1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
SAFETY BARRIER(S)
No specific
1
TROLLEY - LIFTING
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 0.35 and 0.25 m.daN (30.97 and 22.12 lbf.in ) T
No specific
Torque wrench: range to between 1.25 and 1 m.daN (110.62 and 88.50 lbf.in ) T
No specific
Torque wrench: range to between 2 and 1.7 m.daN (14.75 and 12.54 lbf.ft ) T
No specific
Torque wrench: range to between 25 and 22 m.daN (184.37 and 162.24 lbf.ft ) T
J47564
1
ADAPTOR
J47999
1
GUIDE CONE
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.06ABB1)
Polysulfide Sealant-Fuel Tank Fillet -
(Material No.06LDG2)
Non Hardening Jointing Putty-High Temp. Area - Structure
(Material No.08ABC1)
Aqueous Cleaner-Aircraft Exterior Pressure Spraying -
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14QFB1)
Wire-Locking Dia: 0.8 mm CRES Nickel Alloy -
 C. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
14
SCRAPER
AIPC 32-21-11-43-230
12
RING
AIPC 32-21-11-43-250
13
SEAL
AIPC 32-21-11-43-260
14
SCRAPER
AIPC 32-21-11-63-230
12
RING
AIPC 32-21-11-63-250
13
SEAL
AIPC 32-21-11-63-260
14
SCRAPER
AIPC 32-21-11-83-230
12
RING
AIPC 32-21-11-83-250
13
SEAL
AIPC 32-21-11-83-260
5
PACKING
AIPC 32-21-13-11-110
22
COTTER PIN
AIPC 32-21-13-12-100
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 07-11-00-581-001-A
Lifting for Aircraft Maintenance Operations
TASK 07-11-00-586-001-A
Lowering of the Aircraft at Forward Jacking Point, MLG Wheels on the Ground
TASK 12-12-32-611-005-A
NLG Shock Absorber Oil Replenishment and Nitrogen Filling (Aircraft on Jacks)
TASK 12-14-32-614-004-A
Check NLG Shock Absorber Charge Pressure
TASK 12-22-32-640-002-A
Lubrication of Nose Landing Gear and Doors
TASK 32-21-27-400-002-A
Installation of the Torque-Link Center Hinge
TASK 32-21-41-400-001-A
Installation of the NLG TOWING attachment
TASK 32-22-00-010-001-A
Nose Gear Doors - Ground Doors Opening
TASK 32-22-00-410-001-A
Nose Gear Doors - Ground Doors Closing
TASK 32-31-00-720-002-A
Functional Test of the Normal Extension and Retraction of the Landing Gear
TASK 32-31-00-720-003-A
Functional Test of the Normal Extension and Retraction of the Nose Landing Gear
TASK 32-41-12-400-001-A
Installation of the NLG Wheel
3. Job Set-up
Subtask 32-21-13-850-051-B ** ON A/C NOT FOR ALL
A. AFR Required CAUTION
Subtask 32-21-13-860-056-A ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) In the cockpit, on the panel 400VU, make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to operate the landing gear control lever.
   (2) On the steering handwheel (CAPT and F/O) and on the brake pedals, make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to operate them.
   (3) Make sure that the SAFETY BARRIER(S) are in position.
   (4) Make sure that the aircraft is lifted with jacks (Ref. AMM TASK 07-11-00-581-001).
   (5) Make sure that the doors of the nose landing gear are open (Ref. AMM TASK 32-22-00-010-001).
   (6) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position in zone 123.
Subtask 32-21-13-865-057-A ** ON A/C NOT FOR ALL
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/SPLY4GGM36
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/CTL3GGM35
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/CTL1GGM34
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY2GGM33
4. Procedure
Subtask 32-21-13-110-052-D ** ON A/C NOT FOR ALL
A. Preparation for Installation
   (1) Clean all the removed parts with Aqueous Cleaner-Aircraft Exterior Pressure Spraying - (Material No.08ABC1) and dry them with compressed air.
   (2) Make sure that the parts and the chromed surfaces are in the correct condition.
   (3) Make sure that the three friction pads (11) are in position in the upper part of the shock strut.
   (4) Make sure that the scraper (14) is in the correct condition. Replace the AIPC 32-21-11-43-230 SCRAPER (14) or AIPC 32-21-11-63-230 SCRAPER (14) or AIPC 32-21-11-83-230 SCRAPER (14) if necessary
   (5) To prevent damage to the scraper (14) during installation, install it on the shock absorber (10). You will push the scraper (14) in its housing when you engage the shock absorber in the upper bearing.
   (6) Systematically replace the
AIPC 32-21-11-43-260 SEAL (13) or AIPC 32-21-11-63-260 SEAL (13) or AIPC 32-21-11-83-260 SEAL (13) and the AIPC 32-21-11-43-250 RING (12) or AIPC 32-21-11-63-250 RING (12) or AIPC 32-21-11-83-250 RING (12).
   (7) Clean the attachment hardware with Non Aqueous Cleaner-General - - (Material No.
08BAA9) and dry them with filtered compressed air.
   (8) Apply a light coat of Non Hardening Jointing Putty-High Temp. Area - Structure (Material No.06LDG2) to the threads of all the nuts, screws, bolts and pins.
   (9) Apply a light layer of Non Hardening Jointing Putty-High Temp. Area - Structure (Material No.06LDG2) to the threaded parts and the stop plate (4).
   (10) Apply a light layer of Non Hardening Jointing Putty-High Temp. Area - Structure (Material No.06LDG2) to the lugs of the shock absorber upper part.
Subtask 32-21-13-420-056-D ** ON A/C NOT FOR ALL
B. Installation of the Shock Absorber Assy
F Nose Gear Shock Absorber ** ON A/C NOT FOR ALL
CAUTION: WHEN YOU INSTALL THE SHOCK ABSORBER, MAKE SURE THAT YOU ALIGN THE PISTON LUGS WITH THE SLOTS IN THE SHOCK STRUT BACKPLATE. THE SHOCK ABSORBER WILL THUS BE IN THE CORRECT POSITION (THE WHEEL AXLE PERPENDICULAR TO THE AIRCRAFT CENTERLINE). AN INCORRECT INSTALLATION CAN CAUSE IMPORTANT DAMAGE TO THE NLG.
   (1) Install the shock absorber on the TROLLEY - LIFTING.
   (2) Install the J47999 GUIDE CONE on the threaded part of the sliding tube.
   (3) Release the nitrogen pressure and fully compress the shock absorber.
   (4) Make sure that the bush (9) is in position on the shock absorber (10).
   (5) Slowly engage the shock absorber in the shock strut. Be careful not to cause damage to the friction pads (11) when the shock absorber goes near the upper self-aligning bearing.
   (6) Push the scraper (14) in its housing.
   (7) Lift the shock absorber (10) to align the lugs of the piston with the slots in the shock-strut backplate (8).
   (8) Remove the J47999 GUIDE CONE from the threaded part of the sliding tube.
NOTE: When the shock absorber (10) is fully engaged in the top of the shock strut (7), the length of the thread (15) that you can see is between 17 and 18 mm (0.67 and 0.71 in.).
   (9) Install and TORQUE the nut (6) with the J47564 ADAPTOR to between 25 and 22 m.daN (184.37 and 162.24 lbf.ft ) T.
   (10) Install the charging valve:
     (a) Install the stop plate (4).
     (b) Install the valve (1) with a new
AIPC 32-21-13-11-110 PACKING (5).
     (c) TORQUE the valve (1) to between 1.25 and 1 m.daN (110.62 and 88.50 lbf.in )
T and safety with 14QFB1Wire-Locking Dia: 0.8 mm CRES Nickel Alloy -.
     (d) Install the washer (3) and the screw (2).
     (e) TORQUE the screw (2) to between 0.35 and 0.25 m.daN (30.97 and 22.12 lbf.in )
T .
   (11) Remove the TROLLEY - LIFTING.
   (12) Do the NLG shock-absorber oil-replenishment and nitrogen filling (
Ref. AMM TASK 12-12-32-611-005).
     (a) Do not lower the aircraft onto its wheels after the NLG shock-absorber oil-replenishment and nitrogen filling.
   (13) With the shock absorber fully extended, make sure that the wheel axle is perpendicular to the aircraft centerline.
NOTE: In the fully extended position of the shock absorber, the NLG is automatically centered (the nose wheel steering is in zero position).
     (a) Make sure that dimension H of the extended part of the NLG sliding tube between:
  • The lower area of the NLG lower bearing and the upper surface of the towing fitting lug is between 454.6 mm (17.8976 in.) and 445.6 mm (17.5433 in.).

   (14) To make sure that the anti-rotation lugs are engaged in the slots of the back plate:
     (a) Try to turn the NLG shock absorber around its vertical axis.
     (b) Make sure that the shock absorber does not turn.
       1 If the shock absorber turns, remove it to install the cams in the correct position.
NOTE: If you can turn the shock absorber, this shows that the anti-rotation lugs are not engaged in the slots. This is because the centering cams are not correctly installed.
   (15) Install the stop (62), the bolts (64), the washers (61) and (63) and the nuts (60). Tighten the nuts (60).
     (a) Make sure that there are no hard points when you move the torque links through their full travel.
   (16) Connect the center hinge (Ref. AMM TASK 32-21-27-400-002).
Subtask 32-21-13-420-057-B ** ON A/C NOT FOR ALL
C. End of the Installation
   (1) Install the support (21).
   (2) Install the bolt (20) with its head up and install the nut (23).
   (3) TORQUE the nut (23) to between 2 and 1.7 m.daN (14.75 and 12.54 lbf.ft ) T and safety it with a AIPC 32-21-13-12-100 COTTER PIN (22).
   (4) Install the wheels on the nose landing gear (
Ref. AMM TASK 32-41-12-400-001).
NOTE: Lower the aircraft to make the installation of the wheels easier.
   (5) Install the towing fitting (Ref. AMM TASK 32-21-41-400-001).
Subtask 32-21-13-865-058-A ** ON A/C NOT FOR ALL
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/SPLY4GGM36
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/CTL3GGM35
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/CTL1GGM34
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY2GGM33
Subtask 32-21-13-941-056-A ** ON A/C NOT FOR ALL
E. Preparation for the Test
   (1) Fill the shock absorber with hydraulic fluid (Ref. AMM TASK 12-12-32-611-005).
   (2) Charge the shock absorber with nitrogen (Ref. AMM TASK 12-14-32-614-004).
   (3) With the shock absorber fully extended, make sure that the wheel axle is perpendicular to the aircraft centerline.
NOTE: In the fully extended position of the shock absorber, the NLG is automatically centered (the nose wheel steering is in the zero position).
     (a) Make sure that dimension H of the extended part of the NLG sliding tube between the lower area of the NLG lower bearing and the upper surface of the towing fitting lug is between 454.6 mm (17.8976 in.) and 445.6 mm (17.5433 in.).
F NLG Shock Absorber - Clearance ** ON A/C NOT FOR ALL
   (4) Lubricate the nose landing gear (Ref. AMM TASK 12-22-32-640-002).
   (5) Apply a layer of Polysulfide Sealant-Fuel Tank Fillet - (Material No.06ABB1) in areas F.
   (6) Remove the access platform(s).
Subtask 32-21-13-720-052-A ** ON A/C NOT FOR ALL
F. Test
   (1) Do the functional test of the NLG normal extension and retraction (Ref. AMM TASK 32-31-00-720-003) or (Ref. AMM TASK 32-31-00-720-002).
5. Close-up
Subtask 32-21-13-860-057-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
   (1) Lower the aircraft on its wheels (Ref. AMM TASK 07-11-00-586-001).
   (2) Remove the safety barriers.
   (3) Remove the WARNING NOTICE(S).
   (4) Make sure that the work area is clean and clear of tools and other items.
Subtask 32-21-13-410-052-A ** ON A/C NOT FOR ALL
B. Close Access
   (1) Close the nose gear doors (Ref. AMM TASK 32-22-00-410-001).