Reactivation of LGCIU-2
TASK 32-31-00-440-804-A
Reactivation of LGCIU-2
1. Reason for the Job
MMEL 32-31-01
LANDING GEAR CONTROL AND INTERFACE UNIT NO. 2 (FAA ONLY)
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 32-31-00-861-063-A
Subtask 32-31-00-440-054-A
Subtask 32-31-00-410-087-A
[Rev.10 from 2021]
2026.04.01 00:43:45 UTC
Reactivation of LGCIU-2
1. Reason for the Job
MMEL 32-31-01
LANDING GEAR CONTROL AND INTERFACE UNIT NO. 2 (FAA ONLY)
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 32-00-00-860-001-A | Flight Configuration Precautions with Electrical Power |
| TASK 32-00-00-860-001-A-01 | Flight Configuration Precautions without Electrical Power |
| TASK 32-00-00-860-002-A | Ground Configuration after Flight Configuration with Electrical Power |
| TASK 32-00-00-860-002-A-01 | Ground Configuration after Flight Configuration without Electrical Power |
| TASK 32-31-00-720-002-A | Functional Test of the Normal Extension and Retraction of the Landing Gear |
| TASK 32-69-00-740-001-A | BITE Check of Landing-Gear Control Interface-Unit (LGCIU) With Use of MCDU to Ensure that Continuous BITE is Operative |
Subtask 32-31-00-861-063-A
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 32-31-00-941-103-A Subtask 32-31-00-865-143-A (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
C. Table of the circuit breakers used in this procedure:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | LGCIU/BAT SPLY/SYS2 | 59GA | R33 |
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | LGCIU/BAT SPLY/SYS2 | 59GA | R32 |
Subtask 32-31-00-440-054-A
A. Reactivation of LGCIU-2
(1) Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 32-31-00-740-052-A (1) Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
- 2GA
- 59GA.
B. BITE
(1) Do the BITE test of the LGCIU (Ref. AMM TASK 32-69-00-740-001).
5. Close-up(1) Do the BITE test of the LGCIU (Ref. AMM TASK 32-69-00-740-001).
NOTE: As an alternative procedure, you can do the functional test normal extension and retraction of the landing gear (Ref. AMM TASK 32-31-00-720-002).
Subtask 32-31-00-410-087-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
Subtask 32-31-00-860-154-A (1) Make sure that the work area is clean and clear of tools and other items.
B. Put the aircraft back to its initial configuration.
(1) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
(1) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).