Installation of the Safety Devices on the Landing Gear Doors |
| TASK 32-00-00-860-001-A | Flight Configuration Precautions with Electrical Power |
| TASK 32-00-00-860-001-A-01 | Flight Configuration Precautions without Electrical Power |
| TASK 32-00-00-860-002-A | Ground Configuration after Flight Configuration with Electrical Power |
| TASK 32-00-00-860-002-A-01 | Ground Configuration after Flight Configuration without Electrical Power |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
| TASK 32-31-73-200-001-A | Inspection of the MLG Proximity Sensor and Target Clearances |
| TASK 32-69-00-740-001-A | BITE Check of Landing-Gear Control Interface-Unit (LGCIU) With Use of MCDU to Ensure that Continuous BITE is Operative |
Subtask 32-31-73-941-056-A
A. Safety Precautions
(1) Make sure that the SAFETY BARRIER(S) are in position.
(2) Make sure that the ground safety locks are on the landing gear (Ref. AMM TASK 32-00-00-481-001).
(3) On panel 400VU:
Subtask 32-31-73-860-056-A (1) Make sure that the SAFETY BARRIER(S) are in position.
(2) Make sure that the ground safety locks are on the landing gear (Ref. AMM TASK 32-00-00-481-001).
(3) On panel 400VU:
- Make sure that the landing-gear control-lever 6GA is in the DOWN position
- Make sure that the WARNING NOTICE(S) is in position to tell persons not to operate the landing gear.
B. Aircraft Maintenance Configuration
(1) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position below the applicable zone 734 or 744.
(2) Make sure that the applicable MLG door is open (Ref. AMM TASK 32-12-00-010-001).
(3) Make sure that the GROUND LOCK SLEEVE is on the applicable MLG door actuator (Ref. AMM TASK 32-00-00-481-002).
Subtask 32-31-73-869-060-A (1) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position below the applicable zone 734 or 744.
(2) Make sure that the applicable MLG door is open (Ref. AMM TASK 32-12-00-010-001).
(3) Make sure that the GROUND LOCK SLEEVE is on the applicable MLG door actuator (Ref. AMM TASK 32-00-00-481-002).
C. Flight Configuration Precautions
(1) If you did not de-energize the aircraft electrical circuits, make sure that the flight configuration precautions are done (Ref. AMM TASK 32-00-00-860-001).
Subtask 32-31-73-865-055-A (1) If you did not de-energize the aircraft electrical circuits, make sure that the flight configuration precautions are done (Ref. AMM TASK 32-00-00-860-001).
D. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | LGCIU/BAT SPLY/SYS2 | 59GA | R33 |
| 121VU | LGCIU/BAT SPLY/SYS1 | 58GA | R32 |
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | LGCIU/BAT SPLY/SYS2 | 59GA | R32 |
| 121VU | LGCIU/BAT SPLY/SYS1 | 58GA | R31 |
Subtask 32-31-73-420-068-A
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(2) Make sure that the parts retained from the removed component are clean and in the correct condition.
(3) Examine the mountings for the proximity-sensors on the MLG uplock and door uplock. Make sure that they are in the correct condition.
(4) Make sure that the applicable bonded shims/spacers are in the correct condition and are not loose.
Subtask 32-31-73-420-064-D ** ON A/C NOT FOR ALL (1) Clean the component interface and/or the adjacent area with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(2) Make sure that the parts retained from the removed component are clean and in the correct condition.
(3) Examine the mountings for the proximity-sensors on the MLG uplock and door uplock. Make sure that they are in the correct condition.
(4) Make sure that the applicable bonded shims/spacers are in the correct condition and are not loose.
WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
B. Installation of the Proximity Sensor NOTE: It is permitted to install a sensor target without a shim if the correct clearance can be set without the shim.
(1) Install MLG uplock proximity-sensors 9GA (8GA) and 11GA (10GA) as follows: (a) Attach the bracket (3) to the applicable proximity sensor (4) with the capscrews (8), the washers (7) and the nuts (5).
(b) Install the shim (17), the bracket (3) and the proximity sensor (4) to the MLG uplock with the capscrews (1) and the washers (2).
(c) Make sure that the shim (17), the bracket (3) and the proximity sensor (4) are in the positions identified before removal.
(d) TORQUE the capscrews (8) and (1) to between 0.57 and 0.51 m.daN (50.44 and 45.13 lbf.in )
. (e) Safety the capscrews (1) with
(f) Remove the CAP-BLANKING from each electrical connector and receptacle.
(g) Make sure that all the electrical connections are clean and in the correct condition.
(h) Connect the electrical connector (6) to the applicable proximity sensor (4).
(2) Install MLG door-uplock proximity-sensors 27GA (26GA) and 29GA (28GA) as follows:
(a) Attach the bracket (10) to the applicable proximity sensor (9) with the capscrews (13), the washers (14) and the nuts (16).
(b) Install the shim (18), the bracket (10) and the proximity sensor (9) to the door uplock with the capscrews (12) and the washers (11).
(c) Make sure that the shim (18), the bracket (10) and the proximity sensor (9) are in the positions identified before removal.
(d) TORQUE the capscrews (13) and (12) to between 0.57 and 0.51 m.daN (50.44 and 45.13 lbf.in )
. (e) Safety the capscrews (12) with
(f) Remove the CAP-BLANKING from each electrical connector and receptacle.
(g) Make sure that all the electrical connections are clean and in the correct condition.
(h) Connect the electrical connector (15) to the applicable proximity sensor (9).
(3) Install MLG downlock proximity-sensors 15GA (14GA) as follows:
(a) Install the proximity sensor (37) on the lockstay with the capscrews (36).
(b) If you removed the target (31) during the removal procedure, do the steps that follow:
1 Put the spacer (32) if applicable, and the target (31) in position on the target mounting bracket.
2 Install the capscrews (30), the washers (35) and the nuts (34).
(c) Make sure that the target (31), the proximity sensor (37) and the spacer (32) if applicable, are in the positions identified before removal.
(d) TORQUE the capscrews (36) and if necessary, the capscrews (30) to between 0.192 and 0.124 m.daN (16.99 and 10.97 lbf.in )
. (e) Safety the capscrews (36) with
(f) Remove the CAP-BLANKING from each electrical connector and receptacle.
(g) Make sure that all the electrical connections are clean and in the correct condition.
(h) Connect the electrical connector (29) to the applicable proximity sensor (37).
(4) Install MLG downlock proximity-sensors 17GA (16GA) as follows:
(a) Install the proximity sensor (55) on the sensor mounting bracket with the capscrews (59), the washers (56) and the nuts (57).
(b) If you removed the target (51) during the removal procedure, do the steps that follow:
1 Put the target spacer (52) if applicable, and the target (51) in position on the target mounting bracket.
2 Install the capscrews (50), the washers (53) and the nuts (54).
(c) Make sure that the proximity sensor (55), the target (51) and the spacer (52) if applicable, are in the positions identified before removal.
(d) TORQUE the nuts (57) and if necessary, the nuts (54) to between 0.45 and 0.4 m.daN (39.82 and 35.40 lbf.in )
. (e) Remove the CAP-BLANKING from each electrical connector and receptacle.
(f) Make sure that all the electrical connections are clean and in the correct condition.
(g) Connect the electrical connector (60) to the applicable proximity sensor (55).
(5) Install MLG extension proximity-sensors 21GA (20GA) as follows:
(a) Install the spacer if applicable (72) and the proximity sensor (73) on the sensor mounting bracket with:
- The capscrews (71)
- The washers (74)
- The nuts (75).
1 Put the spacer (79) if applicable, and the target (78) in position on the target mounting bracket.
2 Install the capscrews (77), the washers (80) and the nuts (81).
(c) Make sure that these items are in the positions identified before removal:
- The target (78)
- The proximity sensor (73)
- The spacers (79) and (72) if applicable.
. (e) Remove the CAP-BLANKING from each electrical connector and receptacle.
(f) Make sure that all the electrical connections are clean and in the correct condition.
(g) Connect the electrical connector (76) to the applicable proximity sensor (73).
(6) Install MLG extension proximity-sensors 23GA (22GA) as follows:
(a) Install the spacer (90) if applicable and the proximity sensor (99) on the sensor mounting bracket with:
1 The capscrews (91)
2 The washers (98)
3 The nuts (97).
(b) If you removed the target (92) during the removal procedure, do the steps that follow:
1 Put the spacer (94) if applicable, and the target (92) in position on the target mounting bracket.
2 Install the capscrews (93), the washers (95) and the nuts (96).
(c) Make sure that these items are in the positions identified before removal:
- The target (92)
- The proximity sensor (99)
- The spacers (94) and (90).
. (e) Remove the CAP-BLANKING from each electrical connector and receptacle.
(f) Make sure that all the electrical connections are clean and in the correct condition.
(g) Connect the electrical connector (100) to the applicable proximity sensor (99).
(7) Install MLG door-open proximity-sensors 33GA (32GA) and 35GA (34GA) as follows:
(a) Put the spacer (115) if applicable, and the proximity sensor (114) in position on the sensor mounting bracket.
(b) Install the screws (113), the washers (104) and the nuts (103).
(c) If you removed the target (108) during the removal procedure, do the steps that follow:
1 Install the spacer (109) if applicable, and the target (108) in position on the target mounting bracket.
2 Install the screws (107), the washers (112) and the nuts (111).
(d) Make sure that the target (108), the proximity sensor (114) and the spacer (109) if applicable, are in the positions identified before removal.
(e) TORQUE the nuts (103) and if necessary, the nuts (111) to between 0.192 and 0.124 m.daN (16.99 and 10.97 lbf.in )
. (f) Remove the CAP-BLANKING from each electrical connector and receptacle.
(g) Make sure that all the electrical connections are clean and in the correct condition.
(h) Connect the electrical connector (106) to the applicable proximity sensor (114).
(8) For MLG uplock proximity-sensors 9GA (8GA) and 11GA (10GA), apply Polysulfide Sealant-General Purpose Interfay Landing Gear (Material No.06AAC5) or Coating_- Flexible Structure (Material No.04QAB2) to:
- The capscrews (1) and (8)
- The washers (2) and (7)
- The nuts (5).
- The heads and tails of the capscrews (12) and (13)
- The nuts (16).
- The washers (11) and (14).
- The capscrews (36) and (30)
- The nuts (34).
- The capscrews (50) and (59)
- The nuts (54) and (57).
- The capscrews (71), (77), (91) and (93)
- The nuts (75), (81), (96) and (97).
- The screws (107) and (113)
- The nuts (103) and (111).
WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
B. Installation of the Proximity Sensors NOTE: It is permitted to install a sensor target without a shim if you can set the correct clearance without the shim.
(1) Install MLG uplock proximity-sensors 9GA (8GA) and 11GA (10GA) as follows:(a) Attach the bracket (3) to the applicable proximity sensor (4) with the washers (9), the cap screws (10) and the nuts (6).
(b) Put the shim (5), the bracket (3) and the applicable proximity sensor (4) in position on the MLG uplock.
(c) Install the washers (2) and the cap screws (1).
(d) Make sure that the items that follow are in the same position identified in the removal procedure:
- The shim (5)
- The bracket (3)
- The applicable MLG uplock proximity-sensor (4).
. (f) Safety the cap screws (1) with
(g) Remove the CAP-BLANKING from each electrical connector and receptacle.
(h) Make sure that all the electrical connections are clean and in the correct condition.
(i) For MLG uplock proximity-sensor 9GA (8GA):
1 Connect the electrical connector (7) to the proximity sensor (4).
(j) For MLG uplock proximity-sensor 11GA (10GA):
1 Connect the electrical connector (8) to the proximity sensor (4).
(2) Install MLG door-uplock proximity-sensors 27GA (26GA) and 29GA (28GA) as follows:
(a) Install the proximity sensor (11) as follows:
1 Put the proximity sensor (11) in position on the switch bracket (17).
2 Install the washers (16), the cap screws (15) and the nuts (23).
3 TORQUE the cap screws (15) to between 5.33 and 4.83 m.N (47.17 and 42.74 lbf.in )
.4 Put the items that follow on the MLG door uplock in the same position identified in the removal procedure:
- The switch bracket (17)
- The proximity sensor (11)
- The shim (12).
6 TORQUE the cap screws (14) to between 5.65 and 5.08 m.N (50.0 and 45.0 lbf.in )
.(b) Install the proximity sensor (27) as follows:
1 Put the proximity sensor (27) in position on the switch bracket (34).
2 Install the washers (35), the cap screws (36) and the nuts (28).
3 TORQUE the cap screws (36) to between 5.33 and 4.83 m.N (47.17 and 42.74 lbf.in )
.4 Put the items that follow on the MLG door uplock in the same position identified in the removal procedure:
- The switch bracket (34)
- The proximity sensor (27)
- The shim (26).
6 TORQUE the cap screws (24) to between 5.65 and 5.08 m.N (50.0 and 45.0 lbf.in )
.(c) Put the shim(s) (39) in position between the switch brackets (17) and (34).
(d) Install the cap screw (40), the washer (38) and the nut (37).
(e) TORQUE the nut (37) to between 5.33 and 4.83 m.N (47.17 and 42.74 lbf.in )
.(f) Connect the electrical connector (20) to the proximity sensor (11) as follows:
1 Remove the CAP-BLANKING from each electrical connector and receptacle.
2 Make sure that the electrical connector (20) is clean and in the correct condition.
3 Before you connect the electrical connector (20) to the proximity sensor (11):
- Put tape on the surface of the switch bracket (17) near the electrical connector (20) to prevent scratching the bracket.
5 Remove tape from the surface of the switch bracket (17).
6 Put the clamp blocks (18) in position and install the cap screws (19), the washers (21) and the nuts (22). Do not tighten the nuts (22) at this step.
CAUTION:
WHEN YOU APPLY PRESSURE TO THE CLAMP BLOCKS, TEMPORARILY TORQUE THE NUTS. THIS IS TO SAFETY THE CLAMP BLOCKS IN POSITION AND REMOVE THE CLEARANCE BETWEEN THE PARTS. IF YOU DO NOT OBEY THIS INSTRUCTION, THE CLAMP BLOCKS CAN FALL BECAUSE OF GRAVITY AND THERE WILL BE AN UNWANTED SPACE BETWEEN THE PARTS.
7 Apply pressure to the clamp blocks (18) to remove all relative motion between:- The proximity sensor (11), the electrical connector (20) and the clamp blocks (18).
.(g) Connect the electrical connector (32) to the proximity sensor (27) as follows:
1 Remove the CAP-BLANKING from each electrical connector and receptacle.
2 Make sure that the electrical connector (32) is clean and in the correct condition.
3 Before you connect the electrical connector (32) to the proximity sensor (27):
- Put tape on the surface of the switch bracket (34) near the electrical connector (32) to prevent scratching the bracket.
5 Remove the tape from the surface of the switch bracket (34).
6 Put the clamp blocks (31) in position and install the cap screws (33), the washers (30) and the nuts (29). Do not tighten the nuts (29) at this step.
CAUTION:
WHEN YOU APPLY PRESSURE TO THE CLAMP BLOCKS, TEMPORARILY TORQUE THE NUTS. THIS IS TO SAFETY THE CLAMP BLOCKS IN POSITION AND REMOVE THE CLEARANCE BETWEEN THE PARTS. IF YOU DO NOT OBEY THIS INSTRUCTION, THE CLAMP BLOCKS CAN FALL BECAUSE OF GRAVITY AND THERE WILL BE AN UNWANTED SPACE BETWEEN THE PARTS.
7 Apply pressure to the clamp blocks (31) to remove all relative motion between:- The proximity sensor (27), the electrical connector (32) and the clamp blocks (31).
.(3) Install MLG downlock proximity-sensor 15GA (14GA) as follows:
(a) Install the proximity sensor (37) on the lock stay with the cap screws (36).
(b) If you removed the target (31) during the removal procedure, do the steps that follow:
1 Put the spacer (32) (if applicable) and the target (31) in position on the target mounting bracket.
2 Install the cap screws (30), the washers (35) and the nuts (34).
(c) Make sure that the items that follow are in the same position identified in the removal procedure:
- The target (31)
- The proximity sensor (37)
- The spacer (32), if applicable.
. (e) Safety the cap screws (36) with
(f) Remove the CAP-BLANKING from each electrical connector and receptacle.
(g) Make sure that all the electrical connections are clean and in the correct condition.
(h) Connect the electrical connector (29) to the applicable proximity sensor (37).
(4) Install MLG downlock proximity-sensor 17GA (16GA) as follows:
(a) Install the proximity sensor (55) on the sensor mounting bracket with the cap screws (59), the washers (56) and the nuts (57).
(b) If the target (51) is removed, do the steps that follow:
1 Put the target spacer (52) (if applicable) and the target (51) in position on the target mounting bracket.
2 Install the cap screws (50), the washers (53) and the nuts (54).
(c) Make sure that the items that follow are in the same position identified in the removal procedure:
- The proximity sensor (55)
- The target (51)
- the spacer (52), if applicable.
. (e) Remove the CAP-BLANKING from each electrical connector and receptacle.
(f) Make sure that all the electrical connections are clean and in the correct condition.
(g) Connect the electrical connector (60) to the applicable proximity sensor (55).
(5) Install MLG extension proximity-sensor 21GA (20GA) as follows:
(a) Put the spacer (72) (if applicable) and the proximity sensor (73) in position on the sensor mounting bracket.
(b) Install the cap screws (71), the washers (74) and the nuts (75).
(c) If you removed the target (78) during the removal procedure, do the steps that follow:
1 Put the spacer (79) (if applicable) and the target (78) in position on the target mounting bracket.
2 Install the cap screws (77), the washers (80) and the nuts (81).
(d) Make sure that the items that follow are in the same position identified in the removal procedure:
- The target (78)
- The proximity sensor (73)
- The spacers (79) and (72), if applicable.
. (f) Remove the CAP-BLANKING from each electrical connector and receptacle.
(g) Make sure that all the electrical connections are clean and in the correct condition.
(h) Connect the electrical connector (76) to the applicable proximity sensor (73).
(6) Install MLG extension proximity-sensor 23GA (22GA) as follows:
(a) Put the spacer (90) (if applicable) and the proximity sensor (99) in position on the sensor mounting bracket.
(b) Install the cap screws (91), the washers (98) and the nuts (97).
(c) If you removed the target (92) during the removal, do the steps that follow:
1 Put the spacer (94) (if applicable) and the target (92) in position on the target mounting bracket.
2 Install the cap screws (93), the washers (95) and the nuts (96).
(d) Make sure that the items that follow are in the same position identified in the removal procedure:
- The target (92)
- The proximity sensors (99)
- The spacers (94) and (90).
. (f) Remove the CAP-BLANKING from each electrical connector and receptacle.
(g) Make sure that all the electrical connections are clean and in the correct condition.
(h) Connect the electrical connector (100) to the applicable proximity sensor (99).
(7) Install MLG door-open proximity-sensors 33GA (32GA) and 35GA (34GA) as follows:
(a) Put the spacer (115) (if applicable) and the proximity sensor (114) in position on the sensor mounting bracket.
(b) Install the screws (113), the washers (104) and the nuts (103).
(c) If you removed the target (108) during the removal, do the steps that follow:
1 Install the spacer (109) (if applicable) and the target (108) in position on the target mounting bracket.
2 Install the screws (107), the washers (112) and the nuts (111).
(d) Make sure that the items that follow are in the same position identified in the removal procedure:
- The target (108)
- The proximity-sensor (114)
- The spacer (109), if applicable
.(f) Remove the CAP-BLANKING from each electrical connector and receptacle.
(g) Make sure that all the electrical connections are clean and in the correct condition.
(h) Connect the electrical connector (106) to the applicable proximity sensor (114).
(8) For MLG uplock proximity-sensors 9GA (8GA) and 11GA (10GA), apply Polysulfide Sealant-General Purpose Interfay Landing Gear (Material No.06AAC5) or Coating_- Flexible Structure (Material No.04QAB2) to:
- The cap screws (1) and (10)
- The washers (2) and (9)
- The nuts (6).
- The heads and the tails of the cap screws (14), (15), (24), (36) and (40)
- The washers (13), (16), (25), (35) and (38)
- The nuts (23), (28) and (37).
- The cap screws (36) and (30)
- The nuts (34).
- The cap screws (50) and (59)
- The nuts (54) and (57).
- The cap screws (71), (77), (91) and (93)
- The nuts (75), (81), (96) and (97).
- The screws (107) and (113)
- The nuts (103) and (111).
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 32-31-73-869-053-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | LGCIU/BAT SPLY/SYS2 | 59GA | R33 |
| 121VU | LGCIU/BAT SPLY/SYS1 | 58GA | R32 |
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | LGCIU/BAT SPLY/SYS2 | 59GA | R32 |
| 121VU | LGCIU/BAT SPLY/SYS1 | 58GA | R31 |
D. Ground Configuration
(1) If you did the flight configuration precautions, put the aircraft back to the ground configuration (Ref. AMM TASK 32-00-00-860-002).
Subtask 32-31-73-410-051-A (1) If you did the flight configuration precautions, put the aircraft back to the ground configuration (Ref. AMM TASK 32-00-00-860-002).
E. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
(3) Close the MLG doors (Ref. AMM TASK 32-12-00-410-001).
Subtask 32-31-73-740-050-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
(3) Close the MLG doors (Ref. AMM TASK 32-12-00-410-001).
F. Test
(1) Do a BITE test of the landing gear (Ref. AMM TASK 32-69-00-740-001).
(2) For proximity-sensors 15GA (14GA), 17GA (16GA), 21GA (20GA), 23GA (22GA), 33GA (32GA) and 35GA (34GA):
5. Close-up(1) Do a BITE test of the landing gear (Ref. AMM TASK 32-69-00-740-001).
(2) For proximity-sensors 15GA (14GA), 17GA (16GA), 21GA (20GA), 23GA (22GA), 33GA (32GA) and 35GA (34GA):
- Do an inspection of the applicable MLG proximity-sensor and target clearance (Ref. AMM TASK 32-31-73-200-001).
- The proximity-sensor was only replaced
- The target and the bracket were not moved
- The shim was installed in the same position.
Subtask 32-31-73-942-050-A
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the SAFETY BARRIER(S).
(3) Remove the WARNING NOTICE(S).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the SAFETY BARRIER(S).
(3) Remove the WARNING NOTICE(S).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
MLG Uplock and Door Uplock Proximity-Sensors